1 / 16

Advancements in Particle Physics: Unraveling Mysteries of the Universe

Explore the breakthroughs in nuclear and particle physics, from Higgs boson to LHC experiments, involving CNRS, CERN, and global collaborations like the AUGER experiment. Discover the latest research in the field.

orla-spence
Download Presentation

Advancements in Particle Physics: Unraveling Mysteries of the Universe

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CNRS/in2p3 François Le Diberder

  2. CNRS 14 000 Researchers12 000 Engineers, Technicians, Administrative 1300 laboratories ST2I MPPU IN2P3 INSU SPM STIC SPI SC SDV SHS Universe Nuclear Particle Physics Maths Bio. Computing Engineer Chemistry Humanities +600 : universities and postdocs Personnel (permanent CNRS positions): 1931 2671 2833 1317 1409 3496 5748 3969 CNRS Budget: 2,3 G€ (bulk of it is for salaries)

  3. Astro Physique CPPM LPSC IPNL LPC Cl LAPP IPHC LPNHE LLR LAL Particle AstroPhysics Nuclear Physics Particle Physics CC-IN2P3 IN2P3

  4. Far away galaxies with active nucleus Pierre Darriulat Breaking News Origin of very high energy cosmic rays is understood Vietnam is a partner in this very important discovery AUGER experiment James Cronin (Nobel 1980)

  5. VIETNAM SCHOOL OF PHYSICS Patrick Aurenche Since 1993 VATLY, a cosmic ray laboratory in Hanoi, progress report Pierre Darriulat Tran Thanh Van France-Vietnam Master in Nuclear an Particle Physics http://www.inst.gov.vn/inst/English/About/VATLY/Vatly.htm Argentina PN Diep, PN Dong, PTT Nhung, P Darriulat, NT Thao, DQ Thieu and VV Thuan VATLY, INST, Hanoi, Vietnam

  6. The thing giving masses to elementary particles Higgs boson t t When I think about a proton, that is what I have in mind

  7. Major experiments to unravel the mysteries of particle physics CERN 2008 - 2020

  8. CERN 6500 users per institute ( +2500 from CERN)

  9. LHC GRID is a reality

  10. CNRS investments are very well targeted toward CERN 100 M € to CERN/year France is a key partner 20 +10 2.5 M €/year 5 M €/year

  11. ? 2019 ? International Linear Collider February2007 August2007 RDR approved dGDE LoI: 2008

  12. LIA Long term collaboration LHC ILC LHC ILC

  13. LIA • « Virtual » laboratories : a CNRS concept • Very efficient to coordinate efforts. • => High level agreements between CNRS and the foreign partners. • F?-PPL : France-?Particle Physics Laboratory. • To set-up FVietnam-PPL is our wish. • May imply France and Vietnam and more

  14. L. Roos V. Breton D. Perret-Gallix FC-PPL FK-PPL FJ-PPL Patrick Aurenche FV-PPL • Major Goals : • AUGER experiment in Hanoi • Grid technology in Vietnam • ACGRID 2007 (Do Son) • Avian-Flu network • ATLAS Vietnam groups Nuclear Physics (GANIL) Master

  15. FK-PPL FC-PPL FJ-PPL Taiwan Tier 1 Egee-Asia FV-PPL CC-IN2P3 CNRS A key element in our approach is the LHC Grid

More Related