An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ACTIA and ACCMA Boards Workshop on the State Infrastructure Bond Package Presented by ACTIA and ACCMA Staffs May 25, 2006

  2. Purpose of Workshop • Provide early information to both Boards • Receive early direction to develop strategies for: • Influencing future programming policies and decisions by MTC,CTC, and Caltrans • Outreaching to and engaging Local Stakeholders • Outreaching to and engaging Local jurisdictions in Alameda County • Having one voice on priorities for improvements in the County using potential Bond funds • Engaging our Legislative Delegation in Sacramento • Maximize the County’s receipt of Bond Funds

  3. Bond Package Summary • Five Propositions with dollars • Prop 1A – Prop 42 Firewall • Prop 1B -- $19.9 billion for Transportation • Prop 1C -- $2.85 billion for Housing • Prop 1D -- $10.4 billion for Education • Prop 1E -- $4.1 billion for Flood Protection

  4. Bond Package Summary • Four Trailer Bills as Implementation Legislation • AB 1039 – CEQA exemption for specific transportation and flood control projects • AB 1468 – 4 toll roads and 4 high occupancy toll (HOT) lanes. • AB143 – 10 design-build projects (failed passage in the Assembly) • SCA 7 – Prop 42 protection

  5. Proposition 1B -- Transportation Bond or Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006 (SB 1266 – Perata) • $4.5 billion for Corridor Mobility Improvements • $3.1 billion for California Ports Infrastructure, Security, and Air Quality Improvement Account -- $2 billion for Trade Corridor Improvements • $1 billion for State-Local Partnership Fund • $2 billion for STIP • $4 billion for Public Transportation Modernization, Improvements, and Service Enhancements • $2 billion for Local Streets and Road Improvements and Traffic Safety • $1 billion for Transit System Safety and Disaster Response • $125 million for Local Bridges Seismic Retrofit • $250 million for high priority railroad-highway grade separations • $750 million for the SHOPP • $200 million for School Bus Retrofitting and Replacement

  6. Prop 1C – Housing Bond • $2.85 billion total • Includes $300 million in Grants for Transit Oriented Development

  7. Let’s Focus on Three Funding Programs in the Transportation Bond… • The Corridor Mobility Improvement -- $4.5 billion • The Trade Corridors Improvement -- $2 billion • State Local Partnership -- $1 billion

  8. Corridor Mobility Improvements • $4.5 billion, subject to north-south 40/60 split • Known Deadlines • CTC adopts guidelines by December 1, 2006 • We must nominate projects by January 15, 2007 • CTC adopts initial program of projects by March 1, 2007 • Known Eligibility Criteria for Projects • Must have a high priority at both the State and regional levels or local funds dedicated to the project. • Must able to start Construction by December 31, 2012. • Improves mobility in a high-congestion corridor, improves connectivity of the State highway system, or improves operations and safety of a highway. • Improves access to jobs, housing, markets, and commerce.

  9. Corridor Mobility Improvements … Issues • Are Transit Projects Eligible, such as BART Extension to Warm Springs? • How will the Region and the State prioritize projects? • What will be the CMA and ACTIA programming principles? • What will be the process for CMA and ACTIA staff to participate in the development of the guidelines at the State level?

  10. Most Congested Corridors … 40% of Bay Area Congestion is in Alameda County

  11. Corridor Mobility Improvements … Example Projects • Altamont Freight Corridor • I-580 Corridor in Tri-Valley • I-238 in Central County • I-880 in North and Central County • I-80 in North County • BART Extension to Warm Springs

  12. Trade Corridors Improvements • $2 billion for federally designated “Trade Corridors of National Significance” • Deadlines not yet established • Known Eligibility Criteria for Projects • Provides highway capacity and operational improvements to move freight more efficiently • Truck Corridors improvements, including dedicated truck lanes • Freight rail system improvements • Enhances capacity and efficiency at Ports • Surface transportation improvements to facilitate goods movement to and from airports • Must have supplemental funding that is at least equal to the amount contributed by this fund

  13. Trade Corridor Improvements … Issues • How is “Trade Corridors of National Significance” defined? I-580, I-880, I-238? • What guidelines will CTC have? • Can the matching supplemental funds be State, Federal, or funds from other Infrastructure Bond Programs? • What will be the Port’s role?

  14. Trade Corridors Improvements … Example Projects • Various Altamont Freight Corridor Projects • I-580 Corridor in Tri-Valley • I-238 in Central County • I-880 in North and Central County • 7th Street/Union Pacific Railroad Grade Separation • I-880/23rd and I-880/29th Streets Interchanges

  15. State Local Partnership Program • $1 billion to benefit those counties that have enacted a transportation sales tax program such as ACTA and ACTIA Measure B Program, or have other local funds for transportation • Will require a dollar-for-dollar match of local funds • Known Deadlines – CTC will allocate these funds over 5 years

  16. State Local Partnership Program … Issues • Matching ratio may be too high for the State to have sufficient funds to fund this program. Dollar-for-dollar matching ratio may not work. • What will be the criteria for project selection and what type of projects are eligible – transit, local streets, highways? • Are projects with STIP or other State funds (TCRP) eligible? • Are projects with local funds other than sales tax Measure funds eligible? • Will funds be used for construction only? • Follow up legislation may be required

  17. State Local Partnership Program … Example Projects • All Projects in the Measure B Expenditure Plans • Other locally funded projects • Eligibility and priorities depends on guidelines and readiness • Fund Exchange? • Only submit certain projects?

  18. Recommendations • Approval of the Formation of a Working Group comprised of Board members from CMA, ACTIA, Port of Oakland, EDAB, BART, and AC Transit to solicit project needs and for advocacy • Approve a joint letter to the above agencies requesting their participation in the Working Group • Request that the respective Chairs of ACCMA and ACTIA to appoint 2 members from each Board to the Working Group

  19. Next Steps • Staff will coordinate with partner agencies (Caltrans, MTC, Port, etc.) on a list of candidate projects • Schedule a workshop with ACTAC in June to review candidate projects • Potential Board Actions in June: • Authorization to proceed with Project Study Reports for some candidate projects • Review of timeline for development of County project list • Adoption of action plan for outreach and engagement to other stakeholders (EDAB, Chambers, City Councils, Caltrans Director, Bay Area Legislative Delegation, etc.)

  20. Questions and Answers Discussions