An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 08-quality/ Quality-plan/ Change-control-plan/ Progress-reports/ Templates/ index.htm Activity Monitoring Tool MIS 2008/2009 Software Project - Group 1

  2. Quality Plan • Quality Scope & Metrics • Quality Activities to Assure project quality • Walkthrough • Review • Inspection • Lessons Learned • Test Campaign • Bugs Tracking

  3. Nº of quality activities conducted ( walkthough, review, and inspection ) Nº of changes to project schedule and milestones Nº of tests failed and passed Change Request Impact Network Knowledge Lessons Learned Self evaluation Quality Scope & Metrics • Software is developed right the first time as much as possible • User safisfiction • Conformance to correct requirements

  4. Quality Activities - Walkthrough • Items under review: • Project Information • Risk Analysis • Code modules

  5. Quality Activities - Review • Items under review: • System Architecture • Test Campaign Plan • User Requirements • System Architecture • Detailed Design • Test Campaign • Quality Assurance Plan • Software Development Plan

  6. Quality Activities - Inspection • Module of database • Module of detecting and tracking windows application • Software Requirements Specification

  7. Lessons Learned • Culture mades difficult to find a perfect quality model • Tracking good practicies and promote them • Each Team Member should give at least two original lessons

  8. Test Campaign • Test Campaign Plan • Unit Testing • Based in the detailed design • Informal • Acceptance Testing • Based in the system requirements • Formal • Test Campaign Report • Implementation • Analisys and reporting

  9. Bugs Tracking (1) • Every defect found at the implementation stage should be report with the google codes tool

  10. Bugs Tracking (2) • Because the Project Team is not properly aware of the utilization of this kind of tools, has been decided that it will remain in a experimental stage

  11. Change control plan • Product Management • Document Lifecycle • Templates • Document identifier • Change Control Process • Lifecycle of a Change Request • Change Control Board • Repository • Project Resources

  12. Product Management • Lifecycle of a document • Document identifier: isec-deis-mis-ds-ps-0809-g1-amt-xxx-document-name.bbb • Templates: • 08-quality/templates

  13. Change Control Process • Change Control Board: • Ricardo Machado • Ricardo Silva • Eduardo Pratas • Luciano Diniz • Ivo Santos • Gilson Cabral

  14. Index.htm

  15. Templates • isec-deis-mis-ds-ps-0809-g1-amt-crf-change-request-form_00.doc • isec-deis-mis-ds-ps-0809-g1-amt-mmt-template_yyyymmdd.doc • isec-deis-mis-ds-ps-0809-g1-amt-mmt-template_yyyymmdd.xls • isec-deis-mis-ds-ps-0809-g1-amt-xxx-report-template.doc