1 / 30

Energy Recovery Linacs and SRF

Energy Recovery Linacs and SRF. Dmitry Kayran Collider-Accelerator Department Brookhaven National Laboratory. Outline Introduction ERLs around the world Goals of R&D ERL at BNL BNL ERL general layout, parameters and SRF components Conclusion. Main accelerator types.

ona
Download Presentation

Energy Recovery Linacs and SRF

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Energy Recovery Linacs and SRF Dmitry Kayran Collider-Accelerator Department Brookhaven National Laboratory RHIC & AGS Annual Users’ Meeting, June 3, 2009

  2. Outline • Introduction • ERLs around the world • Goals of R&D ERL at BNL • BNL ERL general layout, parameters and SRF components • Conclusion RHIC & AGS Annual Users’ Meeting, June 3, 2009

  3. Main accelerator types ERL Basic idea: Bring the beam through the accelerating structures timed in a way so that the second-pass beam is decelerated, i.e. delivering its energy to the cavity fields. 1) Accelerate in 1st pass of RF cavity 2) The return loop is N plus ½ RF wavelengths. 3) Recovery energy in 2nd pass RF cavity RHIC & AGS Annual Users’ Meeting, June 3, 2009

  4. Energy recovery* linacs (ERLs) (with the same cavity energy recovery) Problems: a – colliding beams, b – focusing of two beams with different energies in the RF accelerator. *Energy Recovery - process by which the energy invested in accelerating particles is returned to the RF cavities by decelerating them, and re-used to accelerate others RHIC & AGS Annual Users’ Meeting, June 3, 2009

  5. First Energy Recovery demonstration Same-cell energy recovery was first demonstrated at Stanford University the SCA/FEL project in July 1986 Beam was injected at 5 MeV into a ~50 MeV linac (up to 95 MeV in 2 passes), 150 μA average current (12.5 pC per bunch at 11.8 MHz) All energy was recovered. FEL was not in place. • Now the world-record energy recovery demonstration current is 30 mA at the Novosibirsk BudkerINP NovoFEL (2003) RHIC & AGS Annual Users’ Meeting, June 3, 2009

  6. Power Multiplication Factor An advantage of energy recovered recirculation is nicely quantified by the notion of a power multiplication factor: where Prf is the RF power needed to accelerate the beam. By the first law of thermodynamics (energy conservation!) k < 1 in any linac not recirculated. Beam recirculation with beam deceleration somewhere is necessary to achieve k > 1. If energy IS very efficiently recycled from the accelerating to the decelerating Examples CEBAF no recovery (matched load) k=0.99; (typical) k=0.8 JLAB IR DEMO k=16; JLAB 10 kW Upgrade k=33 RHIC & AGS Annual Users’ Meeting, June 3, 2009

  7. JLab demonstration: Energy Recovery Works With energy recovery the required linac RF power is ~ 16 kW, nearly independent of beam current. It rises to ~ 36 kW with no recovery at 1.1 mA. Gradient modulator drive signal in a linac cavity measured without energy recovery (signal level around 2 V) and with energy recovery (signal level around 0.) RHIC & AGS Annual Users’ Meeting, June 3, 2009

  8. Benefits of Energy Recovery • Required RF power becomes nearly independent of beam current. • Increases overall system efficiency. • Reduces electron beam power to be disposed of at beam dumps (by ratio of Efin/Einj). • More importantly, reduces induced radioactivity (simplify shielding) if beam is dumped below the neutron production threshold. • Promises efficiency near that of storage rings, while maintaining beam quality of linacs: superior emittance and energy spread, short bunches. RHIC & AGS Annual Users’ Meeting, June 3, 2009

  9. Operational high power ERLs RHIC & AGS Annual Users’ Meeting, June 3, 2009

  10. RHIC & AGS Annual Users’ Meeting, June 3, 2009

  11. RHIC & AGS Annual Users’ Meeting, June 3, 2009

  12. RHIC & AGS Annual Users’ Meeting, June 3, 2009

  13. RHIC & AGS Annual Users’ Meeting, June 3, 2009

  14. Some more uses of ERLs • Operational ERLs now are used for FEL application • The advantages of ERLs well beyond of that : • Average current-carrying capability of storage-ring. • Smaller beam emittance and energy spread. • Higher photon brilliance and coherence, round sources, and short-pulse-length radiation. 100-fsec pulse width domain. • Efficient way to use RF power Make the ERLs great machines for the future: • Light sources • High energy electron coolers of ions (previous talk) • Electron ion colliders (next talk) RHIC & AGS Annual Users’ Meeting, June 3, 2009

  15. e-cooling (RHIC II) PHENIX Main ERL (3.9 GeV per pass) STAR e+ storage ring 5 GeV - 1/4 RHIC circumference Four e-beam passes Goals for ERL R&D at BNL • R&D ERL will serve as a test-bed for future RHIC projects: • ERL-based electron cooling (conventional or coherent). • 10-to-20 GeV ERL for lepton-ion collider eRHIC. • Test the key components of the High Current ERL based solely on SRF technology • SRF Photoinjector (703.5 MHz SRF Gun, photocathode, laser, merger etc.) test with 500 mA. • -Preservation of high-charge, low emittance. • High current 5-cell SRF linac test with HOM absorbers • -Single turn - 500 mA • Stability criteria for CW beam current. • Attainable ranges of electron beam parameters in SRF ERL. RHIC & AGS Annual Users’ Meeting, June 3, 2009

  16. ERLs beam parameters *) To demonstrate 3 min cooling time for proof pf principal of CeC for single Au bunch at 40GeV/nucl (above transition) with 1e09 particles 66cm length energy recovery may not be necessary. To improve energy spread 3rd harmonic cavity and increase injection energy will help RHIC & AGS Annual Users’ Meeting, June 3, 2009

  17. High Power ERL landscape Commissioned Under construction In design stage RHIC & AGS Annual Users’ Meeting, June 3, 2009

  18. Cryo-module Beam dump e- 2.5 MeV SRF cavity 1 MW 703.75 MHz Klystron Schematic Layout of the BNL R&D ERL e- 15-20 MeV Return loop Laser Cryo-module Merger system e- 2.5MeV SC RF Gun 50 kW 703.75 MHz system Control room RHIC & AGS Annual Users’ Meeting, June 3, 2009

  19. BNL ERL Injector: beam dynamics simulation results 5 cell SRF cavity SRF Gun 70 cm 15º 190 cm 99.5 cm 70 cm -15º -30º Laser port 15 120 100 Horizontal Vertical 80 10 60 40 5 20 0 0 10 2 8 4 6 10 2 8 4 6 30º RMS normilized emittance, mm-mrad RMS normilized emittance, mm-mrad Distance from the cathode, m Distance from the cathode, m PARMELA simulations shown: the small emittances can be achieved using bear-can initial distribution Blue 5 nC Red 1.4 nC Green 0.7 nC 4.8/5.3 um 2.2/2.3 um 1.4/1.4um RHIC & AGS Annual Users’ Meeting, June 3, 2009

  20. ERL loop lattice is very flexible Lattice  and D functions of the ERL for the different cases longitudinal dispersions (Ds=M56): No dispersion b, m Dispersion, m Dispersion, m b, m Positive longitudinal dispersion Zero longitudinal dispersion Dispersion, m b, m Transverse normalized emittances from cathode to dump Q=0.7 nC (PARMELA simulation) Negative longitudinal dispersion RHIC & AGS Annual Users’ Meeting, June 3, 2009

  21. Layout of R&D ERL in Bldg. 912 at BNL RHIC & AGS Annual Users’ Meeting, June 3, 2009

  22. R&D ERL beam parameters (PARMELA simulation result two operational regimes ) Operation regime Parameter RHIC & AGS Annual Users’ Meeting, June 3, 2009

  23. Why use SRF Technology? Since RF power for ERL operation no longer depends on beam current, main losses are wall losses: for SRF cavities high Q’s mean small wall losses Quality Factor Q0: RHIC & AGS Annual Users’ Meeting, June 3, 2009

  24. Linac Cryomodule 5 cell SRF cavity 703 MHz, 20 MV/m @ Qo=1e10 Ferrite Dampers for HOMs RHIC & AGS Annual Users’ Meeting, June 3, 2009

  25. BNL 5 Cell SRF Linac F = 703.75 MHz, E = 20 MeV Q0~ 1010, QHOM ~ 103 LHe Ballast Tank • The 5-cell cavity was specifically designed for • high current, high bunch charge applications such as eRHIC and high energy electron cooling. • The loss factor of the cavity was minimized. • The number of cells was limited to 5 to avoid HOM trapping. • Additionally, HOM power is effectively evacuated from the cavity via an enlarged beam pipe piece 24 cm diameter. • The simulated BBU threshold is of the order of 20 A • First horizontal test in April 2009 5 Cell SRF Cavity inside the cryomodule Build: AES Processed: JLAB Will be used: BNL More details about the 5cell cavity status in the next talk … RHIC & AGS Annual Users’ Meeting, June 3, 2009

  26. Brookhaven Science Associates Energy Recovery Linac 5-Cell Super Conducting RF Cavity Collider-Accelerator Department LHe Ballast Tank Magnetic Shield Tuning Assembly Helium Vessel 5 Cell RF Cavity Insulating Vacuum Fundamental Power Coupler RHIC & AGS Annual Users’ Meeting, June 3, 2009

  27. Cavity VTA tests The cavity was processed at JLab. After BCP, Rinsing, and low temp. bake (120 C) cavity reached 19 MeV/m at Q0=1010. 19 MeV/m Ebeam,max  20 MeV RHIC & AGS Annual Users’ Meeting, June 3, 2009

  28. SRF Injector fRF= 703.75 MHz Energy=2.5-3 MeV Average Current: 0.5 A Two fundamental power couplers: 0.5 MW each SRF Gun: axial electric field profile for different cathode insertion depth (SUPERFISH result) RHIC & AGS Annual Users’ Meeting, June 3, 2009

  29. Conclusion: A bright future for ERLs • ERLs provide a powerful and elegant solution for high average power free electron lasers. • The pioneering ERL FELs have established the fundamental principles of ERLs. • Operating ERL-FELs reach higher performance • Several more are in serious planning stages and will likely be constructed • ERLs based on SRF technology will be used for the future: light sources, high energy electron coolers of ions, electron ion colliders RHIC & AGS Annual Users’ Meeting, June 3, 2009