preparation work for alba s closed-orbit bpms Preloader

preparation work for alba s closed-orbit bpms - PowerPoint PPT Presentation


  • 185 Views
  • Uploaded on

OUTLINE. ALBA OVERVIEWLIBERAS, SINCE 2nd USERS MEETINGALBA FAST ORBIT FEEDBACKBEAM POSITION MONITORS RF CABLES LIBERA ELECTRONICS FOFB NETWORK CORRECTION CALCULATION POWER CONVERTERS CORRECTOR MAGNETS. ALBA OVERVIEW. SLS type ? Booster and SR share the same tunnel.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'preparation work for alba s closed-orbit bpms' - omer


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript