Why Commissioning Authority Should Complete Commissioning Checklists

Instead of contactors, the completion of commissioning documents should be done by the commissioning authority (CxA) u2013 and for good reason! If contractors take the responsibility to complete commissioning documentation, this can make things complicated for the commission authority, and even contractors may find it difficult to find time to do so when they have their own designated responsibilities. Consequently, the building owner will not be able to reap any benefits from the true value of commissioning. Hence, it is important to ensure that contractors should not complete the commissioning d

Olivia7
Download Presentation

Why Commissioning Authority Should Complete Commissioning Checklists

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1.  The commissioning management services company is in direct contract with the owner of the building and it acts as an independent, 3rd-party representative who ensures that the entire commissioning phase is completely unbiased and follows best practices while working towards achieving the project requirements of the owner.  The commissioning authority bears the responsibility to assist the project team during construction, acceptance and design phases, which ensures that the project achieves success, but without being dependent on the construction and design teams, so as to maintain objectivity.  The commissioning process needs the commissioning authority to develop testing procedures, data forms and checklists, and record performance criteria.

  2.  This make things complicated for the commissioning authority who may then have to approach various members of the project team for different kinds of documents that need to be reviewed and confirmed by the commissioning authority.  It is important to ensure that contractors should not complete the commissioning documentation, such as pre-functional checklists (PFC) –obviously, because they’re not the independent commissioning authority.

  3.  Contactors should give the required equipment and initial documents to the commissioning management services agency.  They should also ensure their availability during PFC site visits and make the required repairs, if the installation of equipment is not in line with the design requirements, while meeting their general contract obligations.  When the commissioning authority works on PFC documentation, issues can be identified and fixed quickly, documentation offers more detail and the project team can go into the acceptance phase confidently with unbiased quality control offered by a good global commissioning authority.

  4.  Completing commissioning documentation needs an exhaustive database of mechanical equipment, including air handlers, boilers, expansion tanks, cooling towers, and every imaginable piece of MEP equipment within a commercial setting.  For every equipment piece, the commissioning authority requires to place the nameplate(s) to verify manufacturers’ data accurately.  Reputed global commissioning firms make use of design details from contract drawings and follow best installation practices for every piece of equipment.

  5.  Accuracy, efficiency, comprehensive verification and unbiased view are to name a few of the reasons why reputable commissioning management services stress on completing commissioning documentation.  Contractors are made fully aware of their tasks and responsibilities. Installers know that they have the time to concentrate on their work and building owners have the reassurance that their project is being commissioned by a dedicated team of experienced professionals.

  6. Address: Global Commissioning Management and Software Ltd, Unit 2, Chestfield Business Park Whitstable | Kent, CT5 3JB  https://www.facebook.com/GlobalCxMLtd  https://twitter.com/_globalltd  https://www.instagram.com/global_cxm/  https://www.linkedin.com/company/global-commissioning- management-software-ltd