CM Spec analysis. Markup from discussion 15/3. Summary of the scenario by way of the key business entities & their relationships. Pre-condition (Before. Is based upon or applies to*. CR. * Assuming basic triaging has been done prior to the start of the scenario. At some context version V’.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'CM Spec analysis' - olesia


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
cm spec analysis

CM Spec analysis

Markup from discussion 15/3

summary of the scenario by way of the key business entities their relationships
Summary of the scenario by way of the key business entities & their relationships

Pre-condition (Before

Is based upon or applies to*

CR

* Assuming basic triaging has been done prior to the start of the scenario

At some context version V’

System or

product context

Controlled config

Req

Implem

Post-condition (After

Is implemented by

At some new context version V’’

CR

System or

product context

System or

product context

Controlled config

Controlled config

Req

Implem

Req

Implem

Updated to achieve the CR

Updated to achieve the CR

plm reference model can be further built out to support model driven development
PLM Reference model can be further built out to support model driven development

Applied in the PLM Reference Model

Base diagram from OMG

crs typically don t exist stand alone
CRs typically don’t exist stand alone
  • CR can be an enhancement or a correction or some combination
    • Prioritised for criticality, value
    • Grouped by impact area
    • Grouped and sequenced for effectivity
  • CRs need to be associated and managed (inc merge, split, superced
cr resource behaviour
Have today

Need

Identify in product and/or system context

Heterogeneous problem list (of affected items)

Heterogeneous solution list

Enterprise approval

Group, sequence, deprecate

CR resource behaviour
http open services net bin view main cmspecificationv2
http://open-services.net/bin/view/Main/CmSpecificationV2
  • Set of 6 states
    • “State predicate properties
  • Set of relationships
    • “Relationship properties:
cm 1 of 2

CR

System or

product context

Req

Implem

Controlled config

CM 1 of 2
cr 2 of 2

CR

System or

product context

Req

Implem

Controlled config

CR 2 of 2
ap233 module 1042
AP233 Module 1042
  • In the Project Mngmnt schema
  • Work request
      • id mand
      • Version mand
      • Purpose
      • Description (opt
    • Affected items
      • Number
      • Type
    • Status
  • Work Order
    • Authorisation for Work request
plm cr rel
PLM CR rel
  • Activity method assignment
  • Affected items assignment
version comments
Version comments
  • dcterms has today
    • Resource A “has versions” Resource B
    • Resource B “is version of” Resource A
    • http://web.resource.org/rss/1.0/modules/dcterms/
cr context 1 of 2

CR

System or

product context

Req

Implem

Controlled config

CR Context 1 of 2
cr context 2 of 2

CR

System or

product context

Req

Implem

Controlled config

CR Context 2 of 2