common issues on plans n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Common Issues on Plans PowerPoint Presentation
Download Presentation
Common Issues on Plans

Loading in 2 Seconds...

play fullscreen
1 / 21

Common Issues on Plans - PowerPoint PPT Presentation


  • 93 Views
  • Uploaded on

Common Issues on Plans. Recertification Training For Level II Introduction to Design Certified Plan Reviewers and Certified Design Professionals. Issued May 2009. Phasing. Phasing cannot be done on one sheet, it is to be broken down into three separate sheets.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Common Issues on Plans' - nuwa


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
common issues on plans

Common Issues on Plans

Recertification Training

For Level II Introduction to Design

Certified Plan Reviewers and Certified Design Professionals

Issued May 2009

phasing
Phasing
  • Phasing cannot be done on one sheet, it is to be broken down into three separate sheets.
  • Where there is no mass grading and BMPs are the same for all three phases, the plan may combine all of the BMPs into a single phase plan.
excavated sd2s
Excavated Sd2s
  • Not to exceed one acre
sediment storage
Sediment storage
  • Sediment storage ponds can not be labeled both Sd3 and Rt at the same time.
  • Sediment storage is to be calculated per acre drained, not per the disturbed area
sediment storage1
Sediment Storage
  • When designing an Sd3 be sure it is in the appropriate location.
  • When a sediment basin is not to be used, provide a written rationale explaining the decision to not use a basin.
double check the plans before submittal
Double check the plans before submittal
  • Make sure to label all BMPs
  • Make sure to label proposed contours
limits of disturbance
Limits of disturbance
  • Label your limits of disturbance on each phase
  • Do not show work outside the limits of disturbance
  • Most common items seen outside limits of disturbance
  • Silt fence
  • Sediment storage
  • Stock pile areas
  • Check dams
state waters
State Waters
  • Label all State Waters.
  • Be sure statements match plans.
  • Make sure to label the State’s required 25’ buffer along with the LIAs buffer (if applicable).
slide14

Make sure to have all appropriate statements signed

" I certify that the permittee's Erosion, Sedimentation and Pollution Control Plan provides for an appropriate and comprehensive system of best management practices required by the Georgia Water Quality Control Act and the document "Manual for Erosion and Sediment Control in Georgia" (Manual) published by the State Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, provides for the sampling of the receiving water(s) or the sampling of the storm water outfalls and that the designed system of best management practices and sampling methods is expected to meet the requirements contained in the General NPDES Permit No. GAR 10000_."

"I certify under penalty of law that this Plan was prepared after a site visit to the locations described herein by myself or my authorized agent, under my supervision."

design professional inspection
Design Professional Inspection

The Design Professional must inspect the installation of initial sediment storage requirements and

perimeter control BMPs within 7 days after installation.

select the appropriate checklist
Select the Appropriate Checklist
  • The appropriate checklist must be
  • completed and submitted with all
  • ES&PC plans.
  • Checklists are available at www.gaepd.org
  • and
  • www.gaswcc.georgia.gov
retention of records
Retention of Records

Permittees are required to retain the following records:

slide18
In accordance with V.G.2.d, the Permittee must

sign the following statement:

" I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that certified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

appropriate worksheets
AppropriateWorksheets

Design Professionals must

provide all the appropriate

worksheets from the manual

for structural BMPs.

slide20
Make sure to have the Level II certification on each ES&PC sheet (including details).
  • Check the details to ensure that there are details for every BMP used.
  • Make sure all statements apply to your plans.
  • Double check your plans for things you might have missed.