1 / 26

COSMO meeting, Zurich, 20-23 September 2005

COSMO-LEPS: operational aspects and verification Andrea Montani, Chiara Marsigli ARPA-SIM Hydrometeorological service, Bologna, Italy. COSMO meeting, Zurich, 20-23 September 2005. Outline. Introduction Present status: archiving of COSMO-LEPS products;

norah
Download Presentation

COSMO meeting, Zurich, 20-23 September 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COSMO-LEPS: operational aspects and verificationAndrea Montani, Chiara MarsigliARPA-SIM Hydrometeorological service, Bologna, Italy COSMO meeting, Zurich, 20-23 September 2005 A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  2. Outline Introduction Present status: archiving of COSMO-LEPS products; test of different clustering-selection techniques. Related projects: SPITLAEF (case studies + tests); SPCOLEPS (Alpine suite); SPCOWIND (related to wind forecast); DEISA (related to hydrological forecasting). Verification results. Future plans: COSMO-LEPS as an ECMWF “time-critical application”; “respond” to ECMWF EPS upgrade? A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  3. Introduction What is it?It is a Limited-area Ensemble Prediction System (LEPS), based on Lokal Modell and developed within COSMO (COnsortium for Small-scale MOdelling, which includes Germany, Greece, Italy, Poland and Switzerland). Why?The horizontal resolution of global-model ensemble forecast systems is limited by computer time constraints and does not allow a detailed description of mesoscale and orographic-related processes. COSMO-LEPS project: combine the advantages of global-model ensembles with the high-resolution details gained by the LAMs, so as to identify the possible occurrence of intense and localised weather events (heavy rainfall, strong winds, temperature anomalies, …); COSMO-LEPS forecasts to improve the short to medium-range forecast (48h < t < 120h) of the so-called “severe weather events”. A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  4. The COSMO-LEPS suite @ ECMWFsince June 2004 10 Representative Members driving the 10 Lokal Modell integrations (weighted according to the cluster populations) employing either Tiedtke or Kain-Fristch convection scheme (randomly choosen) 3 levels 500 700 850 hPa 4 variables Z U V Q d+3 d+4 d d+5 d+1 d+2 d-1 Cluster Analysis and RM identification Cluster Analysis and RM identification middle EPS 00 2 time steps youngest EPS 12 European area clustering period Complete Linkage • suite running every day at ECMWF managed by ARPA-SIM; • Δx ~ 10 km; 32 ML; • LM_3.15 since 18/4/2005; • fc length: 132h; • Computer time provided by the COSMO partners which are ECMWF member states. COSMO-LEPS Integration Domain COSMO-LEPS clustering area A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  5. Operational set-up Additional products: • 1 deterministic run (ICs and 3-hourly BCs from the high-resolution deterministic ECMWF forecast) to assess the relative merits between deterministic and probabilistic approach (start at 12UTC; t = 132h); • 1 proxy run (ICs and 3-hourly BCs from ECMWF analyses) to “downscale” ECMWF information (start at 00UTC; t = 36h). Core products: 10 perturbed LM runs (ICs and 6-hourly BCs from 10 EPS members) to generate probabilistic output (start at 12UTC; t = 132h); A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  6. Dissemination to the COSMO community (+ Hungary) A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  7. Archiving of C0SMO-LEPS products • Deterministic run (fc+0h to fc+132h every 3h). • Ensemble Prediction System: • 10 perturbed forecasts (fc+0h to fc+132h every 3h): PLEV (500, 700, 850 hPa): Z, RH, T. SURF: albedo, LCC, MCC, TCC, SW radiation flux, CAPE, hzerocl, snowlmt, mslp, T_2m, Td_2m, TMAX_2m, TMIN_2m, U_10m, V_10m, UVMAX_10m, large-scale rain, convective rain, large-scale snow, TP. • Forecast probability (various intervals and thresholds): SURF: CAPE, hzerocl, TMAX_2m, TMIN_2m, UVMAX_10m, TP, snowfall, showalter index. • Clustering information (population, clustering variable used, …). From 1 July 2005, COSMO-LEPS forecasts are archived on MARS at ECMWF (class=co). back archiving of past runs (from 5/11/2002 onwards) will start soon. A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  8. Related projects SPITLAEF (Italian ECMWF special project) to perform studies on limited-area ensemble size, clustering methodologies, model perturbations, EPS reruns, … • SPCOLEPS (joint Italy and Switzerland ECMWF special project) to study possible modifications of the operational suite. • SPCOWIND (joint Italy and Great Britain): new ECMWF special project so as to have the computer resources to run a limited-area ensemble system over North-Western Europe (within the EC project PREVIEW, WP: Windstorms). DEISA (Distributed European Infrastructure for Supercomputer Applications): consortium of super-computing centres which can (hopefully!) provide computer time resources to rerun 1 full month (August 2002) of COSMO-LEPS forecasts for ensemble hydrological purposes (within the EC project PREVIEW, WP: Medium-range Plain-floods). A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  9. ALPINE suite (running on SPCOLEPS billing units) • Experimental suite running daily from 15 July 2005. • Same configuration as the operational COSMO-LEPS (red), but both clustering and integration domain are centred over the Alps (blue). • Products not yet disseminated, but saved at ECMWF. ope alp • On single events, differences between the 2 suites can be noticeble: Prob maps of 3-day rainfall exceeding 50 and 100 mm (fc24-96h); forecast starting at 20050905 12UTC  In this case, more helpful maps from the Alpine suite A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  10. COSMO–LEPS verification (SON 2004) Verification grid A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  11. Grid point forecast Verification of the distributions The verification has been made in terms of: • Average value • Maximum value • 50th percentile (Median) • 90th percentile in a box Station observation A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  12. tp > 10mm/24h tp > 10mm/24h tp > 20mm/24h tp > 20mm/24h tp > 30mm/24h COSMO-LEPS 10-MEMBER EPS Average values boxes 1.5x1.5 deg A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  13. COSMO-LEPS 10-MEMBER EPS Average values boxes 1.5x1.5 deg A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  14. tp > 10mm/24h tp > 10mm/24h tp > 20mm/24h tp > 20mm/24h COSMO-LEPS 10-MEMBER EPS Maximum values boxes 1.5x1.5 deg tp > 30mm/24h A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  15. COSMO-LEPS 10-MEMBER EPS Maximum values boxes 1.5x1.5 deg A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  16. Future plans • COSMO-LEPS suite will soon become a “time-critical” application monitored by ECMWF: • involvement of ECMWF operators in the management of the suite; • file system dedicated and priority in job scheduling. • Implement dissemination to the Czech Met. Service (if possible). • Back archiving on MARS of past runs (from 5/11/2002 onwards). • Modify (?) the operational configuration to “contrast” EPS upgrade: • EPS will increase the hor. res. from 80 to 50 km (TL255L40  TL399L62) with 56-57 model levels between 40 hPa (approximate top-level height of LM) and the surface; • EPS will have HIGHER vertical resolution than LM; is this a problem??? • increase the COSMO-LEPS vertical resolution from 32 to 40 layers so as to reduce the gap? • ask for 3-hour post processing of EPS until fc+144h. • Study CAREFULLY the outcome of the Alpine suite. A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  17. Thank you ! A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  18. tp > 10mm/24h tp > 10mm/24h tp > 20mm/24h tp > 20mm/24h tp > 30mm/24h COSMO-LEPS 10-MEMBER EPS 50th percentile values boxes 1.5x1.5 deg A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  19. COSMO-LEPS 10-MEMBER EPS 50th percentile values boxes 1.5x1.5 deg A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  20. tp > 10mm/24h tp > 20mm/24h tp > 30mm/24h COSMO-LEPS 10-MEMBER EPS 90th percentile values boxes 1.5x1.5 deg tp > 10mm/24h tp > 20mm/24h A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  21. COSMO-LEPS 10-MEMBER EPS 90th percentile values boxes 1.5x1.5 deg A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  22. Clustering-selection technique EVALUATION OF THE METHODOLOGY with respect to clustering settings: • clustering intervals (SON 2003) • ensemble size (JJASON 2004) • clustering area (JJASON 2004) Verification against “proxy-rain” (ECMWF deterministic forecast starting at 00 UTC and cumulated from fc+6h to fc+30h). A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  23. CLUSTERING INTERVALS • Consider a fixed configuration in terms of ensemble size (10 RMs selected out of 2 EPS sets, 2eps-10rm) and the properties of the “reduced” (10-member) global ensemble in 4 different cases: OPE: the 10 members are selected like in the operational set-up (clustering variables: z,u,v,q; clustering levels: 500, 700, 850 hPa; clustering times: fc+96h, fc+120h); D2: like OPE, but clustering times: fc+24h, fc+48h; D3: like OPE, but clustering times: fc+48h, fc+72h; D4: like OPE, but clustering times: fc+72h, fc+96h. outliers BSS Brier Skill Score: OPE has slightly better scores at all verification ranges (less evident for ROC area .. not shown); Outliers percentage: results heavily depend on the verification range. A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  24. ENSEMBLE SIZE and CLUSTERING AREA (1) • Evaluation of the properties of the reduced global ensemble for 3 different ensemble sizes (either 10, or 15, or 20 RMs selected out of 2 EPS sets, 2eps-10rm, 2eps-15rm, 2eps-20rm) and 2 different clustering areas. 2eps-10rm (ope): the 10 members are selected like in the operational set-up (clustering variables: z,u,v,q; clustering levels: 500, 700, 850 hPa; clustering times: fc+96h, fc+120h); 10 alp: like OPE, but the clustering area is centred over the Alps (43-49N, 4-16E); 2eps-15rm: like OPE, but 15 members are selected; 2eps-20rm: like OPE, but 20 members are selected. Outliers (fulldom) BSS (fulldom) Brier Skill Score: 2eps-20rm has better scores at all verification ranges; larger impact from 10 to 15 members rather than from 15 to 20 members (the same for ROC area .. not shown); Outliers percentage: the same story. A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  25. ENSEMBLE SIZE and CLUSTERING AREA (2) • Evaluation of the sensitivity to the clustering area used to select the RMs: 2eps-10rm (ope): 10 members selected with the operational clustering area (30-60N, 10W-30E); 10 alp: like OPE, but the clustering area is centred over the Alps (43-49N, 4-16E); 2eps-15rm: like OPE, but 15 members are selected; 2eps-20rm: like OPE, but 20 members are selected. Outliers (alpdom) ROC (alpdom) BSS (alpdom) ROC area: due to the smaller verification area, there are very few occurrences at high thresholds; this gives lesser statistical significance to the scores, despite the long verification period. No positive impact of reducing the clustering area (actually “ope” is slightly better than “10 alp”!); small impact in terms of BSS (at fc+66h). Outliers percentage: the same story as for the ROC area. A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

  26. NW Europe suite (running on SPCOWIND billing units) • Generation of a new limited-area ensemble forecast system for the prediction of wind and wind gusts over North-Western Europe. • Aim: provision of site-specific wind forecasts to be post-processed and combined with other products by UK Met. Office. • Same configuration as the operational COSMO-LEPS (red), but both clustering and integration domain are shifted northwards (blue). Experimental suite will start on June 2006. A.Montani; COSMO-LEPS: operational aspects and verification COSMO meeting, Zurich, 20-23 September 2005

More Related