Communication and Design Practices Group - PowerPoint PPT Presentation


  • 170 Views
  • Uploaded on

Communication and Design Practices Group. Team Members Dan Vargas -Group Leader Teac Peter Hurley Rockwell Collins Joe Golley Thomson - CFS John Ojala BCAG Allen Stewart MAS Mike Quary Weber Aircraft Curtis Byrd BAS Kevin Luschei BCAG Sam Movsesian BAS

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Communication and Design Practices Group' - noe


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
communication and design practices group
Communication and Design Practices Group
  • Team Members
  • Dan Vargas -Group Leader Teac
  • Peter Hurley Rockwell Collins
  • Joe Golley Thomson - CFS
  • John Ojala BCAG
  • Allen Stewart MAS
  • Mike Quary Weber Aircraft
  • Curtis Byrd BAS
  • Kevin Luschei BCAG
  • Sam Movsesian BAS
  • Tom Aliffi Delta Air Lines
communication and design process group
Communication and Design Process Group
  • Mission Statement
  • To define a Process and Vehicle that will identify roles, responsibilities,activities and information required from all participants to support the total program from pre-kickoff to aircraft delivery
communication and design process group3
Communication and Design Process Group
  • Responsibility Matrix
  • A brainstorming session produced the basic requirements of each party to prepare for and participate in an ITCM for seat integration
  • The draft material produced will be formatted and updated individually via e-mail
communication and design process group4
Communication and Design Process Group

Airline

  • Supplier Selections (adhere to selection dates)
  • Supplier notification
  • Inter-Supplier communication
  • Equipment definition finalized
  • Contractual agreement between customers and suppliers
  • LOPA
  • System requirements
communication and design process group5
Communication and Design Process Group
  • Airframer and/or System Integrator
  • Adhere to supplier select dates
  • Seat and equipment Installation specifications
  • Integration and Installation schedule
  • ITCM Checklist
  • (Boeing Cabin systems Seat/IFE integration procedure IV)
      • Coordination meeting expectations
  • Notification of schedule and long lead requirements
communication and design process group6
Communication and Design Process Group

IFE Supplier

  • NDAs
  • List of IFE equipment and part numbers
  • Seat equipment installation specification and requirements
  • Seat Equipment Interface control documents
  • ITCM Checklist
  • Functional Test Procedure
  • Seat equipment wiring block diagram and installation template
  • Seat supplier requirements list request:
  • Data requirements and schedule
  • Coordination meeting expectations
  • Notification of schedule and long lead requirements
communication and design process group7
Communication and Design Process Group

Seat Supplier

  • List of fit and test equipment requirements
  • Preliminary Seat envelope drawings with electrical component layout:
    • IFE components, Seat power, PC power, monitor arms, console stowage, telephones, reading lights, seat and accessory control buttons and switches.
    • List of electrical components including supplier names
    • Notification of schedule and long lead requirements
communication and design process group8
Communication and Design Process Group
  • Resource Material
  • Boeing Cabin Systems Payloads Integration Team Interim Agreement
  • This document will be edited to be a general reference guideline for cabin systems/IFE/seat integration and provided to waea.org/workinggroups web site in January.
communication and design process group9
Communication and Design Process Group
  • Future Plans
  • The completed matrix will be published on the waea.org/workinggroups web site.
  • The draft material produced will be formatted and updated individually via e-mail