70 likes | 190 Views
Pilot considerations and pilot solutions. Session 5 Presentation 2. Construction plan. Availability of runways After hours availability of construction runway determine availability Ensure proper marking of construction sites Runway recall determine the time
E N D
Pilot considerations and pilot solutions Session 5 Presentation 2
Construction plan • Availability of runways • After hours availability of construction runway • determine availability • Ensure proper marking of construction sites • Runway recall determine the time • FOD ensure management plan implemented
Runway use • Multiple runways • shortened runway considerations: • Obtain revised performance charts • Use most suitable aircraft type • Only use runways with approach slope guidance • Single runway • Entry /exit procedure training
Traffic Management • Flow capacity • Adapt the aircraft type for capacity • Use any extended airport operating hours • Arrivals and departures control ground hold better airborne holding • Arrival and departures ATC requirements additional holding fuel
Weather • X wind • aircraft type suitable for expected conditions • carriage of alternate fuel
Not common considerations • Use of new aircraft type crew familiarization