10 likes | 141 Views
This document outlines the significant milestones in the electronics development for the ALICE installation from late 2004 to the end of 2006. Key events include the finalization of the electronics concept in 2004, the start of prototype design in January 2005, and subsequent realization of the prototypes by mid-2005. The final design process began in January 2006, culminating in testing and calibration of the electronics before installation. Notable engineers involved include Y. Zoccarato, W. Tromeur, and C. Combaret, with a design review concluding in December 2004.
E N D
V0 electronics milestones • End 2004: electronics concept finalization(PMT, ‘shoebox’, FEE) CIU design prototype in test(charge, time, pre-process of triggers) • January 2005: CCIU and TTCIU prototype design started (final trigger signal, collection of the data, …interface TTC/FEE) • July 2005: CCIU and TTCIU prototype realization • End 2005: CIU, CCIU, TTCIU protypes tested Design review • January 2006: CIU, CCIU, TTCIU final design starting • June 2006: electronics construction • End 2006: electronics test, calibration, connection to CTP electronics ready for installation in ALICE • Engineers: Y. Zoccarato, W. Tromeur, C. Combaret FEE meeting, 10 December 2004