nico
Uploaded by
10 SLIDES
336 VIEWS
100LIKES

Present Layout 现网站

DESCRIPTION

Present Layout 现网站. Shanghai 上海. Tianjin 天津. 2014.04.05. 快速链接 | PFS-USA| English | 简体中文. 主页 关于我们 我们的优势 服务项目 新闻动态 员工之家 联系方式. ▼ 要闻发布 - 2014. 2014/04/05 — 中外运普菲斯参展 5 月中食展 (SIAL) 。

1 / 10

Download Presentation

Present Layout 现网站

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Present Layout 现网站

  2. Shanghai 上海 Tianjin 天津 2014.04.05 快速链接|PFS-USA|English|简体中文 主页 关于我们 我们的优势 服务项目 新闻动态 员工之家 联系方式 ▼要闻发布-2014 2014/04/05— 中外运普菲斯参展5月中食展(SIAL)。 2014/03/31—普菲斯倾力赞助印地500大赛。 2014/03/26—智利参赞参观我外高桥冷库。 ■详细信息 关于我们 最新消息 媒体报道 公司概述 希腊羊痘及山羊痘疫情依然持续 行业资讯 近期活动 实时的库存管理 宣传片 中外运普菲斯冷链物流是由全球第四大冷库运营商美国普菲斯与中外运集团于2009年合资成立的一家集冷链仓储与物流为一体的综合型企业。阳明集团抓住中国冷链飞速发展的契机,2013年注资成为中外运普菲斯又一大合作伙伴。伴随着业务规模的不断扩大,服务项目亦日趋完善与精细。 ■详细信息 相关下载 ►中外运普菲斯宣传页(2014) ►公司地图(上海临港) ►公司地图(上海外高桥) ►公司地图(天津滨海) 现代物流 物流技术与应用 CCTV-2 网站地图

  3. 主页 关于我们 我们的优势 服务项目 新闻动态 员工之家 联系方式 公司概述 组织结构 发展历程 荣誉资质 普菲斯人 招贤纳士 中国 美国 越南 地理位置 停车坪 装卸区 物料搬运设备 货架系统 制冷系统 管理信息系统 灾难恢复 仓储 物流 海运 其他 最新消息 行业资讯 近期活动 媒体报道 1)与主页上的滚动页面对应 2)可以选取其中新闻设置到“要闻发布” *滚动Flash的第一页,始终是中外运普菲斯的简介,其余三页为新闻板块

  4. 二级页面 主页 关于我们 我们的优势 服务项目 新闻动态 员工之家 联系方式 最新消息 XXXXXXXXXXXXXXX 2014/04/23 XXXXXXXXXXXXX 2014/03/15 XXXXXXXXXXXXXXXXXXXXXXXXXXX 2014/02/02 XXXXX 2013/11/27 XXXXXXXXX 2013/11/14 更多 要闻发布 中外运普菲斯参展5月中食展(SIAL)。 普菲斯倾力赞助印地500大赛。 智利参赞参观我外高桥冷库。 ■详细信息 行业资讯 XXXXXXXXXXXXXXX 2014/04/23 XXXXXXXXXXXXX 2014/03/15 XXXXXXXXXXXXXXXXXXXXXXXXXXX 2014/02/02 XXXXX 2013/11/27 XXXXXXXXX 2013/11/14 更多 近期活动 XXXXXXXXXXXXXXX 2014/04/23 XXXXXXXXXXXXX 2014/03/15 XXXXXXXXXXXXXXXXXXXXXXXXXXX 2014/02/02 XXXXX 2013/11/27 XXXXXXXXX 2013/11/14 更多 媒体报道 XXXXXXXXXXXXXXX 2014/04/23 XXXXXXXXXXXXX 2014/03/15 XXXXXXXXXXXXXXXXXXXXXXXXXXX 2014/02/02 XXXXX 2013/11/27 XXXXXXXXX 2013/11/14 更多

  5. 三级页面 主页 关于我们 我们的优势 服务项目 新闻动态 员工之家 联系方式 最新消息 XXXXXXXXXXXXXXX 2014/04/23 XXXXXXXXXXXXX 2014/03/15 XXXXXXXXXXXXXXXXXXXXXXXXXXX 2014/02/02 XXXXX 2013/11/27 XXXXXXXXX 2013/11/14 XXXXXXXXXXXXXXX 2013/11/11 XXXXXXXXXXXXX 2013/10/15 XXXXXXXXXXXXXXXXXXXXXXXX2013/09/02 XXXXX 2013/08/27 XXXXXXXXX 2013/07/14 XXXXXXXXXX2013/06/27 XXXXXXXXXXXXX 2013/05/17 XXXXXXXXXXX2013/05/03 XXXXX 2013/03/21 XXXXXXXXX 2013/01/14 XXXXXXXXXXXXXXX 2012/12/30 XXXXXXXXXX2012/12/24 XXXXX2011/11/17 XXXXX 2013/10/27 XXXXXXXXX 2013/10/09 要闻发布 中外运普菲斯参展5月中食展(SIAL)。 普菲斯倾力赞助印地500大赛。 智利参赞参观我外高桥冷库。 ■详细信息 第1页/共X页 跳转至第■页 上一页 下一页 当前显示1-20条,共XXX条 第一页

  6. 四级页面 主页 关于我们 我们的优势 服务项目 新闻动态 员工之家 联系方式 要闻发布 中外运普菲斯参展5月中食展(SIAL)。 普菲斯倾力赞助印地500大赛。 智利参赞参观我外高桥冷库。 ■详细信息

  7. Backstage& others后台及其他 • 后续维护更新 • 图片效果 • 二级页面及内容 • 其他 • 自主维护更新 • 三级页面及内容 • 主页滚动Flash • 新闻相关内容 • 联系方式 • 员工之家 • 快速链接

  8. 后台说明(新闻板块) 设置发布日期 文章标题 设置关键词 选择下属板块,如“最新消息”、“行业资讯”、“近期活动”、“媒体报道” 发布到首页Flash 文章主体内容,可支持pdf, word, excel上传;图片上传、引用等 发布到要闻

  9. Project Timeline 项目时间表 小样要求: 展现首页、二级页面(新闻动态)的静态效果,以及部分三级页面(公司概述、最新消息列表页面)静态效果,四级页面(具体的一篇“最新消息”) 05/26-06/30 Development 网站开发 05/23 Demo selection 选样 05/16-05/21 Review 分批讨论 05/15 DemoSubmission(w/quotation&solution)提交小样、计划并报价 **notethe milestones of development计划中须标注开发节点 04/29 Presentation 说明会

  10. Contact 联系人 • 张祎婷(市场专员) • sylvianezhang@preferredfreezer.cn • 1522 1661 939

More Related