An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Milan Srskic, CCM, FHFI Acting Chief, Project Management Service Office of Construction and Facilities Management

  2. Mission • Planning, design, construction and lease management for major projects (over $10M) • Develop design & construction standards for VA • Historic preservation, NEPA compliance, etc. • High quality, cost effective facilities

  3. Vision/Goals • Business leadership, expertise, advice for facilities projects; CFM is VA’s in-house CM “firm” • Focus resources to support VA asset management • Promote continuous improvement

  4. Human Capital Strategies • A major transformation and improvement, moving to an enterprise-wide, rather than fragmented model for facility management • Moving more functions to field offices, including contracting, planning, tech support • All project management to be done in field offices; Program Management (PM) in Central Office.

  5. Opportunities & Challenges • VA using Agency CM firms since FY2006 • Constructability reviews, market surveys, estimates, value engineering, phasing, construction administration; local market knowledge essential • Individual CM firms for very large projects. Six IDIQ CM contracts. • Exploring other options for CM/PM use

  6. Project Delivery Methods • Evaluated during planning process and acquisition strategy development • Design-Bid-Build most utilized method, and likely to remain so. • Best Value (FAR 15) selection – no sealed bid utilized

  7. Design-Build • Usually for less complex projects, but have done an operating room renovation by DB. • One- and two-step processes used • Currently re-evaluating to improve DB • Constraints on use of DB – lack of full funding, NEPA and historic compliance requirements , site acquisition issues, etc.

  8. Integrated Design/Construct • FAR 16.403.2, fixed price incentive (successive targets) contracts • Constraints • Complying with competition requirements • Meeting socio-economic goals • Availability of trained VA staff • Contractor selection at end of schematic

  9. FY 2011 Budget • $1B for major construction, including: • New Orleans medical facility, $310M • Denver facility, $450.7M • Palo Alto polytrauma/ambulatory, $30M • Alameda Point, outpatient clinic and columbarium, $17.3M

  10. FY 2011 Budget • Major construction (cont’d) • Omaha replacement facility, $56M design • L.A. National Cemetery, $27.6M • Indiantown Gap, PA cemetery, $23.5M • Tacoma, WA, cemetery $25.8M

  11. Future Funding & ARRA • No major construction projects in ARRA • CFM not affected by reporting requirements. • Anticipate future funding at around $1B per year.

  12. BIM • VA wants to use and reap benefits – required on all major projects since FY2009 • VA required Industry Foundation Classes (IFC) compliant parametric BIM • “Major” construction = >$10M • New VA BIM Guide online soon at:http://www.cfm.va.gov/TIL

  13. Commissioning • Federal mandates apply for sustainability and energy reduction • VA requires compliance with VA Directive 0055 (April 2010) available at:http://www.cfm.va.gov/til/sustain.asp • LEED Silver or two Green Globes • VA uses independent commissioning agent

  14. Electronic PM & Tech • No current unified electronic project management system • Various systems now in use • VA exploring enterprise-wide solutions as part of the transformation initiative

  15. Doing Business with VA • A/E Opportunities are listed at http://www.cfm.va.gov/contract/forecastAE.asp • Construction opportunities are listed at http://www.cfm.va.gov/contract/forecastCC.asp • Current contracts on FedBizOps.