Central Texas Turnpike Project Tour 2005

Central Texas Turnpike Project Tour 2005. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation. Central Texas Turnpike Project Austin District Phone: (512) 225-1361 FAX : (512) 225-1400 email: dtoner@dot.state.tx.us. Teri J. Morgan SR/WA, R/W-RAC

neva
Download Presentation

Central Texas Turnpike Project Tour 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Central Texas TurnpikeProject Tour 2005

  2. Donald C. Toner Jr., SR/WA Right of Way Administrator Texas Department of Transportation Central Texas Turnpike Project Austin District Phone: (512) 225-1361 FAX : (512) 225-1400 email: dtoner@dot.state.tx.us

  3. Teri J. MorganSR/WA, R/W-RAC EDA ROW / Utility Manager HDR Engineering Phone: (512) 225-1366 FAX : (512) 225-1400 email: t.morgan@HDRInc.com

  4. Central Texas Turnpike Project Construction ROW • SH 130 $1.4 bill $389 mill • Loop 1/SH 45N $1.2 bill $145 mill • SH 45 SE $154 mill $40 mill

  5. CTTP Office Impact • Over 2,000 FTEs at peak • Over $2 Billion Bond Package • $916 Million TIFIA Loan from US DOT • Over $220 Million from Local Public Agencies • $500 Million Budget for ROW and Utilities

  6. SH 130 Impact • Move 30 million CY of dirt • Build 433 lane miles • Place 2.7 million SY of Concrete • Lay 1.7 million tons of Asphalt • Erect 590,000 sf of retaining wall • Install 150 new signals

  7. SH 130 Impact continued • Build 119 bridges • Construct 14,000 sf of new Buildings • Construct 4 Mainlane Toll Plazas • Construct 30 Ramp Plazas

  8. 1 2 3 4 5 6 SH 130 Segments • 6 Segments • 91 Miles • 4-Lane divided, Controlled- • Access Turnpike • 103’ Median • Discontinuous 2-Lane • Frontage Roads • 8 Major Interchanges

  9. SH 130 • NTP1 Issued July 8, 2002 • NTP2 Issued January 4, 2003 • NTP3 Issues December 30, 2004 • Construction began on October 3, 2003 • NTPs Issued for $999 Million • Change orders for 52.5 Million (5%) • LSI has earned 34% of contract amount and used 46% of contract time • Contractor: Lone Star Infrastructure, JV

  10. SH 130 – ROW Summary Nov. 2004 Mar. 2004 Feb. 2005 Apr. 2005 • Parcels 410 408 407 408 • Surveys Completed 276 359 364 364 • Appraisals Approved 197 321 334 346 • Offers Made 153 310 329 343 • Offers Accepted 68 126 150 162 • Condemnation Packages Approved 50 215 235 251 • Parcels Acquired 39 163 199 230 • Possession & Use Agreements 12 23 46 44 • Parcels available for Construction 51 186 245 274

  11. Instructions 1.) Load Buses – Front Door Marriott2.) Proceed to Loop 1 Toll Facility3.) Meet TxDOT escort vehicles 4.) Drive Construction Area for Loop 1, SH 45, SH 1305.) Snacks provided during tour 6.) Buses will return to the Marriott – 5pm