THEMIS INSTRUMENT SUITE Suite PRE-SHIP REVIEW INTRODUCTION Davin Larson SST Lead

THEMIS INSTRUMENT SUITE Suite PRE-SHIP REVIEW INTRODUCTION Davin Larson SST Lead University of California - Berkeley. SST Overview. Overview Instrument Status Flight Configuration Problem Failure Reports Calibration Data. SST Instrument Status.

nellie
Download Presentation

THEMIS INSTRUMENT SUITE Suite PRE-SHIP REVIEW INTRODUCTION Davin Larson SST Lead

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THEMIS INSTRUMENT SUITE • Suite PRE-SHIP REVIEW • INTRODUCTION • Davin Larson • SST Lead • University of California - Berkeley

  2. SST Overview • Overview • Instrument Status • Flight Configuration • Problem Failure Reports • Calibration Data

  3. SST Instrument Status • All SST Instruments are fully functional. • SSTs have are no outstanding issues or problems. • SSTs survived all environmental tests and are ready for launch.

  4. Flight Configuration • Final flight configuration of sensors and DAPs for all flight units. Swapped FM1- SST1 sensor swapped with spare (PFR- 192)

  5. Recent PFRs • 2 New PFRs – • PFR -192 - FM1 SST elevated noise levels on electron sensors when integrated on probe A. - Closed • PFR – 219 – SST counters get clear every 24 seconds. - Closed

  6. Recent PFRs • PFR 192- • Found FM1 SST-01 Sensor showed elevated noise levels (acceptable, but out of family) when integrated onto the flight payload. • Testing showed noise source is power supply noise from the BAU that is conducted through the IDPU power supply and DAP and into the sensors. • Testing showed that a spare sensor (SST-03) had lower conducted noise susceptibility. Since this unit had already passed complete suite level environmental testing, we decided to swap sensors. • PFR is closed.

  7. Recent PFRs • PFR 219- • Found that one (of 32) angle sectors had reduced counts (~40% low) once every 24 seconds (8 spin periods). • Problem tracked to simple software addressing error in SST digital housekeeping packet (apid 452) generation code. • Software fixed and tested. • PFR is closed.

  8. Results of Environmental Testing • All 5 units survived environmental tests. • Energy Threshold vs temperature measured and acceptable • Energy resolution acceptable (<13 keV at 5C). • Detector gain measured and is stable over temperature. • Channel crosstalk measured and acceptable (<20 keV) • Attenuator functions over full operational Temp range. • Heater/Thermostat Functional at < -50 C • Magnetic moments measured and deemed acceptable. • End to End performance verified through environments.

  9. Calibration results Typical Proton response SST Sensor 05 - Channel 4 40 35 45 keV 30

  10. Thermal VAC tests • Typical thermal cycle • (cold to hot)

  11. Thermal VAC tests • Am241 xray peak • (not resolved at this energy binning)

  12. Thermal VAC tests • Typical LPT • All channels stimulated individually • Doors • Opened • closed • Lower Threshold

  13. Launch requirements: • Remove red tag items (covers) prior to encapsulation.

  14. END!

  15. Old PFRs • PFR 169- • Found poor ion energy response in 2 sensors. (S03 and S08). Found only in sensors that had undergone electron testing. • Discovered that plasma discharges from the electron gun had inadvertently damaged adjacent ion detectors. (electron detectors where protected by foil that stopped all ions and never showed any damage.) • Subsequent testing with the electron gun is done with the open (ion) detectors covered. Electron gun has also been refurbished. • Swapped affected sensors with spares (S05 and S10). • Replaced damaged open (ion) detectors in affected units. These are now the new spares. • PFR is closed.