senior design ii project presentation p10008 arcworks cap tube assembly n.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Senior Design II Project Presentation P10008 ArcWorks Cap Tube Assembly PowerPoint Presentation
Download Presentation
Senior Design II Project Presentation P10008 ArcWorks Cap Tube Assembly

Loading in 2 Seconds...

play fullscreen
1 / 14

Senior Design II Project Presentation P10008 ArcWorks Cap Tube Assembly - PowerPoint PPT Presentation


  • 69 Views
  • Uploaded on

Senior Design II Project Presentation P10008 ArcWorks Cap Tube Assembly. Team Members: Faculty Guides: Adam Janicki Matthew Marshall Andrew Lawlor Chris Somers John Zeffer. Project Description Customer Needs Improved Process Original Testing Method Test Fixture Issues. Agenda.

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

Senior Design II Project Presentation P10008 ArcWorks Cap Tube Assembly


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
    Presentation Transcript
    1. Senior Design II Project PresentationP10008 ArcWorks Cap Tube Assembly Team Members: Faculty Guides: Adam Janicki Matthew Marshall Andrew Lawlor Chris Somers John Zeffer

    2. Project Description • Customer Needs • Improved Process • Original Testing Method • Test Fixture • Issues Agenda

    3. Design and implement an improved testing method • Improve assembly line process Project Description

    4. Customer Needs

    5. Budget is approximately $2500 • Total Cost to date is $2105.97 Bill of Materials

    6. 5S • Time studies to indicate bottle neck station • Water test is the bottle neck station • After implementation of new test fixture output of line should increase • New layout proposed but never implemented Process Improvements

    7. Issues with the Water Test • Messy • Slow • Difficult to determine the outcome Original Testing Method

    8. Ladder Logic • How it works • Difficulties faced • Parameters set Programming

    9. Water tested parts for 30 seconds could see air bead on some parts • Vacuum fails more parts than water test • Two cases of vacuum test passing parts that the water test failed Results

    10. Power Supply PLC LEDs Rubber base for seal Vacuum Test Fixture Vacuum Push Button start Pressure Sensor Valve

    11. Rubber base has different threshold dependent on wear of rubber • Complicated programming difficult for ArcWorks to change • 2 parts were passed with vacuum test and failed by the water test • No long term testing has been completed • Unknown if critical points are valid • Part is still suctioned on to rubber after test is complete Issues With Design

    12. Test Fixture • Development of new sealing mechanism • Further testing to develop more clear thresholds • Increase speed of test • Process • More 5S activities • Change Layout Suggestions for future work

    13. Ordering of parts • Determining Final Design • Programming • Language • Scheduling • Fell behind • Communication • Completion of tasks Difficulties Faced

    14. ?