central africa power pool capp l.
Download
Skip this Video
Loading SlideShow in 5 Seconds..
Central Africa Power Pool (CAPP) PowerPoint Presentation
Download Presentation
Central Africa Power Pool (CAPP)

Loading in 2 Seconds...

play fullscreen
1 / 5

Central Africa Power Pool (CAPP) - PowerPoint PPT Presentation


  • 963 Views
  • Uploaded on

Central Africa Power Pool (CAPP). SESSION 3: OVERVIEW. Chad. Eq.Guinea. CAR. Cameroon. Rwanda. Congo. Gabon. DR Congo. Burundi. Sao Tomé & Principe. Angola. CAPP Members . COUNTRIES Angola Burundi Cameroon CAR Congo Congo (R.D.) Gabon Equat. Guinea Rwanda (1)

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Central Africa Power Pool (CAPP)' - nelia


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
capp members

Chad

Eq.Guinea

CAR

Cameroon

Rwanda

Congo

Gabon

DR Congo

Burundi

Sao Tomé

& Principe

Angola

CAPP Members

COUNTRIES

  • Angola
  • Burundi
  • Cameroon
  • CAR
  • Congo
  • Congo (R.D.)
  • Gabon
  • Equat. Guinea
  • Rwanda(1)
  • Sao Tomé and Principe
  • Chad

COMPANIES

Ene-ep; Edel

Regideso

Aes Sonel

Enerca

SNE

Snel

Seeg

Segesa

Electrogaz(1)

Emae

Stee

(1) Membership not yet effective

capp overview
CAPP Overview
  • CAPP was set up in April 2003
  • Main Objective: Organize and manage an electric power market to satisfy all power demands in Central Africa through an interconnected electric network
  • Key activities undertaken so far:
    • Administrative and physical installation of CAPP and preparation of additional legal management texts
    • Preparation of final report of preliminary study on master plan for establishment of an electric power market in Central Africa by 2025
    • Identification of priority integrating projects (PIP) and projects of the Pilot Cross-border Electrification Programme (PPET); preparation of data sheets and terms of reference for studies on the said projects
    • Production of communication documents and the Action Plan 2006-2010
    • Activities for CAPP capacity building
  • Next key activities planned:
    • Preparation of feasibility studies on 2 PIP projects and 4 PPET projects
    • Adoption of technical, legal, commercial and regulatory instruments

for the regional electric power market

    • Organization of a Power Forum on projects to establish a regional electric power market
upcoming key projects in capp area i
Upcoming Key Projects in CAPP Area (I)

Nr.

Project Name

Country (ies)

Type(1)

Est. Cost

($M)

Est. Readiness

1

Development of Inga Site

DR Congo

REHAB + HYD GEN

Studies: 20,0

Implementation:

- Rehab: 600.0

- Hyd Gen: 3 500 +

18 000

Studies: $ 14.0 M available in ADB; Studies on Inga 3 ongoing (Westcor project); Pref. on Grnd Inga conducted

2

Inga – Calabar Interconnection

DR Congo, Congo, Gabon, Equat. Guinea, Cameroon, Nigeria

TRANS

Studies: 3.0

Implementation: 1 770.0

Draft TOR of studies ready; Draft Legal Memoranda of Understanding ready

3

Inga - Cabinda - Pointe Noire Interconnection

DR Congo, Angola, Congo

TRANS

Studies: 1.0

Implementation: 97.3

TOR for studies available;

Legal Memoranda of Understanding signed

4

Chad – Cameroon Interconnection

Chad, Cameroon

TRANS

Studies: 0.3

Implementation:

Prefeasibility study already conducted

(1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project

DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type

upcoming key projects in capp area ii
Upcoming Key Projects in CAPP Area (II)

Nr.

Project Name

Country (ies)

Type

Est. Cost

($M)

Est. Readiness

5

Cross-border electrification of Zongo (DRC) from Bangui (CAR)

DR Congo, Central African Republic

HYD GEN + OTHER

Studies: 0.13

Implementation: 28.0

Prefeasibility conducted; TOR studies and project information sheets ready; Legal Memorandum of Understanding signed; Finan. promise BADEA

6

Cross-border electrification of 7 villages (CAR) from Mobaye (DRC)

DR Congo, Central African Republic

OTHER

Studies: 0.39

Implementation: 13.8

TOR of studies and project information sheets ready;

Promise of financing of works by BADEA

7

Electrification of Léré, Para, Ribao, Momboré, Mamboroua and Binder (Chad) from Guider (Cameroon)

Chad, Cameroon

OTHER

Studies: 0.26

Implementation: 9.8

Prefeasibility conducted;

TOR of studies and project information sheets ready; Promise of finan. of works BADEA

8

Electrification of Kye-Ossi (Cameroon), Ebebiyin (Equatorial Guinea) and Meyo-Kye (Gabon)

Cameroon, Equatorial Guinea, Gabon

OTHER

Studies: 0.26

Implementation: 7.5

Prefeasibility conducted; TOR of studies and project information sheets ready

(1) Key: REHAB: rehabilitation and expansion project – HYD GEN: hydropower plant – GAS GEN: gas-fired generation project

DIV GEN: other type of power plant – TRANS: transmission project – DIST: distribution project – OTHER: other type