An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Homeowners usually expect a straight answer on timeline when they ask about shingle roof replacement. The honest response is a range, then a why. A simple one-story ranch with easy access and good weather can be torn off and re-shingled in a day. A two- story home with multiple valleys, a couple of dormers, and some rotten decking hiding under the old shingles can stretch to three or four days. Large or intricate roofs, and projects that require structural corrections or ventilation upgrades, can run a week or more. The job length is rarely about how fast a crew can nail shingles. It comes down to logistics, complexity, and the condition of what lies beneath. I have managed and inspected hundreds of shingle roofing projects. The fastest jobs share a few traits: clean access for the dump trailer, straightforward roof planes, and a trustworthy forecast. The longest ones are memorable for other reasons: hidden leaks that destroyed decking along the eaves, bricks of old nails left in the gutters from two decades ago, or a last-minute color change while the crew is halfway up the slope. All of these are manageable, but they affect the clock. A practical baseline: what “typical” looks like On a conventional suburban home of about 2,000 to 3,000 square feet with a roof pitch under 6/12, a crew of six to eight roofers can usually complete a roof shingle replacement in one to two working days. That includes tear-off, basic roof deck repairs, underlayment, flashings, and shingle installation, plus cleanup with magnets and brooms. Add a third day if you have complex details, steep pitches, or limited access. A few numbers make that less abstract. Many crews target 10 to 15 roofing squares per day, depending on pitch and complexity. One square is 100 square feet of roof area. A 30-square roof with simple planes might be a smooth two-day project. Make that roof a 10/12 pitch with two chimneys, skylights, and a valley maze, and you could be at three to four days without any unusual surprises. The stages that set the pace When customers ask why their neighbor’s roof took eight hours and theirs is scheduled for three days, I walk them through the stages and what can speed them up or slow them down. Tear-off and deck prep comes first. Most delays start here. Removing two or three layers of old shingles takes more time than a single layer. Nails that were overdriven or set into knots can cling to old decking, and brittle or delaminated plywood needs cautious handling. The best crews keep the tear-off controlled so debris doesn’t bury landscaping or clog gutters, and they stage the dump trailer close to the roof edge to avoid endless wheelbarrow runs. If the deck is sound, we move quickly. If we find soft spots around skylights or eaves, or discover a mis-vented bathroom fan that has soaked sheathing over the years, we pause and replace the bad panels. Replacing a few sheets of plywood adds a couple of hours, more if the damage is widespread. Underlayment, ice and water shield, and flashing details are next. This phase is often underestimated by homeowners because it is largely invisible when the roof is done. Good synthetic underlayment with the right fastener spacing can be rolled out swiftly, but ice and water shield in valleys and along eaves takes precision. The detail work at penetrations — pipes, chimneys, skylights — can add hours if the existing flashings were amateur work or if the roof shingle repair history includes caulk-heavy fixes. Rebuilding a counterflashing on a brick chimney can take a half day, especially if masonry saw cuts and reglets are needed. Skylight re-flashing is similar. The shingle field goes faster than anything else. With roof shingle installation, rhythm matters. Once the starter courses, drip edge, and layout are correct, crews can lay architectural shingles at a brisk clip, pausing at hips, ridges, or valleys to follow manufacturer details. Ridge vent installation, if the home needs it, adds time for cutting the slot and fastening the vent. But the field is where a seasoned crew makes up ground lost during tear-off. Final cleanup and detail pass is where professionalism shows. Magnets on the lawn and driveway, gutters cleared of granules and nails, satellite dishes re-aimed if moved, attic swept if insulation was disturbed near the eaves. A thorough cleanup takes longer than homeowners expect, especially after a multi-layer tear-off. It is also non-negotiable. What changes a one-day job into a multi-day job

  2. Five categories turn a quick roof shingle replacement into a longer project: size, pitch, complexity, access, and weather. Material choices and code requirements matter too. Roof size sets the baseline. A small cape with 18 squares can wrap up in a day if other factors cooperate. A 45-square two-story colonial simply requires more man-hours, even with a large crew. Pitch affects safety and speed. Anything over 6/12 slows production because roofers need additional fall protection anchoring and more cautious footwork. At 9/12 and steeper, expect staging and toe boards, which add setup time. Very steep pitches like 12/12 often push a two-day job to three or four. Complexity covers the details that make an estimator frown or smile: valleys, dormers, sidewall transitions, and the number of cut lines. Ten valleys take longer than two. Skylights require flashing kits or custom metal, and each adds an hour or two when done right. Chimneys vary wildly. A small metal flue with a standard boot is fast. A wide brick chimney with failing counterflashing is a half-day, sometimes more if mortar joints need attention. Access and logistics are quietly decisive. Tight driveways, septic fields that prevent placing a dump trailer near the garage, or a backyard only reachable by narrow gate all slow the debris flow. Each extra 50 feet of material hauling adds minutes that multiply across a day. Homes with extensive landscaping or delicate hardscape require extra protection and careful staging, which is time well spent. Weather and season matter. Roofing is not indoor work. Asphalt shingles demand dry conditions and minimum temperatures, usually above 40 to 45 degrees Fahrenheit for proper sealing, though many manufacturers allow cold-weather installations with modified techniques. In summer, crews may shorten the day to avoid heat stress and prevent scuffing hot shingles. In shoulder seasons, a passing shower can force a pause or overnight dry-in. Every region has its quirks too. Coastal humidity can delay morning starts while crews wait for dew to lift, and mountain areas can see afternoon thunderstorms that cut work short. Local code and material selections also shape timelines. Some jurisdictions require ice and water shield beyond the eaves, sometimes two rows or more, or insist on a particular underlayment over the entire deck. That adds material handling and detail time. Upgrades like synthetic underlayment, premium ridge vents, or copper flashings often take longer than builder-grade materials. They usually pay off in performance and durability, but they are not as fast as rolling felt and slapping on plastic vents. The hidden factor: what we find under the old shingles Nothing affects schedule uncertainty more than deck condition and hidden rot. Most roofs look fine from the street. Once shingles and felt are off, the story becomes clear. Common culprits include poor attic ventilation, bath fans exhausting into the attic, or past ice dams. You can often smell a deck problem before you see it. Damp plywood has a sweet, musty odor, and delaminated sheets flex underfoot. Replacing a single 4-by-8 sheet adds about 20 to 40 minutes if access is easy. Replacing ten sheets on a two-story home can absorb half a day or more. I’ve seen simple shingle roof repair band-aids hide bigger issues. A bead of caulk around a boot flashing might have stopped a leak last winter, but prolonged moisture can turn the surrounding deck soft. When we pull that area open, the repair expands: new sheathing, a proper flashing boot, and sometimes sistering a rafter edge where decay crept in. It’s the right fix, and it adds hours. Skylights deserve special mention. Older units with compromised seals often fog on cool mornings. If you are replacing shingles and the skylight is older than the roof, consider replacing the unit rather than reusing flashings. It adds cost and an hour or two per skylight, but saves you from a leak that demands roof shingle repair after the new shingles are down. Crew size and production reality Homeowners sometimes ask if they should hire a bigger shingle roofing contractor to finish faster. Crew size helps, up to a point. Roofing is a choreographed task. Too many people on a steep roof create crowding and safety risks. The sweet spot for a typical 25 to 35 square roof is six to eight qualified roofers, plus a runner on the ground. Large, simple roofs can use more hands efficiently, especially during tear-off and material staging. Tight or complex roofs gain less from extra bodies. Efficiency comes from planning more than head count. Material staging ahead of time, correct shingle color and style delivered, and the right number of bundles hoisted to each plane reduce back-and-forth. A foreman who sequences tear-off in sections to keep the deck dry even if a surprise shower hits is worth more than two extra laborers.

  3. Seasonality and best scheduling practices If you can choose timing, the sweet windows for shingle roofing in many regions are mid-spring through early summer, and again in early fall. Temperatures are moderate, seal strips activate within a day or two, and weather patterns are more predictable. Winter works in many climates with experienced crews who know cold-weather techniques. It simply runs slower, both for safety and for the extra handling care cold shingles require. Summer heat can speed sealing but slows people. A 95-degree day on a dark shingle roof is 140 degrees underfoot, and crews must pace themselves. Workdays are shaped by sunrise, sunset, and neighborhood norms. Most roofers start between 7 and 8 a.m. and wrap by late afternoon. That rhythm yields about eight productive hours per day. Plan your expectations around that cadence, and ask your contractor how they handle late-day rain chances. A good answer references partial tear-offs, tarps, and a policy of not opening more roof than they can dry-in before lunch. What you can do to keep the timeline tight Homeowners play a real role in schedule success. A few practical steps before roofing day keep the crew focused on the work instead of obstacles. Clear the driveway and the sides of the house of vehicles and breakables, and open gates so crews can stage materials and the dump trailer as close as possible. Remove wall hangings on the upper floors and in the attic that might rattle during tear- off, and protect attic storage from dust with plastic sheeting if the space is unfinished. Those two moves shave small delays that add up. If you have irrigation lines or delicate plantings along the foundation, flag them and mention it to the foreman. Crews typically protect landscaping with tarps and plywood, but a heads-up avoids missteps. Decision clarity matters too. Confirm your shingle color, style, and accessory choices at least a week in advance. If you are considering a ridge vent, drip edge color to match fascia, or an upgrade to synthetic underlayment, agree on those details before delivery day. Changing materials mid-job often causes half-day delays while supply houses run a second ticket. Finally, ask about permits and inspections. Some municipalities require mid-project inspections after tear-off to verify deck condition, nail pattern, or ice and water shield placement. If your shingle roofing contractor schedules that inspection proactively, the job flows. If not, you could have an idle afternoon waiting for a slot. Edge cases that stretch the calendar Most roofs fit the one to three day spectrum, but certain situations predict longer timelines. Historic homes and specialty flashings call for custom sheet metal. Copper or factory-painted steel saddle flashings, step flashings, and counterflashings require fabrication and patience. Expect added time on site and sometimes a lead time for the metal shop. Complex roof geometries take time to execute properly. Think turrets, eyebrow dormers, or intersecting gables with short runs. Unlike large, straight runs where crews can fly, these details slow layout and increase cutting. The work is rewarding, but the clock moves differently. Insurance-driven projects after storms often include extra documentation, photo checkpoints, and supplements if hidden damage emerges. None of that is cutting shingles. It is part of the process, and it lengthens the day. Solar arrays and rooftop accessories add steps. If you have solar panels, they must be removed and reinstalled by a qualified team. Coordinate schedules so the roof is not sitting open, waiting on a removal crew. Satellite dishes, lightning rods, and holiday light anchors also need thoughtful treatment. Ventilation corrections can add hours and occasional structural carpentry. Cutting in a continuous ridge vent is quick. Adding intake vents where none exist may involve soffit work. If baffles are needed to keep insulation from blocking airflow at the eaves, that happens from inside the attic and takes time. Repair versus replacement timelines

  4. Roof shingle repair often finishes in a few hours. Swapping a failed pipe boot, re-flashing a single sidewall, or replacing a few damaged shingles is a half-day for a two-person crew. The wrinkle, again, is what hides beneath. A leak that has marked a bedroom ceiling for months may have soaked the deck. If the soft area is compact, the repair stays small. If decay has spread, the repair creeps toward replacement territory. It is common for homeowners to hope a repair will buy a few years. Sometimes it does. I’ve seen ten-year-old dimensional shingles damaged in a wind event get patched cleanly. I’ve also seen patchwork on a 20-plus-year-old roof turn into a pattern of repeat calls because each fix exposes the next weak point. If a roof is at or past its service life and you are making multiple calls a year, the economics and the schedule both favor a full roof shingle replacement. What a dependable contractor will tell you upfront The best predictor of a reliable timeline is how your shingle roofing contractor talks during the estimate and planning. Specifics beat generalities. A professional will: Describe how many crew members will be on site and the expected daily production in squares, adjusted for your roof’s pitch and complexity. If you hear that and see it reflected in a written scope, your schedule is in good hands. Vague promises of “in and out in a day, guaranteed” on a steep, valley-heavy roof should give you pause. Ask about contingency planning. How do they handle mid-job discoveries like rotten decking, chimney flashing that requires masonry work, or a skylight that defies reuse? Clear unit pricing for decking replacement and protocols for unexpected conditions prevent long pauses while you negotiate surprises. Clarify communication. You want a foreman on site who can make decisions, explain progress, and coordinate with you if a second day becomes necessary. Crews that disappear mid-job to start another project tend to stretch timelines and fray nerves. Walkthrough of a two-day replacement on a typical home To make this tangible, here’s how a two-day roof shingle installation often flows on a 28-square, moderately pitched, two-story home with a couple of small valleys and one chimney. Day one starts with protecting the property. Tarps cover landscaping, plywood shields AC units, and a magnet sweep catches old nails in the driveway. Tear-off begins at the back, one section at a time. Debris goes straight into the trailer near the garage. Crews expose the deck on the first half of the roof before lunch. The foreman checks the sheathing, marks two soft spots by the eaves, and replaces those sheets of plywood. By early afternoon, ice and water shield is down on eaves and valleys, synthetic underlayment covers the field, and drip edge is installed. Step flashing is set aside for the sidewall, and a chimney flashing inspection confirms the need for new counterflashing. Shingle installation begins on the rear planes, working upslope to avoid walking on fresh shingles in the afternoon heat. The day ends with the back half shingled, ridge capped on that section, and the front dried-in with underlayment and valley protection. The site is swept and secured for overnight. Day two opens with a quick weather check. The crew tackles the front planes, lays the field shingles, and then turns to the chimney. A metal brake on site lets them form counterflashing to fit the brick. The ridge vent slot is cut along the main ridge, vent installed, and the ridge cap finishes the line. Gutters are cleaned, the yard gets a slow magnet sweep, and a final walkaround with the homeowner covers details: shingle color match, vent count, and confirmation that the bath fan is now properly vented through a dedicated hood. By late afternoon, the trailer is hitched and the driveway is clear. That cadence has variations. If the forecast shows afternoon storms on day one, the foreman may choose to dry-in the entire roof before shingling any sections, then lay shingles on day two. If the chimney counterflashing demands mortar cure time, a brief third visit might be necessary. When speed shouldn’t be the goal It is understandable to want a fast job. Noise, debris, and strangers on your roof are disruptive. Still, certain parts of shingle roofing reward patience and precision. Valleys, penetrations, and flashing transitions are the most common leak points, and they

  5. are where rushed work shows up months later. I have revisited jobs by others where nails were driven high in the shingle or out of the nailing zone, or where a step flashing course skipped a piece. Those mistakes save minutes and cost years of performance. Similarly, thorough cleanup is not fluff. Leaving nails in the grass is a safety issue. A deliberate cleanup passes a magnet in overlapping patterns and checks downspouts and driveway edges where debris collects. If that adds an hour at the end of the job, it is time well spent. Cost and timeline are linked, but not perfectly Faster is sometimes cheaper, but not always better, and not always feasible. A larger crew can finish sooner, but you pay for additional labor. Highly efficient crews often command higher prices because they retain skilled workers who can handle complex details without callbacks. If two bids differ on timeline by a full day, look at the scope. One may exclude chimney flashing or deck repair beyond token amounts. Those exclusions shift time and cost to you when the problem surfaces. Do not be shy about asking your contractor to break out line items for decking replacement per sheet, chimney counterflashing, skylight replacement, and ventilation upgrades. Clear unit pricing turns unknowns into knowns and prevents long pauses mid-job while you haggle over a newly discovered soft eave. A quick reference for typical timelines Small, simple one-story home, low pitch, single-layer tear-off, no surprises: often 1 day. Average two-story home with moderate pitch and a few valleys: usually 2 days. Large or steep roof with multiple details or limited access: plan for 3 to 4 days. Roofs with significant deck replacement, masonry flashing work, or skylight swaps: 3 days to a week, depending on scope and inspections. Those ranges assume competent crews and cooperative weather. They are not guarantees, but they reflect the way shingle roof projects tend to go when executed with care. Final advice from the field Choose your shingle roofing contractor as carefully as you choose your shingles. An organized contractor who respects staging, communicates clearly, and manages details will give you an accurate schedule and hit it more often than not. Ask for a start date range, not a single day, and discuss what happens if weather intrudes. Confirm that only as much of the roof will be exposed as can be dried-in the same day. Make your decisions before the shingles arrive, and be available by phone while the crew is on site. Roof shingle replacement is one of the few major home improvements you can watch transform your house in a day or two. The work is noisy, brisk, and occasionally messy, but it is also methodical. When done right, the pace feels steady rather than rushed, and each hour brings visible progress. With the right plan, crew, and conditions, you will see that new shingle roof installed efficiently, the site left spotless, Express Roofing Supply roof shingle replacement and the worry of leaks replaced with the quiet confidence of a roof that will ride out many storms to come. Express Roofing Supply Address: 1790 SW 30th Ave, Hallandale Beach, FL 33009 Phone: (954) 477-7703 Website: https://www.expressroofsupply.com/

  6. FAQ About Roof Repair How much should it cost to repair a roof? Minor repairs (sealant, a few shingles, small flashing fixes) typically run $150–$600, moderate repairs (leaks, larger flashing/vent issues) are often $400–$1,500, and extensive repairs (structural or widespread damage) can be $1,500–$5,000+; actual pricing varies by material, roof pitch, access, and local labor rates. How much does it roughly cost to fix a roof? As a rough rule of thumb, plan around $3–$12 per square foot for common repairs, with asphalt generally at the lower end and tile/metal at the higher end; expect trip minimums and emergency fees to increase the total. What is the most common roof repair? Replacing damaged or missing shingles/tiles and fixing flashing around chimneys, skylights, and vents are the most common repairs, since these areas are frequent sources of leaks. Can you repair a roof without replacing it? Yes—if the damage is localized and the underlying decking and structure are sound, targeted repairs (patching, flashing replacement, shingle swaps) can restore performance without a full replacement. Can you repair just a section of a roof? Yes—partial repairs or “sectional” reroofs are common for isolated damage; ensure materials match (age, color, profile) and that transitions are properly flashed to avoid future leaks. Can a handyman do roof repairs? A handyman can handle small, simple fixes, but for leak diagnosis, flashing work, structural issues, or warranty-covered roofs, it’s safer to hire a licensed roofing contractor for proper materials, safety, and documentation.

  7. Does homeowners insurance cover roof repair? Usually only for sudden, accidental damage (e.g., wind, hail, falling tree limbs) and not for wear-and-tear or neglect; coverage specifics, deductibles, and documentation requirements vary by policy— check your insurer before starting work. What is the best time of year for roof repair? Dry, mild weather is ideal—often late spring through early fall; in warmer climates, schedule repairs for the dry season and avoid periods with heavy rain, high winds, or freezing temperatures for best adhesion and safety.