280 likes | 377 Views
Detailed monitoring data on dust, blasting, rainfall, water quality, groundwater, and noise levels for Ashton Coal Operations. No exceedences reported for noise levels or environmental complaints in February 2011.
E N D
Ashton Coal Operations Pty Limited Community Consultative Committee EnvironmentalReport 4thMARCH 2011
Depositional Dust Monitoring
Total Suspended Dust Monitoring
PM10 Dust – Site 1 Monitoring Maximum daily limit 150µg/m3
PM10 Dust – Site 2 Monitoring Maximum daily limit 150µg/m3
PM10 Dust – Site 3 Monitoring Maximum daily limit 150µg/m3
PM10 Dust – Site 8 Monitoring Maximum daily limit 150µg/m3
Blasting Statistics at 1st March 2011 63blasts have been fired for the reporting period to date.
Rainfall Monitoring
Water Sampling Locations Monitoring
Water Quality - pH Monitoring
Water Quality - pH Monitoring
Water Quality - EC Monitoring
Water Quality - EC Monitoring
Water Quality - EC Monitoring
Groundwater Sampling Sites Monitoring
Groundwater – Standing Depth Monitoring
Groundwater – Standing Depth Monitoring
Groundwater – EC Monitoring
Noise Monitoring Statutory noise monitoring was conducted in February 2011. There were no exceedences for the reporting period. Noise
Complaints Community DECC Total complaints 4 – , Total enquiries - 0
Any Questions? The End