Detailed overview of the power system design for Porter Farms P.D. project in Collierville, TN, including specifications, calculations, cost analysis, and project stages. Three design options discussed with advantages and encountered problems. Final design details, load calculations, and project summary provided.
E N D
Christian Brothers University650 East Parkway S, Memphis TN 38104 MAESC CONFERENCE - 2005 Provisioning the Power System for the Porter Farms P.D. By: Marnelli Pascual
Overview • What is Porter Farms P.D.? • Preliminary Designs • Loop System • Specifications • Calculations • Cost Analysis • Project Summary
Porter Farms P.D. • Consists of 2 Areas • Area 1, Subdivision with 69 lots • Area 2, Apartments with 52 units, plus 1 clubhouse • Located in Collierville, TN
Project Stages • Stage 1 • Develop Area 2, Apartments • Stage 2 • Develop Area 1, Subdivision
Existing Power Sources 3Ø 1Ø 3Ø
Design 1 – Two UG Loops BORE UNDER RAILROAD
Design 1 (cont’d) BORE UNDER THE STREET
Design 1 (cont’d) • Advantages • Feeds are from the closest sources • No tree trimming/removal required • Problems Encountered • Railroad approval takes at least 90 days • Minimum railroad crossing fee of $75,000
Design 2 – Two UG Loops NEW 1Ø OVERHEAD LINE LAKE
Design 2 (cont’d) • Problems Encountered • Crossing fee and approval from Railroad company required • City of Collierville and the homeowner’s association objected to the design • Involves tree trimming/removal
Design 3One UG Loop UNDERGROUND PRIMARY TEMPORARY OVERHEAD LINE
Design 3 (cont’d) BORE UNDER THE STREET
Design 3 (cont’d) • Advantages • No railroad fee or approval required • No tree trimming/removal • Problem Encountered • Cost of $10,000 for the temporary electric
UG Single Loop • Calculated Loads • Apartments = 525kVA • Subdivision = 775kVA • Total = 1300kVA • MLGW Requirement • Maximum load = 1320kVA
Transformer Isolation DISCONNECT
Specifications • Fuse: (2) 100 A • Transformers Used (Area 1 & 2) • (3) 50 kVA • (14) 75 kVA • (1) 100 kVA • Cables & Conduits • Primary: #2 insulated copper inside 2” pvc conduit • Secondary: 350 kCM triplex inside 3” pvc conduit • Meter Sockets (Apartments) • (12) 6-Gang Meter • (2) 2-Gang Meter • (1) Single Meter
Specifications (cont’d) • 6-Gang Meter Socket RISER ENTRY
Specifications (cont’d) • Location of Facilities • Riser Location
Specifications (cont’d) • Location of Facilities • Transformer Location (Apartments)
Specifications (cont’d) • Location of Facilities • Transformer Location (Subdivision)
Calculations • Cost: Software-calculated • Fuse: No calculation needed • Cables & Conduits • Size: Software-calculated based on cable length and load • Length: Measured from map
Calculations (cont’d) • Cable Tension, ≤ 850 lbs. • Maximum Tension = 831 lbs. • Software-calculated
Calculations (cont’d) • Transformer Size (Apartments) Equation 1
Calculations (cont’d) • Transformer Size (Apartments) Calculated Total Load per Unit = 15.32 kVA Equation 2
Calculations (cont’d) • Transformer Size (Subdivision)
Project Summary • All requirements were met • MLGW and the customer approved the final design • Project is currently under construction