An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Loan/Grant Administration

  2. Types of Financing • Highly concessional • Hardened terms • Intermediate terms • Ordinary terms

  3. Description of lending terms • Highly concessional – no interest, service charge of 0.75%, repayment in 40 years including 10 years grace period • Hardened terms – no interest, service charge 0.75%, repayment in 20 years including 10 years grace period • Intermediate terms – interest @ 0.5% of IFAD Reference rate, maturity period 20 years including 5 years grace period • Ordinary terms – interest on par with IFAD Reference rate, maturity period 15-18 years including 3 years grace period

  4. Basic documents • Financing Agreement • Letter to the Borrower • Loan Disbursement Handbook • AWPB • Procurement Plan

  5. Standard Procedures • Replenishment to Special Account/Designated Account • Reimbursement • Direct Payment • Special Commitment

  6. Special Account/Designated Account • Provides a mechanism, somewhat like an imprest account • Borrower should have sufficient control and financial systems • Should be in a currency and bank acceptable to IFAD

  7. Special Account/Designated Account • Initial deposit will be determined by the Borrower • Administered by CAA&A • Audit of Special Account done by the office of C&AG • Ceiling of Authorised Allocation

  8. Replenishment • Should be in USD • Atleast or equal to 20% of the advance

  9. Reimbursement • Outside Designated Account • For Government pre-financed expenditure • Could be in any currency requested by the borrower • Will not flow to Designated Account • Should not be later than 3 months

  10. Direct Payment • IFAD directly pays third party • Project instructs IFAD to pay directly • In-country banking regulations are stringent • For above USD 20,000 • Documentation should show evidence of amount due

  11. Direct Payment • For above USD 20,000 • Documentation should show evidence of amount due • Progress or due payments • Only to party in the contract • Payment instructions should be clear

  12. Recovery of Initial Deposit • Balance in the Loan Account minus committed expenditures equals to twice the authorised allocation • 6 months before Project Completion • Balance in SA/DA to be refunded

  13. Basic formats for Withdrawal Applications • Form 100 – to be filled by CAA&A • Application Summary Sheet (supported by documentation) • Statement of Expenditure • Special Account Reconciliation Statement

  14. Statement of Expenditure (SoE) • Normally used where it is impractical or unduly burdensome to provide documentation • No documentation required • Threshold in the LTB • Separate forms for each category • Breakdown of expenditure

  15. Statement of Expenditure (SoE) • IFAD to be satisfied about the Borrower’s/LPA’s accounting standards, internal control, auditing capabilities are sound and adequate • SoE method could be for threshold value of expenditure or for a particular category • Threshold could be revised either way, if situation warrants.

  16. What a SoE should contain? • Form 100 • Special Account statement • Abstract of summary sheets • SoE – signed by PD and Borrower – for each category • Breakdown of expenditure

  17. Breakup of Expenditure • Reasonable disclosure of expenditure within the category • PMU/District units-wise • Activities • Why the breakup is required?

  18. Documentation required - Overall • The signed contract or confirmed purchase order– showing the specified amount that is due to be paid; • The bank guarantee for advance payment, as specified in the contract documents; • The bank guarantee for performance, as specified in the contract documents; • Copies of communications sent by the IFAD country programme manager to the lead project agency providing the ‘no objection’ (whether post or prior) to the contract award; and • Evidence of payment.

  19. Documentation required (contd) In additional to overall requirements, for goods: • Supplier’s invoice, duly certified for payment specifying the goods, their quantities, and prices; • Bills of lading or similar documents; and • As appropriate, the certificate of delivery (to include condition of goods on delivery).

  20. Documentation required In addition to overall requirements, for Consultancy payments: • The supplier’s or consultant’s claim, duly certified for payment and showing sufficient detail; and • As appropriate, a certificate of delivery of satisfactory services.

  21. Documentation required For progress and retention payment of civil works: • The claim of the contractor, including a financial progress report, stating the work performed and the amount due; • A certificate – signed by the project consultants or owner’s representative, if any, or by • the borrower’s chief engineering officer to the effect that the work performed is satisfactory and the payment claimed is due in accordance with the terms of the contract; and • A copy of the contract payment monitoring form signed in original by the certifying officer.

  22. Wtihdrawal of Loan resources • Expenditure to cover reasonable cost of goods and services required for the project • Establishing the trail of the expenditure to the AWPB • Within the programme implementation period • Category ceilings are not exceeded • Establish the recommendations of the JRM are complied with • Status of audit reports • Compliance of reporting

  23. Rejection of WAs • IFAD may reject the WA either fully or partially • Requested information is not provided within the timeline (7 days) • Project to resubmit the WA in full or part

  24. Why IFAD rejects the WA • No trail available to AWPB • Procurement not as per the approved Procurement Plan • Wrong Categories • Incorrect eligible percentages • No breakup available for review

  25. Measures that could be adopted • Refer the Cost Tables or Costab files for correct category • Financing Agreement provisions • Expenditure as per the AWPB • Respond within the timeline • Use checklist

  26. Reconciliation of Disbursement • IFAD sends copy of Disbursement Advice • Historic transaction • Status of Funds by Category • PMU to reconcile

  27. Register of Contracts • List all contracts with relevant details • Form C10 from LDH • Contract Monitoring Form C11 from LDH • Certified copies of contracts (prior review procurement and above SoE threshold) to be sent to IFAD