1 / 7

项目管理空间思维与配置工具

项目管理空间思维与配置工具. 思软软件公司 2010-0102. 项目质量. 项目周期与测试周期 项目范围与测试目的 质量评定标准 项目测试计划 人员成本计划 分阶段测试计划 项目测试报告. 项目周期与测试周期. 本阶段项目周期: 2009-10-01 日起 --- 至 2010-01-02 止 本阶段项目测试周期: 2009-10-01 日起 --- 至 2010-01-02 止. 项目范围与测试目的. 项目范围 严格实现且仅实现 项目管理空间思维与配置工具 ( PMCT )本阶段开发详细设计文档所包含的所有功能 软件相关的所有说明性文档

nancy
Download Presentation

项目管理空间思维与配置工具

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 项目管理空间思维与配置工具 思软软件公司 2010-0102

  2. 项目质量 • 项目周期与测试周期 • 项目范围与测试目的 • 质量评定标准 • 项目测试计划 • 人员成本计划 • 分阶段测试计划 • 项目测试报告

  3. 项目周期与测试周期 • 本阶段项目周期:2009-10-01日起---至2010-01-02止 • 本阶段项目测试周期:2009-10-01日起---至2010-01-02止

  4. 项目范围与测试目的 项目范围 • 严格实现且仅实现项目管理空间思维与配置工具 (PMCT)本阶段开发详细设计文档所包含的所有功能 • 软件相关的所有说明性文档 • 平台性能测试及安装测试

  5. 测试目的 • 保证产品质量达到各干系人的要求标准,尽量帮助平衡各方利益或需求,帮助项目最终满意验收。

  6. 质量评定标准(扩展定义) • P1系统崩溃,各种不可恢复性错误 • P2软件的主要功能不实现或不能正常工作。可恢复性的严重错误 • P3局部性的功能错误,但不影响整个系统运行。 • P4界面、显示问题。与所发布目标平台相关的系统问题。 • P5用户使用习惯、专家建设性意见 接受标准:不存在P1,P2,P3类型问题,P4<=3,P5<=5。注:如发现问题24小时之内给予解决的问题不记录在此评定标准问题之列。应记为产品发布客户自定义过程解决方案。

  7. 项目测试计划 • 人员成本计划 • 分阶段测试计划 • 项目测试报告

More Related