甘特圖排程技術說明 成漢科技

甘特圖排程技術說明 成漢科技. 三軸甘特圖排程概念. 動態模擬排程技術. Operation 10 M3. Operation 10 M1. Operation 20 M4. Operation 20 M2. Operation 30 M2. Operation 30 M3. Operation 40 M1. Operation 40 M4. 時間軸(生產條件). 機 器 軸 ︵ 製 程 複 雜 度 ︶. M1/Process 1. M2/Process 2. M3/Process 3. M4/Process 4.

nam
Download Presentation

甘特圖排程技術說明 成漢科技

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 甘特圖排程技術說明 成漢科技

  2. 三軸甘特圖排程概念

  3. 動態模擬排程技術 Operation 10 M3 Operation 10 M1 Operation 20 M4 Operation 20 M2 Operation 30 M2 Operation 30 M3 Operation 40 M1 Operation 40 M4 時間軸(生產條件) 機 器 軸 ︵ 製 程 複 雜 度 ︶ M1/Process 1 M2/Process 2 M3/Process 3 M4/Process 4 A1 A2 A3 A4 訂單軸(訂單複雜度)

  4. 動態模擬排程技術 (正向) (逆向) Operation 10 M1 Operation 20 M3 Operation 30 M4 時間軸(生產條件) 與A1在M1重疊 機 器 軸 ︵ 製 程 複 雜 度 ︶ M1/Process 1 M2/Process 2 M3/Process 3 M4/Process 4 A1 A2 A3 A4 訂單軸(訂單複雜度)

  5. 排程與排序

  6. 排程規則不同的比較 範例:2個連續工作站,每站一部工作機台 3個等待加工工作,加工時間及交期如下

  7. 7 13 14 0 7 6 1 3 6 8 27 19 10 EDD (Earlier Due Date)最早交期優先規 排程方法(一) • 交期達成率 • 產能使用率

  8. 1 8 14 0 1 7 6 8 3 6 12 20 9 排程方法(二) SPT (Shortest Processing Time)最短加工時間優先規則 • 交期達成率 • 產能使用率

  9. 6 14 13 0 1 7 6 6 8 3 12 16 24 排程方法(三) CR (Critical Ratio)關鍵係數規則 • 交期達成率 • 產能使用率

  10. 1 7 14 0 6 7 1 3 8 6 18 15 9 Optimal 最優排產 排程方法(四) ??規則 • 交期達成率 • 產能使用率

  11. 排程規則  排序 生產條件的滿足排程 ? 排序 ? 管理目標的滿足排程 ? 排序 ? 現場事實的滿足排程 ? 排序 ?

  12. APS方法論實例比較

  13. 生產排程方法論實例的比較 Example:2工作站串連,2訂單 (TOC/ThruPut方法比較說明) 瓶頸製程 價格 - 成本 TP = ----------------- 加工時間 B A

  14. M1-1 M1-2 M1-3 M1-4 M2-1 M2-2 M2-3 M2-4 M2-5 M2-6 Time 13 30 10 23 25 28 18 20 15 8 TOC/ThruPut方法 1(8) 5(2) 13(2) 17(2) 1(2) 9(2) 14(2) 2(2) 10(2) 6(2) 18(2) 2(8) 3(8) 3(2) 7(2) 19(2) 15(2) 11(2) 4(8) 4(2) 8(2) 16(2) 20(2) 12(2) 3(5) 1(5) 9(5) 15(5) 2(5) 4(5) 10(5) 16(5) 使用率 = 69.8 3(5) 5(5) 11(5) 17(5) 4(5) 6(5) 12(5) 18(5) 7(5) 13(5) 1(5) 19(5) 2(5) 8(5) 14(5) 20(5)

  15. M1-1 M1-2 M1-3 M1-4 M2-1 M2-2 M2-3 M2-4 M2-5 M2-6 Time 24 22 7 23 9 12 10 17 19 4 18 2 SPT 方法(產能發揮) 1(8) 5(2) 13(2) 17(2) 1(2) 9(2) 14(2) 2(2) 10(2) 6(2) 18(2) 2(8) 3(2) 3(8) 7(2) 19(2) 15(2) 11(2) 4(8) 4(2) 8(2) 16(2) 20(2) 12(2) 1(5) 7(5) 13(5) 19(5) 20(5) 14(5) 8(5) 2(5) 使用率 = 86.9 工單B交期延遲 1(5) 3(5) 9(5) 15(5) 2(5) 16(5) 4(5) 10(5) 5(5) 17(5) 3(5) 11(5) 6(5) 18(5) 4(5) 12(5)

  16. M1-1 M1-2 M1-3 M1-4 M2-1 M2-2 M2-3 M2-4 M2-5 M2-6 Time 26 21 2 12 13 9 22 24 14 17 18 15 19 16 8 10 7 4 DSST Engine 方法 11(2) 13(2) 15(2) 1(8) 17(2) 1(2) M1工作站工作排序: A_4:B_2:A_6:B_2:A_10 工單拆批 12(2) 14(2) 16(2) 2(2) 18(2) 2(8) 5(2) 3(2) 7(2) 9(2) 3(8) 19(2) 10(2) 6(2) 8(2) 4(8) 4(2) 20(2) 機台分用 1(5) 7(5) 11(5) 15(5) 2(5) 16(5) 8(5) 12(5) M2工作站工作排序: A_10:B_2:A_4:B_2:A_6 13(5) 17(5) 3(5) 9(5) 使用率 = 83.3 18(5) 10(5) 14(5) 4(5) 5(5) 1(5) 19(5) 3(5) 6(5) 2(5) 4(5) 20(5)