1 / 5

Maximizing Efficiency in Design-Build: Selecting Subcontractors Strategically

Learn the value of early subcontractor involvement, details of design-cost relationships, programming criteria, and managing the process successfully at the 2014 Regional Conference on Design-Build. Moderator: Ted Laszlo, GH Phipps. Panelists: Jim Dent, Weifield Electric; Tal Clark, US Engineering; Brian Patton, JR Butler; Eric Moe, Puma Steel.

nadine
Download Presentation

Maximizing Efficiency in Design-Build: Selecting Subcontractors Strategically

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER When to Select a Subcontractor in the Design Build Process Moderator: Ted Laszlo, GH Phipps Panel: Jim Dent, Weifield Electric Tal Clark, US Engineering Brian Patton, JR Butler Eric Moe, Puma Steel 1 1 1

  2. 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER Value Through Early Involvement 2 2 1

  3. 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER Details of the Design Design/Cost Relationship Range of Design $ Cost (and performance) is fixed Designing to the Budget 3 3 1

  4. Programming 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER Design Criteria Design-Build 5% - 20% Preliminary Design Design-Build 20% -35% Direct Sole-Source Selection -10% - 5% Schematic Design Design Development Construction Documents Qualifications Emphasis Technical & Price Emphasis Low Price Emphasis CRITERIA DOCUMENTS Describes End Result BRIDGING DOCUMENTS Prescribes How To Achieve End Result Award Criteria During the Process Design/Draw-Build 35% Design or Greater -10% -5% 0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% Pre-Design Design 4 4

  5. 2014 REGIONAL CONFERENCE DESIGN-BUILD START SOONER... FINISH FASTER Managing the Process • Key Attributes of a Successful Project • Leadership • Collaboration • TRUST • Key Owner Management Points: • Well defined program requirements • Understanding of contract • Clear direction • Timely decisions • Collaborative atmosphere • Timely Payment 5 5 1

More Related