1 / 2

CIT 249 Week 5 Individual Assignment Final Configuration of a Network Routing System//tutorfortune.com

CIT 249 Week 5 Individual Assignment Final Configuration of a Network Routing System//tutorfortune.com<br><br>Click on below link to buy<br>https://tutorfortune.com/products/cit-249-week-5-individual-assignment-final-configuration-of-a-network-routing-system<br><br>Resources:<br>u2022tPractice Labs modules in the Practice Labs course "101-105- Interconnecting Cisco Networking Devices (ICND1 v3.0)" from all weeks<br>u2022tTeam collaboration discussions, and class discussions from previous weeks<br>u2022tThe Lab Layout Reference Diagram document<br>Launch the following module in the Practice Labs course "101-105- Interconnecting Cisco Networking Devices (ICND1 v3.0)":<br>u2022tConfigure and Verify Device Management<br>Perform the following steps:<br>1.tAccording to the Lab Layout Reference Diagram, determine and apply the initial switch configuration on the NYACCESS1 and NYCORE1 switches.<br>2.tAccording to the Lab Layout Reference Diagram, determine and apply the initial router configuration on the NYEDGE1 and NYEDGE2 routers.<br>3.tAccording to the Lab Layout Reference Diagram, determine and apply the VLANs and Trunk configurations to meet the following requirements:<br>otOn NYACCESS:<br>uf0a7tCreate VLAN16 - Named Engineering<br>uf0a7tCreate VLAN17- Named Marketing<br>uf0a7tCreate VLAN18 - Named Sales<br>uf0a7tConfigure Fa0/1 as a member of VLAN16<br>uf0a7tCreate SVI VLAN17withIP Address 192.168.17.10/24<br>otOn NYCORE1:<br>uf0a7tCreate VLAN16 - Named Engineering<br>uf0a7tCreate VLAN17- Named Marketing<br>uf0a7tCreate VLAN18 - Named Sales<br>otCreate trunk links between NYACCESS1 and NYCORE1 for VLANs 16 - 18<br>otCreate a trunk link between NYCORE1 and NYEDGE1 for VLANs 16 - 18<br>4.tAccording to the Lab Layout Reference Diagram, determine and apply the configuration necessary to implement inter-VLAN routing with router on a stick on NYEDGE1 for VLANs 16 - 18.<br>5.tConfigure a default route on NYEDGE1 to 192.168.254.2.<br>6.tConfigure a static route on NYEDGE2 for 192.168.16.0/24 to NYEDGE1<br>7.tVerify all configurations.<br>From within Practice Labs, copy and paste the final config from each device into a Microsoftu00aeWord document. Please ensure that you have a full "show running config" output visible from any devices modified as part of the lab. Save the file as "Final_Configuration".<br>Submit your assignment using the Assignment Files tab.<br><br>Click on below link to buy<br>https://tutorfortune.com/products/cit-249-week-5-individual-assignment-final-configuration-of-a-network-routing-system<br><br><br><br>

museka
Download Presentation

CIT 249 Week 5 Individual Assignment Final Configuration of a Network Routing System//tutorfortune.com

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


More Related