An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IPF readiness status • Overview of the IPF readiness status • Open items • Level 2 algorithms verification sub-group activities • Evolutions and updates mechanisms

  2. Overview of the IPF readiness status • RA2/MWR IPF FAT held at the end of June: • L1b processing without problems • Good match between IPF L1b output data and L1b TDS from ref. processor (ALS) • MWR_SLT_AX and RA2_CST_AX updated in the latest TDS following MWR group suggestions • Negative Tbs coming in the TDS due to the new T_sh value in the Constants file • Original value of T_sh stored in the aux. file for the next TDS delivery before launch • The final pre-launch configuration will contain the new value

  3. Overview of the IPF readiness status • L2 processing still under analysis • Discrepancies between IPF L2 output data and L2 TDS from ref. processors (CLS/MSSL)

  4. Open items • Level 1b: • Some MWR SPRs raised by ALS on the ref. processor code and DPMs to be passed on to the IPF for implementation • e.g. MWR Tbs to be set to 0 if not enough number of calibration (Offset) measures in the input L0 data, warning Telemetry flags, max/min values for Tbs range checks stored in MWR_CHD_AX, etc. • Level 2: • Discrepancies between IPF processor and TDS still to be solved (results of the ocean retracking, accuracy in some geophysical parameters, …) • A bunch of SPRs accumulated on Level 2 DPMs/IODDs to be passed on to the IPF

  5. Open items • e.g. new level 2 MWR algorithms (MWR water vapour content, wet tropo correction and cloud liquid water content for both RA2 and MWR MDS, and atmospheric attenuation corrections)

  6. Level 2 algorithms verification subgroup • Objectives: • verification of all geophysical RA2 and MWR algorithms • algorithms used also in other missions (for these, only precision and impact on the output values will be checked) and new algorithms (for these, extensive verification will be needed) • which data used: FDGDR/FDMAR (IPF) and IGDR/IMAR, GDR and SGDR (F-PAC) • quantity of data used: small sets of data (2-3 orbits) to examine most of the output params, and then larger sets of data (7-35 days) t operform statistical analysis, fine tuning, ...

  7. Level 2 algorithms verification subgroup • validation of the Level 2 products • verification of headers (consistency between the information in the headers and in the records) • verification of MDS parameters not verified before

  8. Evolutions and updates mechanisms • Necessity of upgrade aux. files and algos near the end of CP may arise, following the work done by cal/val teams. • Requirement to upgrade aux. files/algos to be triggered by sub-group leaders (RA2 L1b, RA2 L2 and MWR): • ESLs to write SPR on applicable DPM, to validate it on a prototype processor (copy of the ref. processor) and to produce TDS (to test evolution on IPF/F-PAC) that will be delivered to the CCVT coordinator. • If deliverables acceptable, they’ll be passed to ESA/Alcatel interface for IPF and to ESA interface for F-PAC, for implementation • Time scale very short, since this evolution has to be done before the end of CP