1 / 16

DOE Status Review

The goal of this project is to assemble and align four devices on each production girder to ensure precise installation in the Undulator hall. This document outlines the girder assembly and alignment plan, including positional tolerances for various devices. The assembly techniques, device stand pre-alignment, and final alignment using CMM are discussed.

morind
Download Presentation

DOE Status Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DOE Status Review May 13-15, 2008 Girder Assembly And Alignment

  2. Girder Assembly and Alignment Goal is to assemble and precision align 4 devices on each production girder prior to final installation in the Undulator hall The document controlling the Girder Alignment Plan exists in the LCLS document library technical notes under LCLS-TN-08-3

  3. Girder Assembly Major girder assembly devices: • Quadrupole Magnet • Beam Finder Wire • Undulator Beam Vacuum Tube • Beam Position Monitor

  4. Girder Assembly

  5. Girder Assembly

  6. Girder Assembly

  7. Girder Assembly

  8. Girder Assembly and Alignment Device positional tolerances: • X direction +/- 60 microns • Y direction +/- 40 microns • Z direction +/-500 microns These tolerances are for the BPM, BFW, Quad, and Undulator magnets

  9. Girder Assembly and Alignment Device positional tolerances for Undulator beam pipe are: • X direction +/- 50 microns • Y direction +/- 40 microns • X straightness +/- 200 microns • Y straightness +/- 100 microns

  10. Girder Assembly and Alignment • Assembly Techniques • Device stand pre-alignment on multiple CMM’s • ZX position pre-alignment girder tooling • Undulator beam tube straightening

  11. Girder Assembly

  12. Girder Device Alignment

  13. Girder Device Alignment

  14. Girder Device Alignment

  15. CMM Final Alignment • Leitz CMM utilized for final adjustments and device location verification • All undulator translation slide stops, both electronic and hard, are set, tested, and verified prior to moving an undulator on to the girder assembly • All girder assemblies to have the undulator fit over vacuum chamber while on the CMM • Girders are now RFI

  16. CMM Final Alignment

More Related