1 / 27

Solar Neutrino at KamLAND

Solar Neutrino at KamLAND. Sei Yoshida Reserch Center for Neutrino Science, Tohoku Univ. for the KamLAND Collaboration. Reactor Neutrino. Solar Neutrino. KamLAND. Geo-neutrino. KamLAND Experiment.

more
Download Presentation

Solar Neutrino at KamLAND

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Solar Neutrino at KamLAND Sei Yoshida Reserch Center for Neutrino Science, Tohoku Univ. for the KamLAND Collaboration LAUNCH Workshop @ MPI, Heiderberg

  2. Reactor Neutrino Solar Neutrino KamLAND Geo-neutrino KamLAND Experiment • Confirmed oscillation of reactor anti-neutrino, firstly detected anti-neutrino from the earth. • Next step,  7Be solar neutrino detection LAUNCH Workshop @ MPI, Heiderberg

  3. 1 kt Liquid Scintillator PMTs KamLAND Detector KamLAND Detector • Kamiokamine overburden : 2700m.w.e. Muon rate : 0.34Hz • 1000 tons of Liquid Scintillator • Mineral Oil : Buffer against external BG • 1979 PMTs(17” 1325 + 20” 554) • Photocathod caverage : 34% • Outer water Cherenkov detector for muon veto LAUNCH Workshop @ MPI, Heiderberg

  4. Solar Neutrino Detection • Anti-neutrino detection Neutrino detection Delayed coincidence signature Single unspecific signature Small Background High level of Background LAUNCH Workshop @ MPI, Heiderberg

  5. Internal Background of KamLAND At present • Single energy spectrum observed in KamLAND • 4 m fiducial volume cut to suppress 40K and 208Tl external BG • What is remeined background in single energy spectrum? LAUNCH Workshop @ MPI, Heiderberg

  6. Internal Background of KamLAND • Main sources of background in the range of 7Be neutrino • 210Pb( 210Bi  210Po )  by distillation • 85Kr  by N2 purging LAUNCH Workshop @ MPI, Heiderberg

  7. Required Reduction by Purification 222Rn 3.8 d < 1mBq/m3 LAUNCH Workshop @ MPI, Heiderberg

  8. R&D Study for Distillation • Achievement Impurity Reduction • 210Pb ~7×10-5 • 40K > 4×10-2 • 85Kr ~1×10-6 • 39Ar ~1×10-6 Almost acheived required level Test Apparatus @ Tohoku Univ. LAUNCH Workshop @ MPI, Heiderberg

  9. Expected Spectrum after Purification 210Pb :7.7×10-5 40K :3.8×10-285Kr :1.0×10-6 39Ar :1.0×10-6 11C LAUNCH Workshop @ MPI, Heiderberg

  10. New Purification System • Construction finished • Test operation to tune up parameters LAUNCH Workshop @ MPI, Heiderberg

  11. Concept of New Purification System Distillation System N2 Purge Towers N2 Generator LAUNCH Workshop @ MPI, Heiderberg

  12. Distillation System • Liquid scintillator(LS) is fed into small buffer tank (2m3)from KamLAND. • Different boiling point LAUNCH Workshop @ MPI, Heiderberg

  13. Distillation System (PC tower) • Pseudocumene(PC) is distilled firstly • Operating pressure 2kPa. • Boiling point ~ 60℃ • Rest at the bottom of PC tower  Dodecane + PPO •  send to next tower LAUNCH Workshop @ MPI, Heiderberg

  14. Distillation System (NP tower) • Dodecane(NP) is distilled secondly. • Operating pressure ~2kPa. • Boiling point ~ 100℃ • Rest at the bottom of NP tower  Dodecane + PPO(little concentrated) •  send to PPO concentrator (~140℃ under 2kPa), NP is evaporated back to NP tower. LAUNCH Workshop @ MPI, Heiderberg

  15. Distillation System (PPO tower) • PPO is distilled finally. • Operating pressure ~0.6 kPa. • Boiling point ~ 190℃ • Rest at the bottom of PPO tower  Exhaust LAUNCH Workshop @ MPI, Heiderberg

  16. Distillation System (Mixture tank) • LS is mixed(blended) withdistilled PC,NP, and PPO. • Temperature senser and Density meter • PC and NP mixture is adjusted by pre-small tank. • PPO is mixed with PC ~ 10 wt%, then fed into mixture tank. LAUNCH Workshop @ MPI, Heiderberg

  17. Distillation System (Purge towers) • Purging by pure N2 gas • Operating pressure ~ 40 kPa • N2 flow rate 30 ~ 35 Nm3/h • Series of “Gas – Liq. Mixer”, and “Gas-Liq. Separator” LAUNCH Workshop @ MPI, Heiderberg

  18. N2 Generator • Newly developed/constructed N2 generator • Supply air : Rn less air from outside of mine • N2 supply capacity : 40 Nm3/h Emergency 5 Nm3/h • Purity • Ar 0.02 ~ 0.03ppm (measured) • Kr ~10-15 (not measured yet) • 222Rn ~ 5mBq/m3 (measured at purif. Area) LAUNCH Workshop @ MPI, Heiderberg

  19. Monitoring Quality Background Reduction • Reduction factors for 210Pb and 40K will be monitored by KamLAND • The data will be continuously taken during purification. • Rn concentration in purified LS • Delayed coincidence of Bi-Po  miniLAND • Electrostatic collection method after trapping • Reduction factor of 85Kr • The system is now tuning. Optical property • Attenuation length after distillation • Light output LAUNCH Workshop @ MPI, Heiderberg

  20. Monitoring Rn Concentration –miniLAND-- • miniLAND ; miniture version of KamLAND • 0.4m3 of acrylic container ( 4×4 cells) • NaI solution as light guide to shield radiation from PMTs • Pb shield of 15 cm in thickness • Borated PE of 5 cm in thickness • Measuring Rn concentration by Bi-Po delayed coincidence • Sensitivity < 1 mBq/m3 • It can also monitor, • Light output • Attenuation length • System is now ready LAUNCH Workshop @ MPI, Heiderberg

  21. Rn Measurement System LAUNCH Workshop @ MPI, Heiderberg

  22. KamLAND Purification Area Rn Concentration in N2 Gas • Piping line between purification area and N2 generator, ~100m • Rn emanation  consistent with designed value ~ 5mBq/m3 LAUNCH Workshop @ MPI, Heiderberg

  23. Monitoring Attenuation Length • Light beam is collimated onto different wavelength filters. • For each of 21 different liquid heights along the 1 m long Stainless Steel tube (which is coated to minimize scattering) we take the following measurements: • PMT Dark current, measured by using a plug in the filter wheel • Beam intensity using photo-diode • PMT current for each wavelength filter (10 filters from 313 -550 nm) • Height is measured by differential pressure gauge and is calibrated for different liquid densities. LAUNCH Workshop @ MPI, Heiderberg

  24. Results for Purified LS (MO/PC/PPO) • We can already make LS by distilled PC/NP/PPO. • No significant deterioration for attenuation length • Compareing att. length before and after distillation LAUNCH Workshop @ MPI, Heiderberg

  25. Present Status of Purification • Pseudocumene and Dodecane are successfully and stably distillated for a period longer than a month. • PPO tower operates as expected, however, stable/continuous operation has not been achieved yet. • Complete operation of full system will be tested soon, probably within a month. • Quality of purified(distilled and purged) scintillator were measured, no detectable impurities/deterioration has been measured/observed. LAUNCH Workshop @ MPI, Heiderberg

  26. Purification Schedule • Recirculation test (soon, within a month) • Recirculate small amount of LS into KamLAND to test this process without any purification process. • After stable PPO tower operation ( probably within one or two months), recirculation distillated LS into KamLAND using the online distillation system • To test recirculation process comletely • To check the quality of distilled LS further, recirculate ~50m3 of distilled LS into KamLAND • Regular distillation process, but ….. • Full volume replacement will require ~ two months. • Unfortunately, there is a time constraint because of scheduled blaster in the mine to install new XMASS facility.(very clese to new purification site). • Previously, we requested a delay to the end of March 2007. • We are now negotiating further delay in blasting activity. LAUNCH Workshop @ MPI, Heiderberg

  27. Summary • LS purification system was constructed. • Part of operation is successfully running. • Monitoring system of LS Quality after purification is almost ready. • There is a time constraint. LAUNCH Workshop @ MPI, Heiderberg

More Related