New calibration strategy – follow-up from the production review

New calibration strategy – follow-up from the production review. ALICE Offline 07/02/2011. GSI proposal. Slide courtesy of Silvia Masciocchi. Assumptions. Weekly AliRoot updates (Rev + AN tag) All PWGx + AOD filtering trains run in synch Weekly OCDB updates (in addition to Pass0)

monifa
Download Presentation

New calibration strategy – follow-up from the production review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. New calibration strategy – follow-up from the production review ALICE Offline 07/02/2011

  2. GSI proposal Slide courtesy of Silvia Masciocchi

  3. Assumptions • Weekly AliRoot updates (Rev + AN tag) • All PWGx + AOD filtering trains run in synch • Weekly OCDB updates (in addition to Pass0) • n=4 calibration passes until ready for Pass2 • period length = 4 weeks • Reconstructed sample = 10% of full sample • If period + calibration passes not sufficient, the shema can be extended

  4. Calibration passes – one period CPass #1 CPass #2 End of period Ready for Pass #2 CPass #3 Cpass #4 (full 10% cycle) CPass #5 (full 10% cycle) CPass #6 (full 10% cycle) CPass #7 (full 10% cycle) 1 2 3 4 5 6 7 Week #

  5. Repartition of Cpass #x PWG2 Analysis train AOD train + tender PWG3 Analysis train Pass0 reco Pass0 Calib train + OCDB update Cpass #x reco PWG4 Analysis train PWG1 QA train Muon AOD train • In total: • 2 reco passes • 2 calib train passes • 6 PWG+AOD trains Ready Cpass #x Calib train + OCDB update Not automatic TBD

  6. Summary of period pass • Total data volume – 55% of RAW • Calibration (post Cpass #x) to be discussed • What will be updated here? • What is the required ouptut of CPass #x to allow for calibration • Which detectors can join • AOD and PWG#2, 3, 4 trains must run at the same time • Strict discipline in the train code