An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 6 Sigma FAST & EASY MACHINE SETUPPROJECT(SIMPLY EXCHANGE OF FİXTURE-SEF ) & PILOTAPPLICATION OF 4 AX MILLING MACHINE

  2. PROJECT SUMMARY 6 Sigma Project Y Project Description Project Objectives/Goals Customer/GE Benefits Financial Benefits Y Owner MBB/BB - PRODUCTION SEF-Simply Exchange of Fixture and Pilot Application on 4 Axis Machine Production Flexibility and Decrease Setup Time • Reduced cycle time/improve capacity

  3. MMEASURE ANALYZE IMPROVE CONTROL Project Title: Create an order to get tool, fixture, gage, and cnc program in digitam system Project ID#: - Six Sigma Project Status Status as of: Measure-Analyze Expected Completion Date: Project Leader: Y Owner: Project Y: PRODUCTIVITY Financial Benefits: Team Members Project Statement & Benefits NameFunction 1- 2- 3- 4- 5- 6- 7- 8- BLACK BELT BLACK BELT SUPR.TOOL GREENBELT GREENBELT SUPERVISOR . SUPERVISOR TOOL STOCKKEEPER • Scope: • Goals & Objectives: Flexibility on production Decrease Setup Times • Benefits: Reduced cycle time / Improve capacity Status Next Steps • Accomplishments: Data gathering, fixture and Machine • Tools applied: • Significant findings: • Next steps: • Additional tool to be applied: Design system & • Help needed: Yes

  4. CTQ’s - Defect - Target 6 Sigma CTQ HIGH SET-UP TIME, NONFLEXIBLE SETUP Defect STANDARDISATION Target 25% DECREASE OF S/U TIME & MORE FLEXIBILITY

  5. 6 Sigma TABLE-1 MACHINE-FİXTURE & OPERATION DATAS

  6. 6 Sigma

  7. OPERATION & S/U TIME RELATIONSHIP 6 Sigma

  8. CAUSE AND EFFECT FASTENİNG MAT’L CARELESSNESS STANDARDIZATION FLEXIBLE CHANGING SHIFT FIXTURE CHIP CLEAN METHODS EQUIPMENT 6 Sigma OPERATOR TRAINING High S/U Hours

  9. WHY 4 AXIS MACHINE 6 Sigma • Capability of Holding up to 25” tools • Rotating Table & Machine Course • There is only one Milling Machine With this spesifications • Heavy & Large Fıxtures, • Because of small lot size Frequent Set-up Changıng, req. b GENERAL VIEW OF THE 4 AX MILLING MACHINE

  10. 6 Sigma • Flexible Set-up Requırements, Geometric Differencies of the Fixtures • Group Technology Appl. diffuculties DIFFERENT VIEWS FOR 4 AX MACHINE

  11. 6 Sigma • Due to 4 Axıs Milling Machıne Applıcatıon Results Wıll be Affected of Other Vertical-Horizontal and Multiple Axis Milling Machine Flexıbılıty Studıes... For This Reason ; 4 axis Milling Machine were Selected to the Pilot Applicatıon.

  12. FLOWCHART FOR SETUP 6 Sigma Fixture Handling from SRS Fixture Cleaning To the Machine Machine Placement T nut, Fastener Finding Setup Control Internal S/U Part positioning Fixture Fastening Part Handling External S/U

  13. 6 Sigma • WHY THE TIME IS INCREASING? • Dimensions and weights of the fixture • Fix. Geometries haven’t standart Shapes • Nonstandart Pın and Bolts slots & Holes • Used Nonstandart Bolts • Rotary Table Properties, • Parts have different Datum Systems (Point ,area etc.)For this reason, there are very complex shape fixtures, • Expanding fixtures • T-Nut and Fastening Elements Problems - Look for elements, Time requıred

  14. Workıng Procedures 6 Sigma • All Fixtures were layed out on Machine Rotary Table With Sub Plate. For this Reason Subplate Will be Designed & positioned with Pin-Bushing systems & Fastened to the fixture with Bolt-Nut As a Basement of Work;Fixtures will be fastened on machine as little as possible, No need positıonıng Fixtures and Machine datas are available; (Table-1)

  15. Workıng Procedures and troubles 6 Sigma Big Dimensions & Geometric Differencies and Datum Systems properties of Fixtures will be Controlled on Real/Right places Expanding Fixtures are some different Applications Requıred, Due to Set up reduction time works; • T-Nuts on the rotary table, • -Bolts,Nuts Eye bolts will be placed near of the Machine • These type of problems are caused increasing for Setup Times.

  16. 6 Sigma FIXTURES GENERAL VIEW OF FIXTURES

  17. 6 Sigma Workıng Procedures We are working on the; - Innovatıve and İmproved best Concepts Linear Bushing Systems One of the most important and innovative Equıpment are researching for Cleaning on the Machine Rotary Table Chips penetrated on the table, T-Nut channels, bolt holes and the other slots and holes. İnnovative cleaning, New easy cleaning Facility and Equıpments or; Chips may be holded without dropping These are researching for new innovation...

  18. 6 Sigma ROTARY TABLE and FİXTURE LAYOUT ON THE TABLE ROTARY TABLE and 5 DIFFERENT PARTS FIXTURES ON THE TABLE

  19. M39 Fixturing & Sub Plate section View 6 Sigma

  20. 6 Sigma M39 Fixture & Sub Plate Assy. AĞIRLIKLAR; FİKSTÜR;780 kg ALT TABLA; 289 kg.

  21. 6 Sigma General View for Sub Plate

  22. General View of SubPlate 6 Sigma GGG 60

  23. 6 Sigma LINEAR BUSHING SYSTEMS

  24. 6 Sigma

  25. procedure 6 Sigma • Machine datas, • Rotary table • Course • T NUT ChannelI • Fixturing Datas • Geometry & Dimensions • Holes • Fixturing systems (EXP, Datum systems etc.). • Define SEF systems • Designing Subplate • Pın-bushing Systems Selectıon • Design Pin-Bushing position of subplate-Fix. Assy • Define Positıon and Tolerances • Sub Plate properties • Weight • Sub plate Strength Calculatıon • Pin-Bushing stress analysis • Fixture Pin & Nut Stress Analysis • Sub Plate -Rotary Table Fastening Method. • T-Nut Channels • Sub plate/Rotary Table Assy Design

  26. Materials 6 Sigma SubPlate Material: GGG 60 - Spheroidal Cast Iron Weight; 285 Kg. TOTAL Max Load on Rotary Table; 1070Kg.

  27. 6 Sigma Important Issues • Subplate Dimensions and Position Tolerances (.0000-.0015) • Pın-Bushing Application and Fixtures thickness Differencies,For this reason Pin-bushing Position, • If using linear Bushing Systems, Big and heavy Fixtures will be damaged on roller Bushing. For this reason radial and axial loads and stress will be defined. • Subplate -fixture fasteners like Bolt, Nut, Pin, eye bolt stress analysis required

  28. SAVING • ALL PARTS HAVE 20 S/U /YEAR • MİN %25 SAVING • 30 HRS FOR M61 PARTS • 20 HRS FOR M39 PARTS • 20 HRS FOR M37 PARTS • 20 HRS FOR M52 PARTS • 16 HRS FOR L44815G01 PARTS • TOTALLY 100 HRS/YEAR FOR 4 AXIS MACHINE • 106*18=1908$ • FLEXIBLE SETUP AND OPERATOR SAVING • RELAX SETUP • APPROX % 50 SAVING FOR POSITIONING; NO NEED USE CLAMP, T-NUT etc. 5$ *25=125$ • OPERATOR ASSURANCE, SAFETY AND EASY SETUP

  29. 6 Sigma PROGRAM PLAN

  30. Six Sigma Project Scorecard 6 Sigma Improve Measure Control Analyze Understand Environment - Meet business leader - Establish key contacts - Tour process - Identify process owner - Identify team members Review Measure Phase - Champion comments - Update team / stakeholders Review Analyze Phase - Champion comments - Update team / stakeholders Review Improve Phase - Champion comments - Update team / stakeholders 10% Train Team on 6 sigma tools Train Team on 6 sigma tools Train Team on 6 sigma tools Issue Revised QCWIs / procedures where applicable Define Performance Objective for “Y” Review process map Develop new process flow 20% Bound the Project Revalidate Cause & Effect of X’s to Achieve Y’s Process Map Identify Variation Sources Screen Potential Causes Identify Root Causes of variation Train Team on 6 sigma tools 30% Create Product Tree Determine Process Capability Identify X’s - Cause & Effect Diagram Identify Customer Requirements - CTQ’s via QFD - Identify additional data Needs Implement Control System for Process Fixes Establish Operating Tolerances 40% Benchmark similar products and processes Identify Improvement Actions and Implementation Plan Identify Follow-up Action Plan and Individuals Responsible Create Process Map Coordinate with ITS for systems resources where applicable 50% Analyze Data - Apply Statistical Tools - Hypothesis Tests Develop Risk Assessment Risk Abatement Plan Identify Opportunities for Standardization Define performance standards - Gather / Pareto data - Review Historical data Obtain buy-in / support for improvement actions List Best Practices and Identify Lessons Learned 60% Define additional data needs Implement Improvements - - Identify opportunities to leverage improvements Develop Presentation - Review Team / MBB / Sponsor - Present results to Champions and Operational Leaders Evaluate measurement system - Gage R&R 70% Hand off project to Process Owner Collect & analyze data to validate improvement Establish Product Capability - Calculate DPU - Calculate Z st and Zlt 80% Develop Presentation - Review Team / MBB / Sponsor - Present results to Champions and Operational Leaders Communicate Improvements Develop Presentation - Review Team / MBB / Sponsor - Present results to Champions and Operational Leaders Develop Presentation - Review Team / MBB / Sponsor - Present results to Champions and Operational Leaders 90% Monitor process performance 100%