60 likes | 151 Views
Updated clearance information for beam extractions and passes at reference -80.6m. Details for Upstream and Downstream YA entrances and exits with mm adjustments. Ensure accurate beam adjustments for optimal performance.
E N D
YA Clearances Updated 6 Aug 2008
Pass 3 Upstream YA Entrance Extracted beam 9.82 mm to reference -80.6 m Recirc beam 6.12 mm to reference -80.6 m
Pass 3 Upstream YA Exit Extracted beam 9.38 mm to reference -80.6 m Recirc beam 6.12 mm to reference -80.6 m
Pass 3 Downstream YA Entrance Extracted beam 9.45 mm to reference -80.6 m Recirc beam 6.12 mm to reference -80.6 m
Pass 3 Downstream YA Exit Recirc beam 6.12 mm to reference -80.6 m Extracted beam 9.97 mm to reference -80.6 m