mimis
Uploaded by
7 SLIDES
143 VIEWS
70LIKES

Other Protocols: Progress Report

DESCRIPTION

Other Protocols: Progress Report. Riparian Vegetation Split: Arid Land Springs & Selected Large Springs. Vegetation patches associated with springs, oases, and seeps. Little Arizona, PARA. Salsberry Spring, DEVA. Other Protocols: Progress Report. Riparian Vegetation

1 / 7

Download Presentation

Other Protocols: Progress Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Other Protocols: Progress Report • Riparian Vegetation • Split: Arid Land Springs & Selected Large Springs

  2. Vegetation patches associated with springs, oases, and seeps Little Arizona, PARA SalsberrySpring, DEVA

  3. Other Protocols: Progress Report • Riparian Vegetation • Split: Arid Land Springs & Selected Large Springs • Recruiting Cooperator (s) to lead • Resume 2013 • Invasive Species – Early Detection • UNLV – continue on Invasive Species Field Guide • Awaiting the approval of the no-cost extension • Recruiting Cooperator to lead • Resume 2013

More Related