An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. 2012 Planned Facilities Reconstruction Project

    2. Planned Facilities Reconstruction Health & Life Safety Energy Conservation & Management Security Upgrades Reconstruction Sitework

    3. Why Do We Need A Capital Project? State Education Department Requirements Manual Of Planning Standards NYS Building Codes Fire Inspections (Annual) Visual Inspections (Annual) Building Condition Survey (5 Year) 5 Year Capital Plan NYCRR Part 155 Regulations of Commissioner The School District is Required to Maintain the Buildings and Grounds to Certain Standards to Provide a Healthy & Safe Learning Environment

    5. All District Buildings Public Address/Clock System -Systems are currently serviced by different vendors -MHS is currently functioning on two separate schedules Stone Joint Replacement Parking Lot Repair

    6. Middle/High School & Fenner Elementary

    7. Temple Elementary

    8. Middle/High School Terrazzo Reconstruction (1935) Asbestos Floor Tile Removal (1967) Ceramic Tile Replacement (1967) Stair Tread Replacement Exhaust Fan Replacement (1967) Upgrade Security Entrance Access

    9. Fenner Elementary Replace Roof (1989) Replace Interior Gym Doors Replace Interior Door Hardware (1989) Replace Boiler & Water Heater Upgrade HVAC Controls Upgrade Security System Repair Sidewalks

    10. Temple Elementary Upgrade Security System Replace Exhaust Fans Repair Sidewalk

    11. Bus Garage Add Heat Detection Upgrade Fire Alarm System Masonry Repair

    12. Project Budget MIDDLE/ HIGH SCHOOL $1,513,000 FENNER ELEMENTARY $ 907,000 TEMPLE ELEMENTARY $ 221,000 BUS GARAGE $ 59,000 Total Budget $2,700,000

    14. Questions or Comments?