Renewable Energy Transmission Task Force (RTTF) . RTTF Chairman: Peter Krzykos November 3 2009. Overview. Past Meetings 5/12/2009 – Created three transmission maps 5/20/2009 – Created a single transmission map. Single Transmission map with Mileage and estimated costs Queue Update

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Renewable Energy Transmission Task Force (RTTF)' - miller


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
Renewable energy transmission task force rttf

Renewable Energy Transmission Task Force(RTTF)

RTTF Chairman:

Peter Krzykos

November 3 2009


Overview
Overview

  • Past Meetings

    • 5/12/2009 – Created three transmission maps

    • 5/20/2009 – Created a single transmission map.

  • Single Transmission map with Mileage and estimated costs

  • Queue Update

  • BTA Process

  • Next Steps


Past meetings 2009
Past Meetings 2009

  • Two meetings conducted (May 12th and 22nd)

  • May 12th meeting

    • Attended by ~40 utility, developer, and agency representatives

    • Divided into three groups to develop state-wide renewable transmission options based on ARRTIS data, interconnection requests, etc.

  • May 22nd meeting

    • Assimilated options into a single set of potential renewable transmission corridors

    • Discussed next steps/technical flow studies, etc.



Segment mileage and estimated cost
Segment Mileage and Estimated Cost

  • WGA WREZ model used for construction and right of way costs.

  • Construction cost: $1.8 Million per mile

  • Right of Way cost: $0.23 Million per mile











Bta utility evaluation process
BTA-Utility Evaluation Process

Individual Utility Evaluation of Renewable Resource and Transmission Options

  • Example Inputs to Economic Evaluation:

    • Resource Cost

    • Water Availability

    • Resource Capacity Available

    • Capacity & Energy Benefits

    • Transmission Cost

    • Timing

Utility Coordination & Common Projects Identification

  • Policy Issues:

  • Funding Mechanisms

  • Cost Recovery

  • Siting Constraints

  • Export Markets

File “Top 3” along with plans and funding mechanisms (Due 10/31/09)

RTTF Group Work

RTTF Finance Group Work

Input from Workshops

RTTF ARRTIS Group Work

2008 BTA Order 70635

2006 BTA Order 69389


Bta utility evaluation process1
BTA-Utility Evaluation Process

Individual Utility Evaluation of Renewable Resource and Transmission Options

  • Example Inputs to Economic Evaluation:

    • Resource Cost

    • Water Availability

    • Resource Capacity Available

    • Capacity & Energy Benefits

    • Transmission Cost

    • Timing

Utility Coordination & Common Projects Identification

  • Policy Issues:

  • Funding Mechanisms

  • Cost Recovery

  • Siting Constraints

  • Export Markets

File “Top 3” along with plans and funding mechanisms (Due 10/31/09)

Currently in these phases

RTTF Group Work

RTTF Finance Group Work

Input from Workshops

RTTF ARRTIS Group Work

2008 BTA Order 70635

2006 BTA Order 69389


Next steps
Next Steps

  • No later than October 31st – Utilities will present their projects to the ACC.

  • RTTF will develop study plan to

    evaluate reliability of Arizona transmission system based on proposed projects to the ACC.


October filing
October Filing

  • APS took into consideration the input from the two workshops, the ARRTIS’s work, the Finance Subcommittee's work, and RTTF’s work.

  • Based upon its analyses ,APS identified the three RTPs ;


October filing1
October Filing

  • A. Delaney to Palo Verde 500kV line

  • B. Palo Verde to North Gila 500kV #2

  • C. Palo Verde to Liberty and Gila Bend to Liberty

  • D.Additionaly, APS included the Delaney to Blythe project

    (Arizona Portion of DeversII)