A Summary of W-7X Pulse Schedule Editor Proposals

A Summary of W-7X Pulse Schedule Editor Proposals. J.G.Krom 2009-07-29. Reading List. Editor - ScenarioSpec 1-HXA0-T0048 HiLevelParameterMotivation 1-HXG1-T0007 Scenario Editor Talk 1-HXA0-T0045 EditorUseCases_2006 1-HXA0-T0050 ExperimentVorbereitungGesamt 1-HXA0-T0047

milek
Download Presentation

A Summary of W-7X Pulse Schedule Editor Proposals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Summary of W-7X Pulse Schedule Editor Proposals J.G.Krom 2009-07-29

  2. Reading List • Editor - ScenarioSpec 1-HXA0-T0048 • HiLevelParameterMotivation 1-HXG1-T0007 • Scenario Editor Talk 1-HXA0-T0045 • EditorUseCases_2006 1-HXA0-T0050 • ExperimentVorbereitungGesamt 1-HXA0-T0047 • ExperimentProgramm_Temporal 1-HXA0-T0046 • ExperimentProgramm_Temporal 1-HXA0-T0052 • Architektur Editorentwicklung 1-HXA0-T0049 • Editor Spezifikation 1-HXA0-T0051 • Editor_Spezifikation_short03.doc 1-HXG1-T0000 • Konzept zur Organisation der Experimentbetriebsphasen im Projekt W7-X1-DBB21EA101-T0008.0 • Konzept zur Planung von segmentgesteuerten Experimenten imSteuerungsprojket W7-X 1-DBB21EA101-T0007 • Workflows for experiment planning and experiment processing at W7-X 1-DBB21EA101-Y0004.0 • Konzept der Organisation der Experimentbetriebsphasen 1-DBB21EA101-Y0003.n • Konzept zur Planung von Experimenten im Projekt W7-X 1-DBB21EA101-Y0005  130 pages text, similar number of slides. Please summarize in 2 × 3 slides

  3. Main proposals for the design of a W-7X Pulse Schedule Editor • Formal-design orientated approach “ScenarioEditing” • Implementation orientated description “SegProgBox” Not discussed: • High Level Parameters • Administrative handling of experiment proposals

  4. Scenario processing & experiment programs F Experiment scenario 2 Scenario presentations: 1-HXA0-T0048; 11.03.09 - CoDaC: Editor_ScenarioSpec_2009Mar_1.ppt 1-HXG1-T0007; 22.11.07 – XDV/W7XC: HiLevel_Parameter_Motivation.ppt 1-HXA0-T0045; 12.03.07 – W7X-Sem: Editor_ScenarioSpec_2007Feb_2.ppt 1-HXA0-T0050; 23.11.06 – XDV: EditorUseCases_2006.ppt 1 F Dependencies Ranking of resolution Restriction of F-parameter ranges F segmentation Entry F Component scenario Experiment program: 1-HXA0-T0047; 24.10.2006 - Experiment_Vorbereitung_Gesamt.doc 1-HXA0-T0046; 21.06.06 - CoDaC: ExperimentProgramm_Temporal_2006Jun.ppt Restriction of T-parameter ranges Time domain restrictions T segmentation T Dependencies 4 3 Editor development: 1-HXA0-T0049; 14.04.09 - CoDaC: Architektur_Editorentwicklung.ppt 1-HXA0-T0051; 16.10.2003 – XDV: EditorUseCase_Seg3.ppt 1-HXG1-T0000; 24.06.2003 – XDV/W7XC: Editor_Spezifikation_short03.doc T component segment sequence 13-Sep-14 G. Kühner G. Kühner 4

  5. SZENARIO :: name → { ( name,attriba,t1,t2)k, ...} attriba :: Amplitude, if, {pi} if :: f(t, {pi}) - stetig! t1,t2:: Zeitintervall für attribaggf. mit synchbed. k :: beliebige Detaillierung! Definition: Szenario – new – B(r) ECRH NBI ICRH n_e*l ECE Thoms ... 2.5; 0.98 2003 2006,2009 B0 x x x ECRH: 140GHz synch-Bed. NBI H0 D0 <ne> GGas Regler: Gas ~ D <ne> ne < n1 0 0.5 1.0 s 1.5 2.0 Prädikat Interf_1 t 13-Sep-14 G. Kühner G. Kühner 5

  6. Parameter-Abstraktionsschichten abstrakte Welt (Application Domain) 1 a F-Abhängigkeiten b 3 T- Einschränkungen 2 4 Komponenten- HL-Parameter a b konkrete Welt CoDaClient CoDaClient CoDaClient FcsStation Modul-Parameter 13-Sep-14 G. Kühner G. Kühner 6

  7. Component Parameter Dependencies Dependencies: 1: |B| = 2pmc/e * f 2: fndl < 2pema(f/e)2 3: PEC > Prad . 1 2 Component HLP: B-field: BX [-3, +3]T a X [0.1, 0.4]m ECRH: f = 140GHz P X [0, 1]MW Gas: neX [0, 1021]m-3 Radiation: P X [0, 100]kW F-restricted component HLP: B-field: B X {- 2pmc/e * f, + 2pmc/e * f} a X [0.1, 0.4] ECRH: f = 140GHz P X [Pradmax, 1] Gas: neX [0, pem(f/e)2] Radiation: P X [0, 100] 13-Sep-14 G. Kühner G. Kühner 7

  8. Technical Parameter Dependencies Transformation: itor: B  Itor Itor: [-1MA, 0] U [0, 1MA] = Itor-U Itor+ ∂Itor/∂t < 20 A/s; granularity; B+ = dom ( itor  Itor+) B- = dom ( itor  Itor-) F-Restricted component HLP: B-field: B X {- 2pmc/e * f, + 2pmc/e * f} ECRH: f = 140 P X [Pradmax, 1] Gas: neX [0, pem(f/e)2] Radiation: P X [0, 100] 3 T-restricted Component HLP: 4 B-field: B+X {+ 2pmc/e * f} ECRH: f = 140 P X [Pradmax, 1] Gas: neX [0, 1021] Rad: P X [0, 100] B-field: B-X {- 2pmc/e * f} ECRH: f = 140 P X [Pradmax, 1] Gas: neX [0, 1021] Rad: P X [0, 100] U 13-Sep-14 G. Kühner G. Kühner 8

  9. Segmentierung B0 ECRH: 140GHz synch-Bed. NBI H0 D0 <ne> GGas Regler: Gas ~ D <ne> ne < n1 Interf_1 Prädikat t 13-Sep-14 13-Sep-14 G. Kühner G. Kühner 9

  10. Design orientated approach + Formal (Mathematical & UML) approach + Potentially automatic processing. + Clear separation of concern between “physics” and “technics”. + Sharp definition of concepts.

  11. Main proposals for the design of a W-7X Pulse Schedule Editor 2. Implementation orientated description

  12. Beispiel: Standardentladung an WEGA • Zeitverlauf ausgewählter Parameter für den Ablauf des Beispielexperiment WEGA Std#1, • Definition des Experimentablaufs, 12 Jörg Schacht: WEGA WEEK, 4. Dez. 2008 Jörg Schacht: WEGA WEEK, 4. Dez. 2008

  13. Beispiel: Standardentladung an WEGA Editieren der High Level Parameter der SegProgBox für das Magnetfeld 13 Jörg Schacht: WEGA WEEK, 4. Dez. 2008 Jörg Schacht: WEGA WEEK, 4. Dez. 2008

  14. Aufbau SegProgBox Aufbau einer Segment Program Box(SegProgBox):  Segment Trace (= Zeitspur einer Komponente) Segmente (HLPGroups) Bedingungen/Abhängigkeiten 14 Jörg Schacht: WEGA WEEK, 4. Dez. 2008 Jörg Schacht: WEGA WEEK, 4. Dez. 2008

  15. Aufbau SegProgBox SegProgBox parameters: Conditions 15 Jörg Schacht: WEGA WEEK, 4. Dez. 2008 Jörg Schacht: WEGA WEEK, 4. Dez. 2008

  16. Beispiel: Standardentladung an WEGA Automatisches Erzeugen der Segmente für die zentrale Segmentablaufsteuerung, Projektsegmente können dann gebildet werden und das Programm kann als Szenario abgespeichert werden 16 Jörg Schacht: WEGA WEEK, 4. Dez. 2008 Jörg Schacht: WEGA WEEK, 4. Dez. 2008

  17. Implementation orientated description + Descriptive / Textual / Graphical spec. + Wide scope + from committees in the early phases + to actual executable program in the end + Pragmatic approach.

  18. Differences (1) • Several non-essential differences. • Inconsistent Names No (or very few) essential differences!

  19. Differences (2) Calculation of executable program: • Shortly before use, “on the fly”.Based on by the experimentalistrequired scenario. • Long before use. The experimentalist builds a scenariofrom pre-validated “Lego bricks”.