An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of NA62 straw electronics Webs Covers Services Readout

  2. Webs • Production approaching the end • Few problems with cut lines on flexible part • Discovered with noise_scan program when mounted on the detector • Special test bench for this problem was discussed at the beginning but deemed not needed • Probably not justified for few cases • Current test bench proved to be very efficient to discover majority of the problems

  3. COVER • Full production arriveddelayed and damaged • FedEx subcontracted the delivery to CERN • Test all boards ASAP to know the yield and possible problems • 20 left to test • 1 damaged mechanically • 10 did not pass the test

  4. COVER • Keep covers in place when installed on the detector • 2 modules completely installed • Tested with final LV patch panels • Few bad straw wires and web connections discovered during tests • Remote programming • Firmware version 10 bugs for remote programming • Firmware version 11 • Remote pgm now works • Fixed bug in multi-edge bit • Improved timing for DAC read-back

  5. SERVICES • Patch panels and on-detector cabling (Johan) • Dense but feasible • LV and HV cover cables with different lengths • All LV and HV cables ordered with timed delivery • RJ45 needs careful planning • How many different lengths? • Storage behind rack ~1 meter • Wait for chamber installed in the pit? • UK company ready to produce batches of different lengths

  6. SERVICES • Patch panels LV and HV • HV ordered at CERN • Modification with copper GND plate instead od aluminium • LV tested completely by Johan • DCS control in advanced state • Still open • External temperature sensors • Humidity measurement ? • LV production tight • Organized by TE-MPE group • Fast PCB production • Components for assembly prepared • Total time ~6 weeks • ½ March at CERN • Johan to organize the test

  7. SERVICES • MPOD ordered • … but order lost • Delivered to ELCOTRON • Missing in Wiener • End of January not possible • Now end of February • HV modules new production • Not on stock • Will deliver 8-channel HV modules • Swap with final when delivered • As soon as we receive our MPOD • We have to return mini-MPOD which we have used till now • Test power supply of 1 module/2 views (full chamber?) • Order the rest 3 MPODs, eventually 1 spare

  8. SRB • 2 FPGAs ready for schematics • Event manager • Frontend interface • Work is now focusing on vme and trigger • Changes in connectivity and data flow • Input FPGA FESRB • Added data/cmd direct links to vme_bm • For control and cover tests • Use of event_mgr unpractical • Delay of every cover clock line (16 lines) must be adjustable • Trying 2 solutions • Use FPGA feature • Specialized clock generation chips with 8 outputs

  9. SRB – components L0 PROCESSOR L0 LOOK_UP TABLE L0 OUT VME INTF ON-LINE MONITOR LEMO TTC TTCRx COVERS TIME REMAP WORK DATA TO PC FARM COVER CONTROL, DATA, SYNCH EVENT PROCESSOR 2(4)GB DDR3

  10. SRB – data flow VME 2.5 Gbit/s 16x2x320Mbit/s ~10Gbit/s 1.6 Gbit/s 2x Gbitethernet

  11. SRB • Schematics + PCB design • Feb-> March foreseen • Possible delay of 2 weeks • Prototype April/May