An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATLAS short term grid use-cases The “production” activities foreseen till mid-2001 and the tools to be used

  2. Status of ATLAS computing • Phase of very active s/w development (ATHENA OO framework, LHCb similarities) • Physics TDR completed > 1 year ago (old s/w) • HLT TDR postponed around end 2001 (new s/w chain availability) • No global ATLAS production going on now, but specific detector, trigger and physics studies are active, and willing to exploit and test GRID • TDR and Tile Testbeam Objy federations • B-Physics in Lund • Muon barrel trigger (INFN responsibility)

  3. uuuuuuuu

  4. Remote use of DB (Objy) • Master federation soon available at CERN with TDR runs • First Scenario: • A user request for a particular run triggers a check for its presence in the local federation. If it is not present, a grid- enabled transfer of the corresponding database from the CERN master federation is initiated. As in GDMP, the database must not only be transferred, but also appropriately attached to the local Objectivity federation. • Extension scenario: • The particular run may not yet be available in the master federation at CERN, either. A request for such a run migh trigger a job at CERN that first imports the Zebra version of the data into the master Objectivity federation, before proceeding as in the scenario above.

  5. Remote use of DB (Objy) • In May Testbeam data for Tile Calorimeter will be available • Remote subscriptions to data generated at CERN • A remote institution wishes to "subscribe" to the testbeam data, so that any new runs added to the master database at CERN are automatically replicated in a federation at a remote site that has subscribed to these data • Related and similar DB use-cases may be very naturally generated on these time-scales, however no resources are yet commited in ATLAS for this kind of effort

  6. Use-case: B-physics study • People involved: Lund University ATLAS group (Chafik Driouichi, Paula Eerola, Christina Zacharatou Jarlskog, Oxana Smirnova) • Process: BsJ/  , followed by J/ +– and  • Main background: inclusive bb J/ X • Needs sufficient CPU and storage space; so far CERN and Lund computers are used • Physics goal: estimate the  angle of the unitarity triangle • Main goal of this use-case: • identify weak points in Grid-like environment by direct experience and by comparing performance with modelling using the MONARC tools

  7. Generation • Event generator: Atgen-B • Signal: • one job generates 200 000 parton level events, which yields ~400 BsJ/  after Level 1 trigger cuts • job parameters: ~104 s CPU at a machine equivalent to 10 SpecINT95, 8 MB memory (max.), 10 MB swap (max.), 13 MB ZEBRA output • to simulate one day of LHC running at low luminosity:~1.4·103BsJ/  events ( Br(BsJ/ )=9 ·10-4 ) • Background: • estimated nr. of events per day: ~4·105 bb J/ X • Both signal and background to be stored (on tapes)

  8. Simulation • Detector simulation: Geant3 – Dice • Full detector simulation takes ~15 min CPU at a machine equivalent to 10 SpecINT95 per event • Only Inner Detector and Electromagnetic Calorimeter to be simulated • Majority of CPU time is spent on simulating the calorimeters

  9. Reconstruction and analysis • Reconstruction: • from the Athena framework (at the moment, AtRecon is used) • information from two sub-systems to be stored in the Combined Ntuple (CBNT) • Analysis: • estimation of the efficiencies of J/,  and Bs reconstruction • acceptance, resolution, tagging, errors on the sin(2) etc.

  10. Workplan • Define and understand the available Grid-configuration and environment (requires interaction with all counterparts) • Lund, CERN, NBI, Milan ... • Generation and simulation (signal and background) • test and compare different job submission configurations • compare with the modeling • Reconstruction, analysis

  11. Use-case: Barrel Muon Trigger Study • Main goals: • finalize the level-1 trigger logic in the barrel; • optimize the level-2 algorithms in the barrel region and study their possible extension to h > 1.; • evaluate the efficiencies of the different trigger levels (also combining muon and calorimetric triggers) for single muons and for relevant physics channels; • estimate the different background contributions to the trigger rate at various nominal thresholds; • study the effects of different layouts on system performances; • prototype (components of) distributed farms; • evaluate distributed computing models.

  12. Tasks • Simulation of single muons for system optimization: • ~108 events, ~3*109 SpecINT95*sec, ~500 GB disk space. • Generation and simulation of relevant physics channels with muons in the final state for different studies, wait for G4? (DataGrid release 1) • B0dJ/yK0s, B0dp+p-andB0dJ/yf for CP violation; • B0sD-sp+ for B0s mixing; • H 4l and pp Z mmfor alignment, calibration, overall performances; • B+J/y(mm)K+and B0dJ/y(mm)K*0for tagging control; • ~106 events, ~1010 SpecINT95*sec, ~1.5 TB disk space.

  13. Tasks (2) • Simulation of background: • simulate particle fluxes in the cavern; • ~105 events, 1010 SpecINT95*sec, ~1. TB disk space. • Production of ”complete” events, wait for GEANT4? • physics and background events are merged at hit and digit level; • ~106 events, 5*109 SpecINT95*sec. • Reconstruction, continuing till TDR • simulate level-1 trigger data processing; • apply level-2 reconstruction and selection algorithms; • ~108 events. • Analysis, continuing till TDR • study performances: efficiency, resolution, rates...

  14. Tools • Detector simulation: • GEANT3 based ATLAS simulation program (DICE) exists and works, GEANT4 coming by end 2001. • Background simulation: • FLUKA + GEANT3: particle fluxes integrated over detectors characteristic times. • Reconstruction: • trigger simulation programs running in conventional (ATrig) and OO (Athena) framework. • Analysis: • PAW, ROOT(?) .

  15. Workplan • Implement a Globus based distributed GRID architecture and perform increasingly complex operations: • submit event generation and simulation locally and remotely; • store events locally and remotely; • access remote data (e.g., background events, stored centrally); • (partially) duplicate event databases; • schedule job submission; • allocate resources: • monitor job execution; • optimize performances; • …

  16. Sites and Resources • Sites involved in the different activities: • simulation of physics events: Rome1, Rome2, Naples, Milan, CNAF, CERN; • background simulation: Rome1; • reconstruction and analysis: Rome1, Rome2, Naples, Milan; • HLT prototyping: Rome1, Pavia, Rome3 (Release 1) • Available resources: • Linux farms (a total of ~50 Pentium III 800 MHz processors); • >1. TB disc store (>500 GB. on disk servers). • Manpower: • ~5 FTE (physicists and computing experts).