Volusia County SunRail Project

Volusia County SunRail Project. Commuter Regional Rail. United States Average Speed: 33 mph Trip: 24 miles Cost Per Passenger Mile: $0.43 Rail transit using ROW usually adapted from freight rail Both clean diesel and electric are common; all recent new starts used clean diesel

midori
Download Presentation

Volusia County SunRail Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Volusia CountySunRail Project

  2. Commuter Regional Rail

  3. United States Average • Speed: 33 mph • Trip: 24 miles • Cost Per Passenger Mile: $0.43 • Rail transit using ROW usually adapted from freight rail • Both clean diesel and electric are common; all recent new starts used clean diesel • Top speed is typically 60-90 mph, but speed impacted by station spacing Commuter Rail

  4. Light Rail

  5. United States Average • Speed:15 mph • Trip: 5 miles • Cost Per Passenger Mile: $0.70 • Rail transit using exclusive and mixed ROW • Almost all are electric, overhead power • Vehicles are faster, larger and require more complex construction vs. streetcar Light Rail

  6. Modern Streetcar

  7. United States Average • Speed: 9 mph • Trip:2 miles (estimate) • Cost Per Passenger Mile: $0.70 • Rail transit using street ROW • Similar to light rail bus smaller, slower vehicles, simpler construction • Almost all are electric, overhead power Streetcar

  8. Bus Rapid Transit

  9. United States Average: • Speed:20 mph • Trip: 5 miles (estimate) • Cost Per Passenger Mile: $1.00 • High speed, high capacity vs. fixed route • May include exclusive ROW, stations, signal priority, level boarding, prepaid fares Bus Rapid Transit

  10. Intercity Rail

  11. Source: APTA Public Transportation Fact Book Comparative Operation Costs 2010

  12. Source: APTA Public Transportation Fact Book Capital Expenses 2010

  13. Denver • Atlanta • DFW • Charlotte • Nashville Comparison MSAS

  14. Denver

  15. Atlanta

  16. Dallas/Fort Worth

  17. Charlotte

  18. Nashville

  19. Unique Comparison MSA • Albuquerque/ • Santa Fe

  20. Albuquerque/Santa Fe

  21. MCSAS Over 1.5 Million Population

  22. Volusia County SunRail Extension

  23. Under SAFETEA-LU Project Development Project Construction Grant Agreement Alternatives Analysis • Develop and select locally preferred alternative (LPA) • Adopt LPA into fiscally constrained long range transportation plan • Complete environmental review process • Gain commitments of all non-5309 funding • Complete sufficient engineering and design • Construction Under MAP-21 • Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into fiscally constrained long range transportation plan • Gain commitments of all non-5309 funding • Complete sufficient engineering and design • Construction Project Development Expedited Grant Agreement Small Starts Project Development Process Legend = FTA approval = FTA evaluation, rating, and approval

  24. New Starts Project Development Process Under SAFETEA-LU Alternatives Analysis Preliminary Engineering Final Design Full Funding Grant Agreement • Develop and review alternatives • Select locally preferred alternative (LPA) • Adopt LPA into fiscally constrained long range transportation plan • Complete environmental review process • Gain commitments of at least 50% of non-New Starts funding • Gain commitments of all non-New Starts funding • Complete sufficient engineering and design • Construction Under MAP-21 • Gain commitments of all non-New Starts funding • Complete sufficient engineering and design • Complete environmental review process including developing and reviewing alternatives, selecting locally preferred alternative (LPA), and adopting it into the fiscally constrained long range transportation plan • Construction Project Development Engineering Full Funding Grant Agreement Legend = FTA approval = FTA evaluation, rating, and approval