Peter Godfrey Network Strategy Manager NS North

Peter Godfrey Network Strategy Manager NS North. M606 – M62 HOV GATE. M606 – M62 HOV GATE. Pilot Study Area. M606 – M62 HOV GATE. Initial HOV Scheme. M606 – M62 HOV GATE. Final HOV Scheme (1). M606 – M62 HOV GATE. Final HOV Gate Scheme (2). M606 – M62 HOV GATE. Scheme Benefits.

mercury
Download Presentation

Peter Godfrey Network Strategy Manager NS North

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Peter Godfrey Network Strategy Manager NS North M606 – M62 HOV GATE

  2. M606 – M62 HOV GATE Pilot Study Area

  3. M606 – M62 HOV GATE Initial HOV Scheme

  4. M606 – M62 HOV GATE Final HOV Scheme (1)

  5. M606 – M62 HOV GATE Final HOV Gate Scheme (2)

  6. M606 – M62 HOV GATE Scheme Benefits The M606 – M62 HOV gate scheme is expected to deliver benefits, these include: • Drivers in car share vehicles will be able to gain priority access, bypassing congestion. • Car share vehicles would save on average 8 minutes during the peak periods on this section of road. • Environmental benefits as drivers share their cars with others.

  7. M606 – M62 HOV GATE Scheme Visualisation Visually demonstrates the operation of M62 J26 with and without the proposed HOV gate during peak periods.