1 / 24

FRIGI-TECH REFLECTIVE ROOF COATINGS

FRIGI-TECH REFLECTIVE ROOF COATINGS. MAIN BENIFITS. INSULATES – Outperforms 7” of fiberglass insulation. Keeps interiors cooler and more comfortable. CUTS COST of air conditioning by up to 40%. Increase in storage capacity of fuel storage tanks.

menora
Download Presentation

FRIGI-TECH REFLECTIVE ROOF COATINGS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FRIGI-TECH REFLECTIVE ROOF COATINGS

  2. MAIN BENIFITS • INSULATES – Outperforms 7” of fiberglass insulation. Keeps interiors cooler and more comfortable. CUTS COST of air conditioning by up to 40%. Increase in storage capacity of fuel storage tanks. • INHIBITS RUST–Prevents perforation and damage due to corrosion. • PROTECTS- against UV, chemical damage. Is not affected by high winds or rain. Resists Mildew and algae. • REDUCES THERMAL SHOCK- by lowering roof temperatures by as much as 60 degrees. This translates to less expansion/contraction and less stress and wear on fasteners and connections. • WATERPROOF – Stops leaks and prevents moisture absorption on all surfaces. • FIRE RETARDANT– Zero flame spread. • IMPROVES APPEARANCE- with an extremely durable elastomeric finish that will not crack, chip, or peel. Can be tinted any color. Cuts your maintenance cost. • ENVIRONMENTALLY SAFE – No asbestos, lead, vinyl acetate, plastics, oils, odors or gases. Wash with water. • ENCAPSULATES- asbestos surfaces and existing hazardous coatings.

  3. Metal Concrete Asphalt Rubber Glass Tar and Gravel Wood Shingle APPLICATIONSAny surface that heat needs to stay in or out of.

  4. ENERGY STAR APPROVAL • ENERGY STAR is a U.S. government-backed program helping businesses and individuals protect the environment through superior energy efficiency.

  5. PRODUCTS • FRIGI-TECH TOP COAT • FRIGI-TECH TOP COAT II • FRIGI-TECH PRIMER • POLYESTER MEMBRANE

  6. TOP COAT • An Acrylic white coating with nearly 400% elongation. Ideal for metal, built-up roofs with good drainage, shingles and all types of walls. Produces a tough washable coat that reduces dirt pick-up and stays cool with ceramic ingredient.

  7. TOP COAT II • All of the qualities of TOP COAT original with the added ability to resist standing water conditions. To be used on all surfaces in area that experience high humidity. Can reduce heat gain as efficiently as 7 inches of conventional insulation

  8. PRIMER • 100% acrylic, Elastomeric roof mastic formulated to exhibit hi-adhesion and flexibility. For use over most types of roof and wall surfaces. Recommended for use on all foam roofs.

  9. POLYESTER MEMBRANE • A spun bound and woven 100% polyester fabric, which is embedded into the basecoat to prevent extreme movement by greatly increasing the tensile strength of the system.

  10. PROPERTIES

  11. % Solar Reflective

  12. METAL ROOF APPLICATION • VISUAL INSPECTION and REPLACEMENT of DAMAGED BUILDING MATERIALSThe substrate to be coated must be in SOUND condition. Physically inspect the surface area for missing or damaged building materials. Replace and/or repair all damaged areas back to sound and solid condition.Check for loose or missing fasteners (screws) and tighten or replace them.Inspect for any existing leaks and be sure to repair leaks prior to the application of coating.Make sure roof is adequately vented. Check with a roofing contractor if necessary.

  13. METAL ROOF APPLICATION • STEP#:2 PRESSURE CLEANINGHigh Pressure Blast entire roof surface with at least 1500 P.S.I. of pressure using a water and chlorine solution (1 quart chlorine to 5 gallons of water). Thoroughly remove all dirt, oil, grease, residues, mold, mildew, algae and any other surface contaminants. When roof is completely cleaned, rinse with water only. Let roof surface dry before continuing.

  14. METAL ROOF APPLICATION • First Spot Prime all rusted areas and let dry at least 12 hours before applying the second coat of rust inhibitor to the effected area. Apply the rust inhibitor at a rate of 125-150 square feet per gallon covering the entire rusted surface. Wet film thickness of 10-12 mils wet resulting in dry film thickness of 7-9 mils. Let the rust inhibitor dry at least 12 hours before continuing

  15. METAL ROOF APPLICATION • STEP#:4 CAULKING SCREWSPatch and Caulk all screws or fastener heads, cracks, crevices, fractures, holes, valleys, vents, voids, etc., with a Water Proofing caulk. Use a trowel or stiff brush to apply. Multiple coats are better than one thick coat if possible.

  16. METAL ROOF APPLICATION • STEP#: 5 TAPING SEAMSTape all visible seams, large cracks and fractures prone to water intrusion on roof surface. Apply a liberal coat of PRIMER at 10-12 mils wet film thickness, directly to the affected area using brush, roller or airless spray and lay the POLYESTER MEMBRANE directly into the WET PRIMER.

  17. METAL ROOF APPLICATION • STEP#:6PRIME COATApply PRIMER using 1- brush, 2- at least a one inch nap roller, or 3- at least a 1 gallon per minute, 3,000 P.S.I. piston type airless sprayer with a minimum tip size of .027 tip.

  18. METAL ROOF APPLICATION • Apply the PRIMER at a rate of 125-150 square feet per gallon covering the entire roof surface. Wet film thickness of 10-12 mils wet resulting in dry film thickness of 7-9 mils. Let PRIMER dry at least 12 hours before continuing.

  19. METAL ROOF APPLICATION • STEP#: 7 FIRST COAT of FINISH/TOP COATWhen Spraying or Rolling TOPCOAT the first coat of TOPCOATmust be applied perpendicular to the coat ofPRIMER to achieve a checkerboard pattern. Apply the first coat of TOPCOAT at a rate of 100-125 square feet per gallon per coat over the entire roof surface. Wet film thickness of 12-15 mils resulting in dry film thickness of 8-10 mils.

  20. METAL ROOF APPLICATION • STEP#: 8 SECOND COAT of FINISH/TOP COATApply the second coat of TOPCOAT at a rate of 100-125 square feet per gallon per coat over the entire roof surface. Wet film thickness of 12-15 mils resulting in dry film thickness of 8-10 mils. Let dry at least 24 hours before your Final Evaluation

  21. METAL ROOF APPLICATION • STEP#: 9 FINAL EVALUATIONA detailed evaluation of the completed job will determine the quality of the workmanship and whether strict application specifications have been met. Be sure to check that all roof areas are completely coated and sealed under permanently placed roof items such as roof top air conditioning units. Divide roof into 1,000 square feet sections and randomly check one spot in each section for a dry film thickness of at least 20 mils. If specifications have not been met, determine how much material will be required to meet specifications and recoat.

  22. EXAMPLES

  23. EXAMPLES

  24. BEFORE AND AFTER

More Related