What Sedlak Did. Challenges. Incorporated selected concepts into FC and expansion footprint Conducted a detailed design of the building expansion along with CAD drawings of MHE systems Developed overall capital and operating costs and implementation timeline for final solution

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'What Sedlak Did' - meena


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
What sedlak did

What Sedlak Did

Challenges

  • Incorporated selected concepts into FC and expansion footprint

  • Conducted a detailed design of the building expansion along with CAD drawings of MHE systems

  • Developed overall capital and operating costs and implementation timeline for final solution

  • Sedlak’s work included detailed design and implementation of all MHE

  • Defined and maintained project schedule and budget

  • Nearly a decade after Sedlak designed a new fulfillment center for Nordstrom’s direct to consumer business markets, natural growth is causing constraints across many functions in the facility

  • Sedlak has been commissioned to conduct an in-depth analysis of the fulfillment center (FC) requirements through a six-year planning horizon

What Sedlak Did

  • Developed a forecast of FC operational activity, design criteria, product handling characteristics, and distribution procedures were formulated and validated

  • Compared processing and storage volumes to actual capacities to identify shortfalls; improvements were identified and spanned operational changes, productivity enhancements, additional equipment, and more facility footprint

  • Through our concept evaluation methodology, identified and developed material handling concepts that met Nordstrom’s criteria for ROI

Results

  • Development of a master facility/operational plan to support business requirements well into the future

  • Improved operational methodologies for every major function within the FC resulted in a best-practices facility, positioning Nordstrom’s to meet its very high, extraordinary customer service standards

  • Nordstrom’s FC expansion doubled the size of the facility from 350,000 sq. ft. to over 700,000 sq. ft.