1 / 2

What Sedlak Did

What Sedlak Did. Challenges. Incorporated selected concepts into FC and expansion footprint Conducted a detailed design of the building expansion along with CAD drawings of MHE systems Developed overall capital and operating costs and implementation timeline for final solution

meena
Download Presentation

What Sedlak Did

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What Sedlak Did Challenges • Incorporated selected concepts into FC and expansion footprint • Conducted a detailed design of the building expansion along with CAD drawings of MHE systems • Developed overall capital and operating costs and implementation timeline for final solution • Sedlak’s work included detailed design and implementation of all MHE • Defined and maintained project schedule and budget • Nearly a decade after Sedlak designed a new fulfillment center for Nordstrom’s direct to consumer business markets, natural growth is causing constraints across many functions in the facility • Sedlak has been commissioned to conduct an in-depth analysis of the fulfillment center (FC) requirements through a six-year planning horizon What Sedlak Did • Developed a forecast of FC operational activity, design criteria, product handling characteristics, and distribution procedures were formulated and validated • Compared processing and storage volumes to actual capacities to identify shortfalls; improvements were identified and spanned operational changes, productivity enhancements, additional equipment, and more facility footprint • Through our concept evaluation methodology, identified and developed material handling concepts that met Nordstrom’s criteria for ROI Results • Development of a master facility/operational plan to support business requirements well into the future • Improved operational methodologies for every major function within the FC resulted in a best-practices facility, positioning Nordstrom’s to meet its very high, extraordinary customer service standards • Nordstrom’s FC expansion doubled the size of the facility from 350,000 sq. ft. to over 700,000 sq. ft.

  2. NORDSTROM FULFILLMENT CENTER W/EXPANSION

More Related