CDM Implementation Experiences of Bhutan. Sonam Yangley Director National Environment Commission. Background on CC. Bhutan’s significant step to address Climate Change issues: signed UNFCCC at Rio de Janeiro in 1992 ratified UNFCCC during the 73 rd Session of National Assembly in 1995

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'CDM Implementation Experiences of Bhutan' - medwin


Download Now An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript
cdm implementation experiences of bhutan

CDM Implementation Experiences of Bhutan

Sonam Yangley

Director

National Environment Commission

background on cc
Background on CC

Bhutan’s significant step to address Climate Change issues:

  • signed UNFCCC at Rio de Janeiro in 1992
  • ratified UNFCCC during the 73rd Session of National Assembly in 1995
  • NEC designated to host the National Climate Change Committee
  • NECS - focal institution for the UNFCCC
  • Submitted the Initial National Communication at the 6th Conference of Parties in November, 2000
background on cc cont
Background on CC … cont.
  • Completed first National Inventory on Greenhouse Gas Emission
  • Commissioned first CDM Project (pilot) in Bhutan
  • Undergoing research on Impact of Climate Change and its Adaptation measures in Bhutan
  • Preparation of National Adaptation Plans of Action (NAPA)
sector wise potentials
Sector-wise potentials
  • Energy sector
    • Off grid minimal
    • Export to India Issues
  • Forestry Sector
    • Limited CDM
  • Industries Sector
    • Possible, need more research
pilot projects
Pilot Projects
  • Micro Hydro Project in Chendebji
    • 70 kW
    • E7 financing
    • 700 tCO2
  • Pilot project in for a forestry CDM project
    • Envirotrade (UK), Edinburgh Center for Carbon Mgmt, Namsay Consulting (Bhutan)
    • Only “concept note”. Proposal to be prepared only after approval by RGOB.
pilot cdm project in chendebji micro hydro

Pilot CDM Project in Chendebji (Micro Hydro)

E7 Fund for sustainable energy development and the

Department of Energy, RGOB

purpose
Purpose
  • To test the principles of CDM

-carbon credit sharing by and for sustainable development of renewable energy resource (micro hydro).

- gain experience to contribute to rule making for the CDM.

salient features of the proposed project
Salient Features of the proposed Project
  • Micro hydro – 50 metres head, 0.2 m3/s discharge to generate 70 kW power and 582,540 kWh per annum.

Project Objective:

i) Demonstration of the project as the CDM pilot project

ii) RE of 42 HH, 5 institutional buildings at Chendebji village

iii) Improvement of education and living standards utilizing ICT.

present status
Present Status
  • Commissioned the hydropower plant
  • Estimated cost of the Project (as per PFS) is US$ 280,000 +/- 25% variation
  • Total reduction in CO2 emission by this project estimated at 593.1 ton CO2 (~ valued at US$ 5,931 – 17,793) – kerosene, firewood and diesel replacement.
experiences
Experiences
  • Small scale CDM Projects – good only as a pilot scheme due to cheaper investment cost
  • CER shares: 50 – 50 between RGoB and e7
  • CER Prices to be negotiated yet
  • Need capacity building on preparation of full scale CDM Project
  • Need capacity building for DNA
recommendations
Recommendations
  • Carbon trading has potential to complement “value adding”.
  • Potential for Bhutan not yet clear. It may be modest. More research is needed.
  • Carbon trading is more than CDM (Kyoto Protocol) so look at other possibilities such as niche markets.
  • CDM Administrative cost are expensive and modalities complex
recommendations12
Recommendations

5. To fully benefit from carbon trading, more human resources and capacity building and awareness is needed.

6. Pilot projects should be implemented (learning by doing) to provide guidance in evaluating cost/benefits of carbon projects.