An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report to TAC February 2010

  2. In Brief • WMS 2010 Goals • WMS Leadership for 2010 • Chair: Barbara Clemenhagen • Vice Chair: Jennifer Troutman • Working Group Reports • CMWG • Goals: CSC for 2011, PCAPs and Nodal Competitive Constraint Test, Bus Mapping • DSWG • LaaR Performance • EILS Report - W-B012010-02 REVISED EILS Procurement for Feb-May 2010 • MCWG • NPRR 206 – DAM Credit Requirements, Short-Pay Fund, DAM Collateral Requirements • VCWG • NPRR for FOP dispute (to be submitted), Nodal Start-up Offer for RMR (no variable) • QMWG • PRR 833 Primary Freq Res from WGR, PRR 841 (endorsed), Load Forecast Accuracy • NPRR 091 – concerns raised regarding length of mitigation and what is capped

  3. In Brief • Task Forces • MIGTF – Protocol Changes to be Drafted (91 days / IA Requirements / Minimal Cost) • GATF – March presentation to TAC • WCATF – Two proposals – will report on the how not the should • Other Activities • Timing of Trades in Nodal related to Standard Form Contracts

  4. WMS Leadership for 2010 • Subcommittee • Chair, Barbara Clemenhagen, Topaz Power (GEN) • Vice Chair, Jennifer Troutman, AEP (IOU) • CMWG • Chair: Marguerite Wagner – PSEG TX (GEN) • Vice-Chair: Eric Goff – Reliant Energy (REP) • DSWG • Chair: Mary Anne Brelinsky, EDF Trading North America (REP) • Co-Vice Chair: Nelson Nease, Nucor Steel (CONSUMER) • Co-Vice Chair: Timothy Carter, Constellation New Energy (REP) • MCWG • Chair: Morgan Davies, Calpine (GEN) • Vice-Chair: Eric Goff – Reliant Energy (REP) • VCWG • Chair: Heddie Lookadoo, NRG (GEN) • Vice Chair: Ian Davis, Topaz Power (GEN) • QMWG • Chair: David Detelich, CPS (MUNI) • Vice Chair: Jeremy Carpenter, Tenaska (IPM)

  5. Working Group ReportsCMWG • Presentation available at http://www.ercot.com/content/meetings/wms/keydocs/2010/0120/06_cmwg_update_to_wms_100120.ppt • Main topics • Goals for 2010 • Nodal Competitive Constraint Test • Pre Contingency Action Plans • 2011 CSCs • Bus mappings for Load Zones for Nodal • Operational Insights • Voltage issues at Kendall • Installation of Yellow Jacket Phase Shifter

  6. Working Group ReportsCMWG • Main topics • Nodal Competitive Constraint Test • Annual Competitive Constraint Process—thought is to mimic existing CSC process. CMWG to work with ERCOT and make recommendation to WMS • Pre Contingency Action Plans • ERCOT committed to check on posting use of PCAPs in RT • One idea was to post at: http://oldercot.ercot.com/ercotPublicWeb/Message/MessageSearch.asp • This would enable posting in RT and not require system changes • Next Meeting: TBA (post-WMS Meeting held on January 27th)

  7. Working Group ReportsDSWG • Presentation available at http://www.ercot.com/content/meetings/wms/keydocs/2010/0120/07_dswg_update_to_wms_100120.ppt

  8. Working Group ReportsDSWG • LaaR Performance Protocol Revision to 6.10.5.4

  9. The revised and final procurement results are as follows: The revised and final procurement results are as follows: Working Group ReportsDSWG • EILs Contract Period February – May 2010

  10. The revised and final procurement results are as follows: The revised and final procurement results are as follows: Working Group ReportsDSWG • EILs Contract Period February – May 2010

  11. Working Group ReportsMCWG • Presentation available at http://www.ercot.com/content/meetings/wms/keydocs/2010/0120/09_mcwg_update__to_wms_100120.ppt • Main topics • WMS endorsed DAM NPRR: • Expanded loss mutualization for entire market and accelerated DAM • NPRR will be available prior to Feb WMS meeting • NPRR 206 • Update on Short-Pay Fund - a subgroup has been set up to discuss

  12. Working Group ReportsMCWG • Parking Lot and Goals for 2010 • Goals to be address at February WMS • Parking Lot: • Direction of invoice timing change • Perform bottom up review of existing creditworthiness standards (after CCRO Best Practices efforts) • Reduction of settlement cycle due to PRR 568 (7days) • Further reductions in settlement cycles • This includes looking at the potential to reduce the settlement cycle 30% with improved metering

  13. Working Group ReportsQMWG • Presentation available at http://www.ercot.com/content/meetings/wms/keydocs/2010/0120/10_qmwg_update_to_wms_100120.ppt • Main Topics • Review 30 minute NSRS deployments • WGRPP Forecast Accuracy Update • Zonal RPRS unit de-selection • PRR841 Revise Total ERCOT Wind Power Forecast – WMS endorsed • Load Forecasting Accuracy • Definition of WGR • SCR757, Real Time Wind Production by Zone • PRR833, Primary Frequency Response requirement from Existing WGRs • Draft PRR: Decommitment process for RUC • Next QMWG Meeting: March 8th

  14. Working Group ReportsVCWG • Presentation available at http://www.ercot.com/content/meetings/wms/keydocs/2010/0120/11_vcwg_update_to_wms_01202010.ppt • Main Topics • Options for Filing RUC Cost • Verifiable Costs or Standard Costs • Proxy Heat Rate • review DRUC and HRUC after the first 3 months of Nodal to determine if the Proxy heat rate should be changed • NPRR Language for allowing disputes for FOP • To be submitted by CPS • ERCOT bidding of RMR Units – no variable • Sent to NATF • Next VCWG Meeting: February 10th

  15. Active Task Forces • Generation Adequacy Task Force http://www.ercot.com/content/meetings/wms/keydocs/2010/0120/14_gatf_report_to_wms_100120_.doc • WMS expected to vote in February • CDR Inputs, Calculations and Format • Installed Capacity Assumptions – use RARF • New Unit Additions – affirmative declaration • Renewables - ELCC • Mothballed Capacity – no change • DC Tie Capacity – no change • Switchable” Capacity - RARF • Netting of Generation and Load – no change • Retired Capacity – introduce “pending unit requirements” line • CDR Format – move Summer and Winter Capacities closer to front

  16. Active Task Forces • Joint ROS/WMS Multiple Interconnection of Generation Task Force (MIG TF) • Market Participant Notification Period (Transmission outage) • WMS endorsed 91 Days with 17 in favor 3 opposed and 3 abstentions • Interconnection Date for Protocol Considerations • MIGTF shall draft protocols to introduce generation operation date. The generation operation date shall define what the generation unit is expected to do, and the Interconnection Date would define the requirements of equipment at the point of interconnection. Existing resources reconnecting to a different line would be grandfathered to the date of the original interconnection. • Motion carried (19), No opposing votes , 3 abstentions • Planning Concept Endorsement • Option – B - Minimal Cost - As a default view TSPs would try to minimize the cost of Transmission, (ERCOT process does not change regarding optimization). • Motion carried with no abstentions and one opposed. • Approval of MIG Whitepaper –http://www.ercot.com/content/meetings/wms/keydocs/2009/1216/11_mig_draft_white_paper_091216.doc • Next Step to Draft Protocol Revisions

  17. Active Task Forces • Wind Cost Allocation Task Force (WCATF) http://www.ercot.com/content/meetings/wms/keydocs/2010/0120/15_wcatf_update_to_wms_100120.ppt • Task Force is working through a Reliant and Luminant proposals (see slides). • Participants continue to have concerns regarding goals of TF. • Next Meeting: February 8th

  18. WMS 2010 Goals