MEP Interim Review: Greenhouse x10 Design Updates
210 likes | 291 Views
Request for action on greenhouse/pressure system enhancements, molding tool design, thermal shield/structure improvements, and electronics/software integration for the Martian Environmental Pod project. Keyed shaft and sleeve assembly, new assembly order, and testing updates discussed. Progress and schedule for completion detailed for each component.
MEP Interim Review: Greenhouse x10 Design Updates
E N D
Presentation Transcript
MEP(Martian Environmental Pod) Interim Review #2 3/15/2004 Aerospace Engineering Department University of Colorado-Boulder
Greenhouse x 10 Mounting Box Thermal Petals Electronics Package Platform
Design Changes • Greenhouse/Pressure System • Molding tool design • Thermal Shield/Structure • Keyed aluminum shaft and aluminum sleeve • New assembly order • Electronics/Software • Trimpot
Molding Tool • New design allows for the use of a furnace instead of internal heater • Shelled out to reduce heating time • Rolling method is done by hand on top of grooved plate
Keyed Shaft and Sleeve • Keyed aluminum shaft to eliminate the need for welding • Key • 0.1’’ x 0.2’’ x 0.3’’ • Aluminum shaft • Depth: 0.1’’ • Aluminum sleeve • Depth: 0.2’’
Greenhouse/Pressure System • Molding tool is complete • Tested for functionality: • Control valve • Regulator and CO2 tank
Thermal Shield/Structure • Completed petals 1 - 5 using new epoxy • Machined parts for petals 6 - 10 • Machined electronics box parts
Electronics Testing • Verified functional operation of: • Pressure transducer • Thermistor • Determined conversion coefficient • LabView
Current Issues • Laser cutter availability/reliability • Solution: sand edges for even mating surface • Outdoor testing -Solution: car inverter for power supply and data acquisition system
To Be Completed: Greenhouse/Pressure System • Molding plate (3/19/04) • Shape Kapton for deployable greenhouse (3/31/04) • Construct greenhouse around acrylic rings (4/2/04)
To Be Completed: Thermal Shield/Structure • Finish constructing thermal shield (3/19/04) • Machine and construct base structure (3/28/04) • Machine aluminum shaft and sleeve (3/31/04)
To Be Completed: Electronics • Integration of Trimpot (3/28/04) • Finish Circuit (4/2/04) • Copper Custom Plate
Integration • Fasten greenhouse to mounting box (3/28 – 3/31) • Assemble final structure (3/28 – 4/2) • Integrate pressure and power sources with electronics package (3/28 – 4/2)