1 / 42

GEF International Waters Game Show

GEF International Waters Game Show. Hosted by Mr. Andrew Hudson Head, Water and Ocean Governance Programme United Nations Development Programme. GEF International Waters Game Show. Basics 4 Contestants 40 Questions, 40 Points Winning Prize is a GEF IW LEARN Twinning.

maxine
Download Presentation

GEF International Waters Game Show

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GEF International Waters Game Show Hosted by Mr. Andrew Hudson Head, Water and Ocean Governance Programme United Nations Development Programme

  2. GEF International Waters Game Show Basics 4 Contestants 40 Questions, 40 Points Winning Prize is a GEF IW LEARN Twinning

  3. GEF International Waters Game Show Question 1 • PIF stands for: A. Project Identification Form B. Project Information Form C. Implementation Framework • D. Perfectly Incremental Fishery • E. Project Integration Facility

  4. GEF International Waters Game Show Question 2 • Which of the following is NOT reported in the GEF’s annual PIR process: A. Project Financial Status B. Project Implementation Progress C. Project preparation Progress • D. Lessons Learned • E. Changes in Project Objectives or Outcomes

  5. GEF International Waters Game Show Question 3 • Which of the Following is NOT a GEF IW Stress reduction Indicator? A. Hectares of Conserved/Protected Habitat B. ㎥/year of water saved through use efficiency measures C. Municipal Wastewater Pollution Reduction (mt N/year) • D. Practicing Daily Tai Chi • E. Reducing Fishing Pressure (% Reduction in Fleet Size)

  6. GEF International Waters Game Show Question 4 • A World Bank/FAO study estimated the annual global • economic loss due to overfishing as about: A. US$ 100 million B. US$50 billion C. US$1 trillion • D. US$7 billion • E. US$500 billion

  7. GEF International Waters Game Show Question 5 • GEF Agency Fees are Utilized for: A. GEF Project and Portfolio Oversight B. Project Management C. Organizing Office Parties at TGIF’s • D. Infrastructure Development • E. Core Budget Support to Government

  8. GEF International Waters Game Show Question 6 • Which of the following stakeholders would NOT • normally be part of a GEF IW project steering committee: A. Government Representatives B. GEF Agency Representatives C. NGO Representatives • D. STAP Members • E. Executing Agency Representatives

  9. GEF International Waters Game Show Question 7 • GEF Approval is Required for Changes to the • Project Logistical Framework When: B. Decreased in Size of Hypoxic Area in a Shared LME A. Project Outcomes and/or Objectives are Altered • D. Mr. Spock deems the log frame “Illogical” C. New Risks to Project Implementation are Identified • E. Adaptive management Suggests Replacing some Activities with New Ones

  10. GEF International Waters Game Show Question 8 • At Which Point in Project Implementation is the • GEF IW Tracking Tool NOT Reported? A. Mid-Point B. First Year C. Last Year • D. Hourly

  11. GEF International Waters Game Show Question 9 • Which of the following is NOT a GEF Process Indicator? B. Decrease in Size of Hypoxic Area in a Shared LME A. Adopted Strategic Action Programme C. Multi-Country Agreement on Regional Water Body Legal Framework • D. Completed Transboundary Diagnostic Analysis • E. Established an Operational Inter-Ministerial Committees

  12. GEF International Waters Game Show Question 10 • Which of the Following is NOT Cash Co-Financing? B. Bilateral Resources for Organizing a Workshop Governmental Funds for Staff to Attend Meetings C. Government Staff Time • D. EU Grant to a GEF Agency • E. Private Sector Supply and Equipment Donations

  13. GEF International Waters Game Show Question 11 • Which of the Following does NOT Contribute to Project Sustainability? B. Increased Government Financing of Regional Water Body Institution Increased Dependence on GEF Financing as other Sources Dwindle C. Measureable Increase in Public Awareness about the Project and the Issues being Addressed • D. Implementation of a Payment of • Ecosystem Services Scheme • E. Increase in Public and Private Investment Targeting Priority Transboundary Issue

  14. GEF International Waters Game Show Question 12 • IW: LEARN Stands for: B. International Waters Leaking Everywhere and Ruining Norway A. International Workshop for Leading Edge Approaches to Registering Nurses C. International Waters Learning Exchange and Resource Network • D. International Waters Legal Exchange • and Registry Network • E. International Waters Learning Emporium and Resource Node

  15. GEF International Waters Game Show Question 13 • Which GEF IW Project had the Largest Number of Governments to • Endorse a SAP? B. Carribean Sea LME A. Guinea Current LME C. Danube Current LME • D. Benguela Current LME • E. Nubian LME

  16. GEF International Waters Game Show Question 14 • Which of the Following is NOT a GEF IW Socioeconomic Indicator? B. Reduction in Water-Related Diseases due to Improved Wastewater Treatment Improvements in Incomes of Fishermen in a Sustainably Managed Fishery C. Increases in Fishery Export Earnings • D. Income Streams to Local Community • from a Blue Carbon Project • E. Increase in Sturgeon Caviar Exports by Organized Crime

  17. GEF International Waters Game Show Question 15 • The Volume of Renewable Water Resources in the • Nubian Sandstone Aquifer is: B. 500㎢ 8,000㎢ C. 110,000㎢ • D. 0㎢ • E. 31,000㎢

  18. GEF International Waters Game Show Question 16 • Ocean Acidification is Caused by: B. Whale Excreta Increased Oil Spills, such as in the Gulf of Mexico C. Dissolution of Anthropologic CO2 Emissions into the Ocean forming Carbonic Acid • D. Spillage of Acidic • Softdrinks into the Oceans • E. Climate Change

  19. GEF International Waters Game Show Question 17 • Which of the Following Water Bodies would NOT be • Eligible for a GEF IW Interventions? B. Lake Baikal Lake Chad C. Lake Tanganyika • D. Lake Michigan • E. Lake Titicaca

  20. GEF International Waters Game Show Question 18 • How Many Countries have 95% of their Territory • Within Transbounary Basin? B. 7 33 • D. 153 C. 65 • E. 0

  21. GEF International Waters Game Show Question 19 • Which of the Following is NOT a GEF-5 Strategic Objective • B. Catalyze Multi-State Cooperation to Integrate Management of Land, Water, Biodiversity, Coastal and Marine Resources while building Climate Resilience • A. Catalyze Multi-State Cooperation to Balance Conflicting Water Uses in Transboundary Surface and Groundwater Basins while Considering Climatic Variability and Change • C. Catalyze Multi-State Cooperation to Rebuild Marine Fisheries and Reduce Pollution of Coasts and Large Marine Ecosystems while Considering Climatic Variability and Change • D. Support Foundational Capacity Building, • Portfolio Learning, and Targeted Research Needs • for Ecosystem-based, Joint Management of • TransboundaryWater Systems • E. Promote Effective Management of Marine Areas Beyond National Jurisdiction

  22. GEF International Waters Game Show Question 20 • The principal basis of incrementality in the GEF International Waters focal area is: • B. Marginal cost of water • A. Globally significant biodiversity • C. Addressing transboundary waters issues • D. Projects proceeding step by step • E. Ensuring delivery of national benefits

  23. GEF International Waters Game Show Question 21 • International Waters historically represents about what percentage of GEF • financial allocations across all the focal areas: • A. 12% B. 30% • D. 53% C. 5% • E. o.07

  24. GEF International Waters Game Show Question 22 • Which of the following is NOT a preferred competency of a • GEF IW project manager: • A. Diplomatic skills • B. Impatience and intolerance • C. Personnel management skills • D. Strong technical background • E. Team-building skills

  25. GEF International Waters Game Show Question 23 • Which of these is NOT a key stage in the overall cycle of • GEF support to improving management of a shared waterbody: • Implementation of agreed regional and • national governance reforms • B. Negotiation of agreed action programme of legal, policy and institutional reforms • C. Agreement on transboundary priorities based on sound science and economics • D. Creating and/or strengthening of • regional waterbody institution E. Selling off equipment at project closure

  26. GEF International Waters Game Show Question 24 • With catalytic support from PEMSEA over nearly twenty years, • what percentage of the East Asian Seas coastline is now under some form • of Integrated Coastal Management • A. 98% • B. 34% • C. 12% • D. 3% E. 0.6%

  27. GEF International Waters Game Show Question 25 • Which of the Following Scenarios do GEF IW Project Managers • NOT need to be prepared for? • B. Budget Shortfalls • A. Project Extensions • D. Large Annual Bonuses • C. Staff Conflict Resolution E. Negative Publicity about the Project in the Media

  28. GEF International Waters Game Show Question 26 • Which of the Following is NOT a GEF Agency? • A. UNDP • B. FAO • C. IFAD • D. UNICEF E. WWF

  29. GEF International Waters Game Show Question 27 • Which of the Following is NOT One of the Five LME Modules? • A. Pollution and Ecosystem Health • B. Fish and Fisheries • C. Shipping • D. Governance E. Socioeconomics

  30. GEF International Waters Game Show Question 28 • The GEF is Supporting Inegretaed Water Resources Management • in What Portion of the World’s Small Island Developing States? • B. 75% • A. 100% • C. 50% • D. 25% E. 10%

  31. GEF International Waters Game Show Question 29 • Which of the Following is NOT a Responsibility of an • Entity Executing a Project of Behalf of a GEF Agency? • B. Personnel Contract Management • A. Procurement • D. Project Financial Management • C. Arranging Travel for Meetings E. Annual Project Implementation Review Reporting to GEF

  32. GEF International Waters Game Show Question 30 • Which of the following is generally NOT a feature of a first year • Project Implementation Plan within a Project Inception Report: • B. Key Activities Expected in the First Year • A. Final Independent Evaluation • D. Detailed Timeline Indicating Milestone • and Deliverables • C. Clear Assignment of All Tasks and Responsibilities E. Expected Meetings, Reports, Etc.

  33. GEF International Waters Game Show Question 31 • At Project Completion, GEF IW Project Websites Should be: • A. Deleted • B. Archived Within the IW: LEARN Web Space • C. Promoted Through • Twitter and Facebook • D. Printed out for Permanent • Storage in a File E. …We Were Supposed to Have a Website?

  34. GEF International Waters Game Show Question 32 • Which of the following is NOT a component of • effective GEF IW project Monitoring and Evaluation? • B. GEF IW Tracking Tool • A. Project Implementation Review • C. Preparation of GEF Project Identification Form • D. Mid-Term Evaluation E. Monitoring and Evaluation Plan

  35. GEF International Waters Game Show Question 33 • The Estimated Value of the Global Ballast Water Treatment • Market Once the Convention on Ships’ Ballast Water and • Sediment Comes into Force: • B. US$35 billion • A. US$100 million • D. US$27 million • C. US$4.5 trillion E. US$1.7 billion

  36. GEF International Waters Game Show Question 34 • Which of the Following is NOT a Key Aspect of • Gender Mainstreaming in IW Projects? • A. Celebrating International Secretaries’ Day • B. Identifying Gaps in Gender Equality • C. Development of Gender Accountability Mechanisms • D. Strong Political Commitment and Will E. Allocation of Sufficient Resources

  37. GEF International Waters Game Show Question 35 • Which of the Following is NOT a GEF IW Environmental • Status Indicator? • B. Cubic km of Renewable Water Resources in the Guarani Aquifer • A. Concentration of CHL-A in the Black Sea • C. Number of Established Invasive • Species in Manila Bay • D. Metric Tons of Nitrogen Released Per Year • by a Wastewater Treatment Plant E. Biomass of Tuna in the W/C Pacific Ocean

  38. GEF International Waters Game Show Question 36 • Which of the Following is NOT a Rating for a • Process Indicator in the GEF IW Tracking Tool? • IMCs Established and Functioning, • <50% Countries Participating • B. Number of Countries Participating in the IW Project • D. RMI Established and Functioning, • >50% of Countries Contributing Dues • C. SAP Developed and Adopted • by Ministries E. Legal Agreement Ratified and Entered Into Force

  39. GEF International Waters Game Show Question 37 • The GEF IW Portfolio is Cumulatively Active in • How Many of the World’s Large Marine Ecosystems? • A. 64 • B. 127 • C. 6 • D. 21 E. 38

  40. GEF International Waters Game Show Question 38 • In a SAP, “EcoQO” means: • A. Ecosystem Quality Objective • B. Ecologically Queer Origins • C. Ecosystem Query Optimization • D. Economic Quantification Opportunity E. Ecosystem Quantity Objective

  41. GEF International Waters Game Show Question 39 • The Root Cause of Hypoxia in the NW Shelf of the Black Sea Was Primarily: • B. Overuse of Fertilizers in the Danube River Basin Agriculture • A. Discharge of Insufficiently Treated Wastewater into the Danube • C. Too Many Fish in the Black Sea Consuming All the Oxygen • D. Invasion of the Comb Jellyfish • Mnemiopsisledyi in the 1980s • E. Insufficient economic, policy and regulatory incentives • to reduce nutrient emissions from agriculture, wastewater and industry

  42. GEF International Waters Game Show Question 40 • Which of the following is NOTgenerally part of the TDA? • B. Root Cause Analysis • A. Governance Analysis Question 40 • C. Stakeholder Analysis • D. Vision Statement • E. Socioeconomic Analysis

More Related