Rickey Green, PMP
Download
1 / 23

Rickey Green, PMP Manager of Rail Systems Capital Metropolitan Transportation Authority - PowerPoint PPT Presentation


  • 126 Views
  • Uploaded on

Rickey Green, PMP Manager of Rail Systems Capital Metropolitan Transportation Authority Office 512-852-7261 Cell    512-563-4891 [email protected] Eighteen years in the Transportation industry: General Railway Signal                       – Engineering Supply;

loader
I am the owner, or an agent authorized to act on behalf of the owner, of the copyrighted work described.
capcha
Download Presentation

PowerPoint Slideshow about 'Rickey Green, PMP Manager of Rail Systems Capital Metropolitan Transportation Authority' - matt


An Image/Link below is provided (as is) to download presentation

Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.


- - - - - - - - - - - - - - - - - - - - - - - - - - E N D - - - - - - - - - - - - - - - - - - - - - - - - - -
Presentation Transcript

Rickey Green, PMP

Manager of Rail Systems

Capital Metropolitan Transportation Authority

Office 512-852-7261

Cell    512-563-4891

[email protected]

Eighteen years in the Transportation industry:

  • General Railway Signal                       – Engineering Supply;

  • Federal Railroad Administration        – Regulatory;

  • DMJM+Harris Consultant                        – Transportation Engineering (DART)

  • Capital Metropolitan Transit Authority  – Public Transit Agency (Austin, TX)

    Education:

  • MA       – Transportation Management “with a concentration in security

    management” (American Public University);

  • BS        – Multidisciplinary Studies (Rochester Institute of Technology)

  • PMP     – Project Management Professional certification


Presentation overview
PRESENTATION OVERVIEW

HISTORY

PROJECT DESCRIPTION

OPERATING METHODOLOGY

SIGNALIZATION


Cars Shipped = 41,000

CMTA Rail System

CMTA RAIL LINE

UPRR RAIL LINE

162Track Miles

Crushed Aggregate

LLANO

Union Pacific RR

UP R.R.

AUSTIN JCT.

GIDDINGS


  • Public Referendum

  • November 2004

  • 33 Track Miles

  • 9 Station Platforms

  • Single Track

  • 6 DMU’S

  • Rail Maint. Facility

  • 16,000 Sqr. Feet

PROJECT OVERVIEW


Passenger Corridor Rail Stations

Leander

Lakeline

Howard

Burnet

Crestview

Highland

ntown

MLK, JR.

Downtown

Plaza Saltillo


RAIL MAINTENANCE FACILITY

16000 Square Feet




CTC Signal Project

  • Phased Procurement Process.

    • Design;

    • Material Purchase;

    • Installation;

  • Design Basis Temporal Separation.

    • 18 Control Points

    • 9 Intermediate Signals;

    • 6 Split Point Derails.

I


Signal Instrument House

Communications.

  • DCS Interface;

  • Cellular Network;

  • Future Fiber.



Grade crossing upgrade project

Grade Crossing Upgrade Project

70 Public Crossings in Passenger

Corridor;

Project Cost Approximately $ 5 Million;

Phased Procurement Process.

Design;

Material Purchase;

Installation.


Grade crossing upgrade project1

Grade Crossing Upgrade Project

Private Crossings in Passenger

Corridor (15);

Private Crossing Risk Mitigation.

Permanently Close Where Possible;

Control Access ;

Signalize.


Grade crossing treatments

Grade Crossing Treatments

Capital Metro Is Proactive Approach to

Risk Mitigation;

Crossing Markings Upgrade;

Signage Upgrade;

Community Outreach;

Operation Lifesaver;

Fencing Program.


Existing Quiet Zones

Crystal Falls

Avery Ranch

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd

Crestview Wooten


Cedar Quiet Zone

Cedar Park

  • BMC

  • Brushy Creek

  • Park St.

  • Discovery Blvd.

  • FM 1431

  • New Hope Rd.

  • Blockhouse Rd.

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd


CMTA PH-4 Quiet Zone

  • Gracy Farm

  • MOPAC

  • Adelphi

  • Oak Creek

  • Mc Neil Dr.

  • Mc Neil Merrill Town

  • Mc Neil Round Rock

Phase 4

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd


Cherry Wood

Quiet Zone

  • IH -35 @ 38 ½ ST.

  • Wilshire Blvd.

  • 38 ½ ST

  • Cherry Wood

  • Manor Rd.

  • MLK Blvd.

  • 12 th ST.

  • Rosewood Ave.

  • Webberville Rd.

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd

Cherry Wood


Cherry Wood

Quiet Zone

  • 7th ST.

  • 7th ST.

  • Pedernales ST.

  • Robert Martinez

  • Chicon ST.

  • Comal ST.

  • Navasota ST.

  • Waller ST.

  • IH-35 4th ST.

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd

Cherry Wood


Final

Quiet Zone Map

Crystal Falls

Cedar Park

Avery Ranch

Phase 4

Crestview Wooten

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd

Cherry Wood


Final

Quiet Zone Map

  • Quiet Zone Establishment

  • Jurisdictional Authorities

  • Board Approval (ILA’s)

    • City of Austin

  • Design SSM

  • Coordination FRA

    • Extend Current Zones

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd


Community Outreach

Ohelen

Wooten Ped

Anderson Ln

Morrow

Lamar Blvd


ad