An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Management for KBS Projects AIAI The University of Edinburgh http://www.aiai.ed.ac.uk/

  2. Content of this lecture • What are the issues? • Conventional software development • How different is a KBS? • Waterfall life-cycle • Prototyping life-cycle • Knowledge engineering methodologies • KADS methodology • Spiral life-cycle

  3. What are the issues? • Management of the overall process of developing knowledge-based systems. • from identification and selection of applications • through requirements and knowledge capture, analysis, design, implementation and installation • to maintenance and decommissioning of systems • Planning, controlling and monitoring of • activities • products • resources (including staff)

  4. Conventional Software Development • Any software project has • Technical activities • Requirements capture and analysis, design, coding, testing, etc. • Technical products • Final deliverables - the system, training manuals, design documentation, etc. • Intermediate products - requirements specification, logical design, etc. • Management activities • Planning, controlling and monitoring the work of the project. • Management products • Plans, reports and other control documents.

  5. Are Conventional Methods Relevant? • Software development life-cycle models play a central role in the management of a project. • Technical methods specify • notations • techniques • guidelines • Life-cycle models provide guidance on • What activities need to be carried out? • In what order the activities need to occur? • What products should be produced? • Well-accepted for development of conventional applications • Relevant to knowledge-based applications?

  6. How different is a KBS? • The existing real-world processes are not as explicitly available as they are for conventional systems • Often based on tacit knowledge in someone’s head • Difficult to articulate • Unstructured? • The existing real-world process is often highly context dependent on the real world • Incomplete specification - ill-specified system

  7. Problems arising from differences • Difficult to observe existing process • More time needs to be spent on capture and analysis • Difficult to size and cost project until specification is well underway • Difficult to validate the knowledge in the specification • High context dependencies on real world may lead to more frequent changes in requirements • during development • during subsequent use (more frequent maintenance)

  8. Other problems • Applications often provide interactive decision support • complex human computer interactions • Novel application area • harder to predict impact of system • leads to business risks • Novel / complex computational structures and processes • computational viability harder to predict • leads to technical risks

  9. Waterfall Life-cycle Model • Conventional approach to software engineering Scoping and feasibility study Requirements analysis Design Coding Validation Maintenance • Advantages • Modularity • Verification of each stage

  10. Problems with the Waterfall Model • Assumes the perfect specification • Too prescriptive - basically sequential • limited iteration • Late detection of errors • has significant impact on costs • Exclusion of end users and clients • Takes little account of prototyping • Problems are aggravated for KBS • due to an incomplete and changing specification

  11. Prototyping • Prototype - a trial executable version of the prospective system • Can be applied both to conventional and KB applications • Several approaches • Rapid prototyping • Incremental prototyping • Throw-away prototyping • Find out what technology can do • Aid to knowledge acquisition • Most widely used approach to KBS development

  12. Rapid Prototyping • Development methodology / life-cycle model • No initial detailed specification required • Problems with rapid prototyping • Proper analysis may be neglected • Relies on intuition of developers • The danger of hacking-and-patching • Difficulty of maintaining an undocumented system • Difficulty of managing project • Development tends to be ad-hoc and unplanned • No verifiable milestones • When is it finished? • When is it "right"?

  13. Incremental Prototyping • Development methodology / life-cycle model • Also called structured prototyping • Combination of rapid prototyping and the waterfall life-cycle model • System developed in increments of functional capability • Problems with incremental prototyping • Lack of long term planning • Tempting to fall into "code-and-fix" model • May commit too many resources into a wrong solution

  14. Throw-away Prototyping • Used in conjunction with another methodology / life-cycle model • Exploratory prototypes • "prototyping the specification" • allow developer to understand application • users to see capability of system • a communication vehicle for ideas, expectations and requirements • Experimental prototypes • "prototyping the design" • test feasibility and adequacy of a design idea

  15. Which approach to KBS development? • Waterfall life-cycle model • has some drawbacks • Rapid prototyping • many problems • but has been the most dominant approach • Incremental prototyping • more recent approach • but still has drawbacks • Other life-cycle models? • Spiral / Cyclic • Product-oriented • Risk-driven

  16. Knowledge Engineering Methodologies • ESPRIT Projects • KADS • VITAL • UK Government - CCTA • GEMINI • Management Consultancies • Ernst & Young - STAGES • Coopers & Lybrand - Summit-DK • Andersen Consulting - Model-1 • etc

  17. CommonKADS - Overview • Model-based development methodology for KBS • Cyclic life-cycle model for project management • Comprehensive • from application selection and impact assessment • to physical design and testing • Support tools

  18. Overview of the CommonKADS Model Set

  19. Why a Modelling Approach? • Different perspectives on knowledge • who, what, how, when, where, why • Different levels of abstraction • organisation, process, expertise, system design • Allows greater management control of process • Provides common basis for communicating • Allows reuse of structure and content

  20. Model Development • Initial step is to identify models to be developed • may need several instances of some models • “as-is” models and “to-be” models • not all models may be required for all projects • Models are persistent and evolve • form part of the deliverables • essential for maintenance

  21. Project Management Activity Cycle Review Generate Alternative Approaches Identify Approach Constraints Refine Objectives Eliminate Untenable Approaches Review & Commit Identify & Document Risks Plan Next Cycle Review Against Expected Progress Risk Analysis Risk Select Approach Acceptance Assessment Monitor Development Generate Plan Agree Acceptance Contract Monitor Plan

  22. Risks • Technical, business, project • technology, financing, users • Evaluate Likelihood and Impact • low/medium/high • Take steps to insure against any risks that are medium/high likelihood and medium/high impact

  23. Model States • States are used to plan and control the development of a model • States are used to indicate • landmarks (associated with cycle review) • milestones (delivered to client) • obligatory states (must be produced due to quality implications)

  24. Qualitative Value empty requirements identified constraints identified inputs identified identified described verified validated completed discarded signed-off Qualitative State Values

  25. Summary • KBS projects are different from conventional software projects • knowledge based • knowledge is not easily available • knowledge may be context dependent • Approaches to project management • Waterfall model • Prototyping • rapid prototyping • incremental prototyping • throwaway prototyping • Cyclic management activity model