An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Step 1: Marking of Ceiling Uprights Mark the position of the ceiling studs around the perimeter of the space on the top of drywall ceiling framing using a pencil. Also, note the position of any boxed lights, electrical boxes, and accessories. You will need to understand where the gaskets and fittings are when it comes to the drywall ceiling.

  2. Step 3: Installation of the initial panel The corner of the ceiling, drywall ceiling lift, and hold the sheet of drywall in place with the help of another person, a T Brace or a freight elevator. Either one T Brace could be propped up or 2 T Braces could be propped up with each other to secure the sheet work. These braces should also be slightly higher than the height of the ceiling. Hold the sheet carefully to secure it. What is drywall ceiling thickness? Some building codes must 5/20 cm thick panels for fire panels or ceilings. But, for many entrepreneurs, this can be a regular practice. Step 2: Apply Adhesive to Joists This can be optional, but in case you chose to do so, use glue on the joist surface. Run the beads from the caulk container as far as direct working time allows.

  3. Step 4: Assessment of the panel in place Screws are preferred over claws, but if driving the ring shank nails, move them about 18 cm apart. With glue, spread the claws 1/3 of the board or 41 cm. Create the concave dimple using the entire drywall hammer on the next swing. Make sure you don't shatter the newspaper. For the screws, drive the screws directly, spaced 30 cm in the center without glue, and also at most 41 cm in the center with glue. Place them within 3/20 cm of the edge of this sheet. All misfires should be reversed and prevent joist edging, if possible.

  4. Step 5: Panels that wish to be cut Partly secure any sheet with exterior items (which would be for getting cuts) like electrical boxes and can light up. Run the Electric Cutter by locating a central part, then move around the perimeter. Otherwise, saw manually using a handsaw. Finish tightening the screws on this board and continue to complete the path along the length of the ceiling. Read here:How to Use Drywall Anchors

  5. Step 6: Hang panels haste Continue with the next lesson by knocking the 1/2 sheet butt seams in the very first lesson. Note: Some older ceiling joists were 24 inches in the center. 1 option is to mount 5/20 cm or sag-resistant panels on wider spans where weight is an issue.

  6. Best Drywall Installer in Toronto Mas Construction Painting Contractor Amos Crescent, Toronto, ON City - NORTH YORK Zip - M3H 3X8 +1 647-835-0590 Info@Mascons.Ca www.mascons.ca