1 / 15

ATOMEXPO 2010

ATOMEXPO 2010. Senior Vice President, Alstom Power Guy Chardon 08/06/2010. Alstom Nuclear Equipment At the heart of the Nuclear Power Plant. Nuclear island. Turbine island. Balance of Plant. Alstom Nuclear Equipment Fitting all type of reactors. EPR VVER1200 AP1000 700 MWe PHWR (India)

marva
Download Presentation

ATOMEXPO 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATOMEXPO 2010 Senior Vice President, Alstom Power Guy Chardon 08/06/2010

  2. Alstom Nuclear EquipmentAt the heart of the Nuclear Power Plant Nuclear island Turbine island Balance of Plant AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 2

  3. Alstom Nuclear EquipmentFitting all type of reactors • EPR • VVER1200 • AP1000 • 700 MWe PHWR (India) • Kerena AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 3

  4. Alstom Nuclear EquipmentBest Performance out of Any Nuclear Reactor • Best efficiency with single flow expansion: • Proven combined HP/IP module. • Continuous R&D developments. • Excellent Reliability: • 300,000 Operating Hours experience. • Solid welded rotor: • Best resistance to Stress Corrosion Cracking. • Secured supply chain. • Mature family of last stage blades: • Oskarshamn 3 Last stage Blade (1750 mm) is world longest operating blade since 2009. • Design for low maintenance cost: • Reliability and durability proven by 300,000 Operating Hours experience. Chooz first ARABELLE Oskarshamn 3 LP Rotor AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 4

  5. Key Player of Nuclear RenaissanceMain contracts in Execution (New and Retrofit) Switzerland • Leibstadt Mexico • Laguna Verde 1+2 France • Flamanville 3 USA • Calvert Cliffs 3 • North Anna 1+2 • Surry 1+2 • Quad Cities 1+2 • Dresden 2+3 • Peach Bottom 2+3 • San Onofre 2+3 • Fort Calhoun South Africa • Koeberg 1+2 Sweden • Ringhals 4 South Korea • Ulchin 1+2 Finland • Olkiluoto 1+2 China • Ling Ao 3+4 • Taishan 1+2 • Hongyanhe 1-4 • Ningde • Fuqing • Fangjiashan 1 + 2 Legend • New Equipment • Retrofit AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 5

  6. Main contracts in ExecutionFlamanville 3, 1750 MWe in France • Turbine Island excluding Civil: • Power Conversion systems, transportation and site erection. • Other Equipment such as: • Circulating Water pumps, Emergency Generator, etc. April 2010 March 2010 World largest ARABELLETM steam turbine Lifting of an LP heater at site AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 6

  7. Main contracts in ExecutionQuad Cities 2,900 MWe Retrofit in USA • Supply of 3 Low Pressure Turbine inner block retrofits and full Installation. MWe output uplift guarantee provided. • Installation completed within the 24 day, turbine synchronized on 18th April 2010. • Quad Cities 2 is the first of six Nuclear retrofit projects with Exelon, the last being completed in 2014, each designed to increase the efficiency, reliability and capacity of each power plant. Steam Turbine rotor, Chattanooga facility AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 7

  8. A worldwide organizationA global business footprint … Chattanooga: • Execution center • Calvert Cliffs 3 project management Levallois: • Execution centre • Nuclear systems integration R&D St Petersburg: • AAEM execution center • Tendering support and local supply chain development India: • Execution center • Local sourcing Wuhan: • Engineering Execution center • Local supply chain development AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 8

  9. A worldwide organization…relying on a global manufacturing network Rotating Machines: Beijing, Belfort, Bexbach, Birr, Elblag (Foundry), Elblag (Turbines), Chattanooga (turbines), Mannheim, Morelia, Wroclaw. Static Equipment: Budapest, Brno, Durgapur, Neumark, Sizhou, Setubal, Surabaya, Wuhan , Chattanooga (boilers). Service Factories: Berlin, Richmond, Bucharest T, Bucharest G, Rugby, Sesto, Gatineau, Stafford, Karlovac. Other factories:Shahabad, Wellsville, Concordia, Kassel, Vinhedo, Osaka, Shanghai. Rotating Machines Static Equipment Service Factories Other Factories AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 9

  10. A worldwide organizationAlstom is extending its nuclear activity INDIA • Alstom Technology has been selected by NPCIL and BHEL for the new 700 MW Indian designed PHWR Nuclear power plant program. • Alstom is working with Areva on the EPR project Jaitapur for NPCIL, to supply Conventional Island. USA • Manufacturing and engineering of large equipment for nuclear, gas new and retrofit in Chattanooga • Operational in June 2010 • World’s largest balancing facility • Easy access to 80% of existing or planned US nuclear power plants • 350.000 m2 under a single roof AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 10

  11. Alstom’s nuclear activity in Russia Alstom set-up Joint Venture AAEM with AEM, Rosatom affiliate. 49% 51% License to manufacture turbine - generator equipment based on ARABELLE™ technology AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 11

  12. Alstom’s nuclear activity in Russia • Good progress in Technology Transfer to AAEM JV. • Alstom is ready for the next steps: • To develop manufacturing in Russia and execute projects based on VVER1200 reactors. AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 12

  13. www.alstom.com

  14. AAEM manufacturing facility in PodolskRenovation project Workshop space: ~ 53,000 sq. m. Office space:~ 15,000 sq.m. Employees: ~ 840. Special machines and tools: 43 pcs. Heat treatment equipment: 14 pcs. Welding equipment: 29 pcs. Blanking equipment: 6 pcs. Automatic lines: 2 pcs. Stands and benches: 51 pcs. Презентация - 01/01/2007 - P 14

  15. Transfer and adaptation of technical information is up and running at the JV • A common information space has been established to join the Engineering Centre in St.Petersburg and the manufacturing facility in Podolsk. • The system for project information exchange (PIRS) allows AAEM’s integration into the common framework of data flow between Alstomand its partners. Customers AEM ALSTOM Suppliers Secure VPN channel between Alstom and AAEM St. Petersburg Podolsk Engineering Centre Manufacturing AtomExpo 2010 - Guy Chardon - 08/06/2010 - P 15

More Related